Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L7971999-10-20020 October 1999 Submits Results of Review of 990521 & 0709 Ltrs Which Provided Core Shroud Insp Results & Tie Rod Stabilizer Assemblies ML20217G1291999-10-15015 October 1999 Forwards Errata to Safety Evaluation for Amend 168 Issued to FOL DPR-63 on 990921.Description of Flow Control Trip Ref Cards to Be Consistent with Application for Amend ML20217K2831999-10-14014 October 1999 Submits Response to NRC Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, for Fiscal Yrs 2000 & 2001 ML20217H3211999-10-0808 October 1999 Forwards Changed Pages for Issue 5,rev 1 of Nine Mile Point Station Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p).Without Encls ML20212K8601999-10-0606 October 1999 Responds to Concern in 990405 Petition Re Residual Heat Removal Alternate Shutdown Cooling Modes of Operation at Nine Mile Point Nuclear Station,Unit 2 ML20216J9311999-09-30030 September 1999 Forwards Response to NRC 981119 Suppl RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20212J4651999-09-30030 September 1999 Informs of Completion of mid-cyle PPR of Nine Mile Point Nuclear Station on 990916.Determined That Problems in Areas of Human Performance & Work Control Required Continued Mgt Attention.Historical Listing of Plant Issues Encl ML18040A3701999-09-30030 September 1999 Provides Changes to Application for Amend Re Volumes 1-11 of 981016 Submittal & Discard & Insertion Instructions Re Integration of Proposed Changes,In Response to NRC RAIs ML20212K8641999-09-30030 September 1999 Informs That During 990927 Telcon Between J Williams & J Bobka,Arrangements Were Made for Administration of Exams at Plant During Wk of Feb 14,2000.Preliminary RO & SRO License Applications Should Be Submitted 30 Days Prior Exam ML20212J8831999-09-30030 September 1999 Informs That Util 980810 & 990630 Responses to GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at NPPs Acceptable. NRC Considers Subj GL to Be Closed for Plant ML20212E9801999-09-23023 September 1999 Submits Info in Response to Request for Estimated Initial Operator Licensing Exam Needs,Per Administrative Ltr 99-03 ML20216F7101999-09-17017 September 1999 Forwards Response to NRC 990806 RAI Re USI A-46,verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.Nrc Is Informed That Actions Required for Resolution of USI A-46 Have Been Completed ML20212B2821999-09-14014 September 1999 Responds to 990712 Correspondence Which Responded to NRC Ltr Re High Failure Rate for Generic Fundamentals Exam of 990407 for Nine Mile Point.Considers Corrective Actions Taken to Be Acceptable ML20212D8981999-09-14014 September 1999 Forwards ISI Summary Rept for Refueling Outage 15 & Flaw Indication Repts.Supporting Info Repts & Calculations, Encl ML20212B2581999-09-10010 September 1999 Requests That Name of Bm Bordenick Be Removed from Nine Mile Point,Units 1 & 2 Service List ML20211P5771999-09-10010 September 1999 Forwards Application for Amends to Licenses DPR-63 & NPF-69, to Transfer Licenses to Amergen Energy Co,Llc.Ts Pages & Proprietary Addendum,Included.Proprietary Encl Withheld ML20212A1341999-09-0707 September 1999 Forwards Summary Rept Secondary Containment Leakage Testing, Dtd June 1999 for Nine Mile Point,Unit 1,IAW TS 6.9.3.f ML20211K8141999-09-0101 September 1999 Forwards Reactor Containment Bldg Ilrt,Iaw Plant TS 6.9.3.e.Testing Confirmed That TS 3.3.3/4.3.3 & 6.16 Primary Containment Leakage Requirements Were Satisfactorily Met ML20211L9221999-09-0101 