Pages that link to "PNO-II-85-070B, monitoring of Tropical Storm Bob Terminated.Natl Weather Svc No Longer Issuing Special Repts on Storm"
Jump to navigation
Jump to search
The following pages link to PNO-II-85-070B, monitoring of Tropical Storm Bob Terminated.Natl Weather Svc No Longer Issuing Special Repts on Storm:
Displayed 50 items.
- PNO-II-97-017, on 970312,licensee Reported Employee Collapses Onsite.First Aid Administered Until Ambulance Arrived. Employee Transported to Appling County General Hosp in Baxley,Ga & Pronounced Dead.Autopsy Will Be Performed (← links)
- PNO-II-86-004, on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm (← links)
- PNO-II-85-088, on 850910,reactor Manually Tripped from 100% Power.Caused by Excessive Vibration in Reactor Coolant Pump & Loose Parts Monitor Alarm in Same Cooling Loop.Unit in Cold Shutdown for Investigation of Problem & Repairs (← links)
- PNO-II-86-017, on 860223,contract Const Worker Lost Footing & Fell 3 Ft in Drywell.Cause Not Stated.Worker Sent to Hosp.No Contamination Found on Worker,Protective Clothing,In Ambulance or at Hosp (← links)
- PNO-II-85-121, on 851221,safety Equipment in Southeast Diagonal Room of Reactor Bldg Flooded W/Torus Water.Caused by Open Flow Path Through Disassembled RHR Pump Suction Valve.Water Removed & Rooms Decontaminated (← links)
- PNO-II-86-024, on 860326,reactor Scrammed Due to Turbine Trip.Caused by Spurious High Reactor Water Level Signal. Plant Brought to Cold Shutdown to Repair Degraded Reactor Recirculation Pump Seal.Outage Expected to Last 6 Days (← links)
- PNO-II-85-083, on 850818,util Notified by State of Wa That One Drum of Solidified Waste Oil Arrived at Us Ecology Burial Site W/Puncture Near Lower Ring.No Leakage Occurred. Util Burial Permit Suspended (← links)
- PNO-II-85-085, on 850824,leaking Oil from Reactor Coolant Pump Lower Motor Reservoir Contacted Pump Casing & Caught Fire.Caused by Failure of Lower Bearing & Oil Seal.Pump & Motor Vendors Contacted for Technical Assistance (← links)
- ML20134A975 (← links)
- PNO-II-85-076, on 850808,reactor Tripped from 99% Power. Caused by Two Blown Fuses.Unit Proceeding to Cold Shutdown & Will Be Out of Svc for 10 Days While Cause Investigated & Reactor Coolant Pumps Inspected (← links)
- PNO-II-85-059, on 850610,truck Carrying Empty UF6 Cylinders Involved in Accident Near Winfield,Wv.No Matl Released. Replacement Cab Will Be Hooked to Trailer & Will Continue to Destination in Piketon,Oh (← links)
- PNO-II-85-093, on 850926,Unit 2 Shut Down & on 850927,Unit 1 Shut Down Due to Hurricane Gloria w/35-40 Miles Per Hour Winds.Unit 1 Expected to Restart on 850927.Unit 2 Will Remain Shut Down for 2 Wks for Repair of LPSI Valves (← links)
- PNO-II-85-091, Region II Dispatched Emergency Response Specialist to Plant to Set Up High Frequency Radio Communications as Result of Hurricane Gloria.Unit 1 in Shutdown for Refueling (← links)
- PNO-II-80-051, on 800327,resident Inspector Was Contacted by Reporter Who Had Worked on Site as Laborer.Reporter Was Seeking Background Info,Not Making Allegations (← links)
- PNO-II-80-053, on 800404,Daniels Const Co Employee Working in Torus Fell Approx 10 Ft Sustaining Injuries to nonload- Bearing Bones of Back & Cut on Arm.Employee Taken to Hosp Via Ambulance.Expected Release to Be in 4 Days (← links)
- PNO-II-80-043, on 8000315,subcontractor Labor Force Started Picketing Site.On 800315 & 16 Majority of Const Forces Did Not Report to Work.On 800318,97 of 600 Individuals Failed to Report to Work.Estimated Outage May Be Extended Three Days (← links)
- PNO-II-80-028, on 800219,criticality Warning Sys Experienced False Alarm.Fuel Mfg Bldg Evacuated.No Abnormal Radiation Levels Existed (← links)
- PNO-II-80-023, on 800213,during Surveillance Test,Reactor Trip Occurred When Mechanic Accidentally Struck Instrument W/Wrench.Bldg Was Evacuated Due to Increased Radioactive Gas.Individual Has Small Contamination Level on Clothing (← links)
- PNO-II-80-022, on 800208,w/both Units Operating,Both Seismic Recorders Activated.Checks Made W/Other Agencies Revealed No Seismic Activity.Licensee Implemented Emergency Procedure.Evidently Caused by Welding Activities (← links)
- PNO-II-98-040, on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury (← links)
- ML20151X925 (← links)
- ML20151X634 (← links)
- ML20151U917 (← links)
- ML20151U677 (← links)
- ML20151U665 (← links)
- ML20151U484 (← links)
- ML20151U452 (← links)
- PNO-II-88-042, on 880713,NRC Notified of Util Intent to Initiate Shutdown of Unit to Repair F006 Injection Valve on HPCI Sys.Shutdown Prompted by Evaluation Indicating That Inadequate Torque May Be Available Under Reduced Voltage (← links)
- PNO-II-88-021, on 880404,licensee Commenced Controlled Shutdown.Caused by Unidentified Reactor Coolant Leakage Approaching Tech Spec Limit of 5 Gallons/Minute Over 24 H. Licensee Plans 7-day Outage to Correct Situation (← links)
- PNO-II