September 1999 Confirms That Licensee Will Retain Weld 32-WD-050 as IGSCC Category F Until Completion of Reinspection Program,In Response to NRC ML20211J6461999-08-30030 August 1999 Forwards Response to NRC 990625 RAI Re NMPC Responses to GL 92-01,rev 1,supplement 1, Reactor Vessel Structural Integrity ML20211K3001999-08-30030 August 1999 Forwards Semi-Annual Radioactive Effluent Release Rept for 990101-990630 & Revised ODCM, for Nine Mile Point,Unit 1. Format Used for Effluent Data Is Outlined in App B of Regulatory Guide 1.21,rev 1 ML20211K5031999-08-30030 August 1999 Responds to Ltr Addressed to Chairman Dicus, Expressing Concerns Involving 990624 Automatic Reactor Shutdown.Insp Findings & Conclusions Will Be Documented in Insp Repts 50-220/99-06 & 50-410/99-06 by mid-Sept 1999 ML20211H1921999-08-26026 August 1999 Forwards Application for Amend to License DPR-63,supporting Implementation of Noble Metal Chemical Addition by Raising Reactor Water Conductivity Limits in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b ML20211P5161999-08-26026 August 1999 Discusses Submitted on Behalf of Niagara Mohawk Power Corp Written Comments Addressing 10CFR2.206 Petition & Request That Ltr & Attached Response Be Withheld from Public Disclosure.Request Denied ML20211G4921999-08-26026 August 1999 Advises That Info Re Comments Addressing 10CFR2.206,dtd 990405 Will Be Withheld from Public Disclosure,In Response to ML20211D7731999-08-20020 August 1999 Forwards Semiannual FFD Program Performance Data Rept Covering Period 990101 Through 990630 ML20211B9371999-08-18018 August 1999 Provides Addl Info Re Application of Method a at Nmp,Unit 1 as Described in Generic Implementation Procedure,Rev 2 (GIP-2),NRC Supplemental SER 2 & Documents Ref in GIP-2 Upon Which GIP-2 Is Based ML18040A3691999-08-16016 August 1999 Forwards Response to NRC 990510 RAI Pertaining to NMP Application for Amend Re Conversion of NMPNS Unit 2 Current TS to Its.Nrc Requested Info Re Several Sections,Including Section 3.6, Containment Sys. ML20210Q0031999-08-11011 August 1999 Informs That Due to Printing Malfunction,Some Copies of Author Ltr Dtd 990726,may Not Have Included Second Page of Encl 2 of Ltr ML20210R6661999-08-10010 August 1999 Confirms Conversation on 990721 Re Concerns of Syracuse Anti-Nuclear Effort on Status of 2.206 Petition (Filed 990524) & Upcoming NRC Performance Review Meeting on Nine Mile Point Units 1 & 2 ML20210R8101999-08-10010 August 1999 Forwards 1998 Annual Repts for NMP & co-tenants,including Rg&E,Energy East Corp/Nyse&G,Chg&E & Long Island Power Authority,Per 10CFR50.71(b) ML20210L5321999-08-0606 August 1999 Forwards List of Subjects Discussed During 990714 Telcon with Representatives of Niagara Mohawk Power Corp on Unit 1 Re USI A-46 Issue ML18041A0711999-07-30030 July 1999 Forwards Rev 1 to NMP2-ISI-006, Second Ten Year Interval ISI Program Plan for Nine Mile Point Nuclear Power Station Unit 2. Significant Changes from Rev 0 Listed ML20210J9351999-07-29029 July 1999 Informs That NMP Is Changing Completion Date for Replacement of Valves Having O Rings with Installed Life Greater than Eight Years.Replacement to Be Completed by 991031, During Hydrogen Monitoring Sys Maintenance Outage ML20216E1491999-07-26026 July 1999 Forwards Two Ltrs Received from NMPC Re Nine Mile Point Unit 1 Core Shroud Related to 10CFR2.206 ML20210E9151999-07-23023 July 1999 Discusses Evaluation of Recirculation Line Weld 32-WD-050 Indication Found During 1997 Refueling Outage (RFO14) at NMPNS Unit 1.Requests Notification of Decision to Retain Category F Classification Until Listed Conditions Satisfied ML20209G7911999-07-12012 July 1999 Provides Info Requested in NRC Re 990407 Generic Fundamentals Exam Failure Causes & Corrective Actions ML20209G3711999-07-12012 July 1999 Provides Final Root Cause Evaluation Re GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 1 ML20209G2001999-07-0909 July 1999 Forwards RFO-15 Core Shroud Insp Summary Rept, as Required by GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in BWRs & BWRVIP Rept BWR Core Shroud Insp & Flaw Evaluation Guideline (BWRVIP-01) ML20209F8561999-07-0606 July 1999 Forwards Rev 1 to Nmp,Unit 1 COLR for Cycle 14. Rept Is Being Submitted to Commission in Compliance with TS 6.9.1.f.4 ML20211K5071999-07-0606 July 1999 Submits Concerns Re 990624 Event Involving Automatic Reactor Shutdown.More than 5 Failures Were Identified in Event Number 35857 ML20196J6421999-06-30030 June 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, Issued on 960110 ML20209B7071999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Facilities,As Contained in GL 98-01,Supp 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure,Encl ML20211P5271999-06-29029 June 1999 Submits Written Comments Addressing Petition Dtd 990405, Submitted by R Norway as It Relates to Expressed Concerns That Involve NMPC Activities.None of Relief Requested in Petition Warranted ML20196K6461999-06-29029 June 1999 Discusses Ofc of Investigations Rept 1-98-33 Re Unqualified Senior Reactor Operator Assuming Position of Assistant Station Shift Supervisor at Unit 1 on 980616.One Violation Being Cited as Described in Encl NOV ML20209B3501999-06-25025 June 1999 Submits Torus Shell & Coupon Corrosion Rate Determination for Nmpns,Unit 1.Torus Meets ASME Code Requirements,Iaw NRC 920825 & 940811 SERs ML20212J4431999-06-25025 June 1999 Discusses Responses to RAI Re GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20209B3531999-06-25025 June 1999 Informs NRC That All Actions Associated with NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs, Has Been Completed.Summary of Actions Completed & Other Pertinent Info Is Provided in Attachment ML20196F5721999-06-23023 June 1999 Forwards Rev 3 to NMP1-IST-003, Third Ten Year Inservice Testing Program Plan, Which Will Begin on 991226.Program Plan Conforms to Requirements of 1989 Edition of ASME Boiler & Pressure Vessel Code.Three Relief Requests,Encl ML20196G1461999-06-23023 June 1999 Informs That Actions Requested in GL 96-01, Testing of Safety-Related Logic Circuits Completed 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K2831999-10-14014 October 1999 Submits Response to NRC Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, for Fiscal Yrs 2000 & 2001 ML20217H3211999-10-0808 October 1999 Forwards Changed Pages for Issue 5,rev 1 of Nine Mile Point Station Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p).Without Encls ML18040A3701999-09-30030 September 1999 Provides Changes to Application for Amend Re Volumes 1-11 of 981016 Submittal & Discard & Insertion Instructions Re Integration of Proposed Changes,In Response to NRC RAIs ML20216J9311999-09-30030 September 1999 Forwards Response to NRC 981119 Suppl RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20212E9801999-09-23023 September 1999 Submits Info in Response to Request for Estimated Initial Operator Licensing Exam Needs,Per Administrative Ltr 99-03 ML20216F7101999-09-17017 September 1999 Forwards Response to NRC 990806 RAI Re USI A-46,verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.Nrc Is Informed That Actions Required for Resolution of USI A-46 Have Been Completed ML20212D8981999-09-14014 September 1999 Forwards ISI Summary Rept for Refueling Outage 15 & Flaw Indication Repts.Supporting Info Repts & Calculations, Encl ML20212B2581999-09-10010 September 1999 Requests That Name of Bm Bordenick Be Removed from Nine Mile Point,Units 1 & 2 Service List ML20211P5771999-09-10010 September 1999 Forwards Application for Amends to Licenses DPR-63 & NPF-69, to Transfer Licenses to Amergen Energy Co,Llc.Ts Pages & Proprietary Addendum,Included.Proprietary Encl Withheld ML20212A1341999-09-0707 September 1999 Forwards Summary Rept Secondary Containment Leakage Testing, Dtd June 1999 for Nine Mile Point,Unit 1,IAW TS 6.9.3.f ML20211K8141999-09-0101 September 1999 Forwards Reactor Containment Bldg Ilrt,Iaw Plant TS 6.9.3.e.Testing Confirmed That TS 3.3.3/4.3.3 & 6.16 Primary Containment Leakage Requirements Were Satisfactorily Met ML20211L9221999-09-0101 September 1999 Confirms That Licensee Will Retain Weld 32-WD-050 as IGSCC Category F Until Completion of Reinspection Program,In Response to NRC ML20211K3001999-08-30030 August 1999 Forwards Semi-Annual Radioactive Effluent Release Rept for 990101-990630 & Revised ODCM, for Nine Mile Point,Unit 1. Format Used for Effluent Data Is Outlined in App B of Regulatory Guide 1.21,rev 1 ML20211J6461999-08-30030 August 1999 Forwards Response to NRC 990625 RAI Re NMPC Responses to GL 92-01,rev 1,supplement 1, Reactor Vessel Structural Integrity ML20211H1921999-08-26026 August 1999 Forwards Application for Amend to License DPR-63,supporting Implementation of Noble Metal Chemical Addition by Raising Reactor Water Conductivity Limits in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b ML20211D7731999-08-20020 August 1999 Forwards Semiannual FFD Program Performance Data Rept Covering Period 990101 Through 990630 ML20211B9371999-08-18018 August 1999 Provides Addl Info Re Application of Method a at Nmp,Unit 1 as Described in Generic Implementation Procedure,Rev 2 (GIP-2),NRC Supplemental SER 2 & Documents Ref in GIP-2 Upon Which GIP-2 Is Based ML18040A3691999-08-16016 August 1999 Forwards Response to NRC 990510 RAI Pertaining to NMP Application for Amend Re Conversion of NMPNS Unit 2 Current TS to Its.Nrc Requested Info Re Several Sections,Including Section 3.6, Containment Sys. ML20210R6661999-08-10010 August 1999 Confirms Conversation on 990721 Re Concerns of Syracuse Anti-Nuclear Effort on Status of 2.206 Petition (Filed 990524) & Upcoming NRC Performance Review Meeting on Nine Mile Point Units 1 & 2 ML20210R8101999-08-10010 August 1999 Forwards 1998 Annual Repts for NMP & co-tenants,including Rg&E,Energy East Corp/Nyse&G,Chg&E & Long Island Power Authority,Per 10CFR50.71(b) ML18041A0711999-07-30030 July 1999 Forwards Rev 1 to NMP2-ISI-006, Second Ten Year Interval ISI Program Plan for Nine Mile Point Nuclear Power Station Unit 2. Significant Changes from Rev 0 Listed ML20210J9351999-07-29029 July 1999 Informs That NMP Is Changing Completion Date for Replacement of Valves Having O Rings with Installed Life Greater than Eight Years.Replacement to Be Completed by 991031, During Hydrogen Monitoring Sys Maintenance Outage ML20209G3711999-07-12012 July 1999 Provides Final Root Cause Evaluation Re GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 1 ML20209G7911999-07-12012 July 1999 Provides Info Requested in NRC Re 990407 Generic Fundamentals Exam Failure Causes & Corrective Actions ML20209G2001999-07-0909 July 1999 Forwards RFO-15 Core Shroud Insp Summary Rept, as Required by GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in BWRs & BWRVIP Rept BWR Core Shroud Insp & Flaw Evaluation Guideline (BWRVIP-01) ML20209F8561999-07-0606 July 1999 Forwards Rev 1 to Nmp,Unit 1 COLR for Cycle 14. Rept Is Being Submitted to Commission in Compliance with TS 6.9.1.f.4 ML20211K5071999-07-0606 July 1999 Submits Concerns Re 990624 Event Involving Automatic Reactor Shutdown.More than 5 Failures Were Identified in Event Number 35857 ML20209B7071999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Facilities,As Contained in GL 98-01,Supp 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure,Encl ML20211P5271999-06-29029 June 1999 Submits Written Comments Addressing Petition Dtd 990405, Submitted by R Norway as It Relates to Expressed Concerns That Involve NMPC Activities.None of Relief Requested in Petition Warranted ML20209B3501999-06-25025 June 1999 Submits Torus Shell & Coupon Corrosion Rate Determination for Nmpns,Unit 1.Torus Meets ASME Code Requirements,Iaw NRC 920825 & 940811 SERs ML20209B3531999-06-25025 June 1999 Informs NRC That All Actions Associated with NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs, Has Been Completed.Summary of Actions Completed & Other Pertinent Info Is Provided in Attachment ML20196G1461999-06-23023 June 1999 Informs That Actions Requested in GL 96-01, Testing of Safety-Related Logic Circuits Completed ML20196F5721999-06-23023 June 1999 Forwards Rev 3 to NMP1-IST-003, Third Ten Year Inservice Testing Program Plan, Which Will Begin on 991226.Program Plan Conforms to Requirements of 1989 Edition of ASME Boiler & Pressure Vessel Code.Three Relief Requests,Encl ML20209B2951999-06-22022 June 1999 Informs That Training Re Pressure Relief Panels Was Completed for Remainder of Target Population on 990226 ML20196E9231999-06-21021 June 1999 Forwards Response to NRC 990510 RAI Re NMP 981116 Application Proposing Changes to TSs to Provide Reasonable Assurance That Coupled neutronic/thermal-hydraulic Instabilities Were Detected & Suppressed in NMPN-1 Reactor ML18040A3651999-06-0707 June 1999 Forwards for Filing Original Application of Central Hudson & Gas & Electric Corp Seeking Extension of Expiration Date of Order,Dtd 980719,issued by Commission ML18040A3661999-06-0404 June 1999 Informs That Entire Attachment to Ltr NMP2L 1862 Dtd 990421, Should Be Replaced with Entire Attachment Being Sent with Present Ltr ML20195C9751999-06-0101 June 1999 Informs That Weld 32-WD-050 Will Be Reclassified Back to GL 88-01 Category a Weld & ASME Code Section XI Insps Will Be Conducted in Next Three Insp Periods ML20195C9601999-05-28028 May 1999 Provides Final Extent of Condition Evaluation Re Failed Cap Screw Beyond Upper Spring.Nmpc Continues to Conclude as Stated in That No Addl Mods Are Needed Other than Those Indicated in Ltr ML20207F1811999-05-24024 May 1999 Petitions NRC to Suspend Operating License of NMP for NMPNS Unit 1 Until Such Time as NMPC Releases Most Recent Insp Data on Plant Core Shroud & Adequate Public Review of Plant Safety Accomplished Because of Listed Concerns ML20195B1861999-05-21021 May 1999 Requests Staff Approval of Proposed Mod to Each of Four Tie Rods Per 10CFR50.55a(a)(3)(i).Summary of Tie Rod Insp Findings,Summary of Root Cause Evaluation of Failure of Cap Screw,Calculation B-13-01739-23 & Summary of Se,Encl ML20207D1541999-05-21021 May 1999 Forwards Issue 5,rev 0 of Physical Security & Safeguards Contingency Plan for Nmpns.Summary of Changes Included to Facilitate Review.Encls Withheld ML20207D5331999-05-21021 May 1999 Forwards Issue 3,Rev 1 of NMP Nuclear Security Training & Qualification Plan.Summary of Changes Is Included with Plan to Provide Basis for Individual Changes & to Facilitate NRC Review.Plan Withheld Per 10CFR2.790 ML20206S2621999-05-16016 May 1999 Expresses Concerns About Safety of Nmp,Unit 1 Nuclear Reactor.Nrc Should Conduct Insp of Reactor Including Area Besides Core Shroud Welds & Publicly Disclose Results at Least Wk Before Restart Date ML20195D5911999-05-13013 May 1999 Submits Final Copy of Open Ltr to Central Ny,With Proposals Re Nine Mile One Core Shroud Insp During Refueling Outage Which Began on 990411 ML20206P1981999-05-11011 May 1999 Forwards Response to NRC RAI Re NMP Previous Responses to GL 96-05, Periodic Verification of Design-Basis of SR Movs, for NMP Units 1 & 2 ML20206R6941999-05-10010 May 1999 Responds to 990413 & 0430 Ltrs Re Apparent Violation Noted in Investigation Rept 1-98-033.Util Agrees with Violation, But Disagrees with Characterization That Violation Was Willful or Deliberate ML20206N0291999-05-0707 May 1999 Forwards Rev 39 to NMP Site Emergency Plan & Revised Epips,Including Rev 1 to EPMP-EPP-03,rev 5 to EPIP-EPP-25 & Rev 5 to EPIP-EPP-28 ML20206G8121999-04-30030 April 1999 Forwards Comments on Draft Reg Guide DG-1083, Content of UFSAR IAW 10CFR50.71(e), Dtd Mar 1999.Util Generally Supports DG-1083 ML20206F7731999-04-22022 April 1999 Forwards Renewal Application for SPDES Permit Number NY-000-1015 for Nmpns,Units 1 & 2 1999-09-07
[Table view] |
Text
CATEGORY REG ORY INFORMATION DISTRIBUT SYSTEM (RIDS)
ACCESSIOl.". 5lBR:9802260261 DOC.DATE: 98/02/19 NOTARIZED: NO DOCKET FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe 05000220 AUTH.NAME AUTHOR AFFIL1ATION MUELLER,J.H. Niagara Mohawk Power Corp; RECIP . NAME RECIPIENT AFFILIATION COLLINS,S.J.
SUBJECT:
Followup to NRC. staff 980128 meeting re reportability of blowout panel deficiencies. C DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID. CODE/NAME LTTR ENCL PD1-1 PD HOOD,D INTERNAL: ACRS 2 AEOD/S PD/RAB 1 OD/ C 1 DEDRO 1 FILE CE 1 NRR/DRCH/HHFB 1
/5RPM PECB 1 NRR/DRPM/PERB 1 NUDOCS-ABSTRACT 1 OE DIR 1 OGC/HDS3 1 RGN1 FILE 01 1 EXTERNAL: LITCO BRYCEiJ H NOAC NRC PDR NUDOCS FULLTEXT D
0 E
N NOTE TO 'ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL
'~
Niagara Mohawk ~ . ~
John'H. Mueller Otha t315) 3l9.7907 Fax: t315)3l9-1321 Senior NcePnmM and Chief Nudear ORer OEll8t lnuSIOrofklXLCRl February 19, 1998 NMP1L 1288 Mr. Samuel J. Collins Director, Office of NRR "U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 RF.: Nine Mile Point Unit 1 Docket No. 50-220
Subject:
Notice of Violation II.B Dated June 1S, 1996
Dear Mr. Collins:
This letter is a followup to the meeting between Niagara Mohawk Power Corporation (NMPC) and NRC staff on January 28, 1998 regarding reportability of blowout panel deficiencies.
Once again, thank you for the opportunity for NMPC to have this dialogue with you and other NRC staff regarding the important issue raised in the subject violation and subsequent correspondence between'MPC and the NRC..As we stated at the meeting, NMPC does not as a matter of course argue a level 4 violation to the extent we have in this case. However, we believe the ramifications of accepting the violation are significant to NMPC and the nuclear industry.
As we agreed at the conclusion of the meeting, we are providing this letter to summarize key points'that NMPC made during the meeting. Following are the bases for our disagreement with the violation:
I This guide was used in preparing the Nine'Mile Point Unit 1 (NMP1) Final Safety Analysis Report (FSAR). The General Consideration section of the guide presents the hierarchy of principle criteria for design, design bases and how the plant meets the plant performance objectives. As we indicated in the meeting with the example for
'P80226026i 9802i9 PDR ADOCK 05000220 . llllllllillllllllllllllllllillllllllllil P PDR Nine Mile Point Nudear Station, PO. Box 63, Lycoming, New York 13093
Page 2 the Containment System, the Design Bases. section of the FSAR was intended to define the principle functions that are needed to protect public health and safety. This guide also provides insight into the true intent of 10CFR50.2 which was issued at about the same time. In addition, the guide separately describes design features of the containment structures and the explanation for their selection which should be in the FSAR. That guidance clearly distinguishes between design bases and design features.
When the NMP1 FSAR was developed, it was formatted so that the design features were subsections of the Design Bases section. The format could have been a separate section for design features which would have clearly distinguished between the two aspects. It is NMPC's considered opinion that the blowout panels are a design feature, whose primary function is to protect the building superstructure. The'key parameter in performing that function is to maintain internal pressure below 80 psf. NMPC believes that the guide better defines what was intended to be design bases than what was
~
formatted in the NMP1 FSAR. Finally, it seems inappropriate to consider design bases to be a term such as "approximately 45 psf ".
The language in 10CFR50.72(b)(1)(ii) clearly indicates that a one hour report is needed d (000)(70.73(l(3)(")30d2 j ( ~ 'Hy 3 outside the design bases g jQ~lanl. The event for which we are cited did not, at the time, involve any serious degradation or being outside the design bases of the plant as described above.
As we stated, it is NMPC's practice to report under 10CFR50.72(b)(1)(ii) when we are uncertain whether a deviation is outside of the design bases in order to prevent possible violation of the regulation. Ifafter subsequent review it is determined that the design bases is not encroached and therefore not reportable, that notification is retracted.
When the wrong sized bolts were found in the blowout panels, the engineers involved determined, based upon engineering judgment, that the blowout panels would have relieved below 80 psf. Therefore, the event was not reported.
The statements of considerations when 10CFR50.72 and 10CFR50.73 were developed and revised indicate the rules were intended for
. In addition, the statements of considerations indicate a loss of safety margins that apply to individual components is not reportable.
A' Page 3
~
>'> ~
r NMPC does not believe that this deficiency in the blowout panel needed immediate action by the NRC. The deviation was a change in a setpoint of a single component with no reduction in safety margins as the internal pressure would remain below 80 psf.
Reporting.was accordingly not required.
I ~ ~
I sl An example in NUREG 1022 which we believe is analogous to the blowout panel is on page 37 of the second draft of Rev. 1. That example discusses initial reporting of a missing high energy line break pipe restraint which was then retracted after analysis showed that the design bases had not been exceeded. Based upon familiarity with our own and industry practice, such an analysis would almost certainly involve evaluation of piping and pipe support stresses. Ifthe analysis demonstrated code allowable stresses were not exceeded, the condition. would not be outside of the design bases of the plant.
The Reactor Building and Turbine Building structural design bases is 80 psf, which is analogous to a code allowable. The blowout panels relief analysis determined that 45 psf had been exceeded, however, the design allowable (80 psf) had not been exceeded.
The preceding summarizes the arguments made during our meeting on January 281998. One additional point of clarification made during the meeting was that Mr. Thadani's letter on September 12, 1997 alludes that'80 psf is the failure point of the Turbine Building and Reactor Building. As demonstrated by analysis, the failure point of both buildings is well in excess of 100 psf.
Very truly yours, ohn H. Mueller Chief Nuclear Officer JHM/GJG/cmk xc: Mr. H. J. Miller, Regional Administrator, Region I Mr. B. S. Norris, Senior Resident Inspector Mr. S. S. Bajwa, Director, Project Directorate I-l, NRR Mr. D. S. Hood, Senior Project Manager, NRR
~Document Contxol Desk Records Management
0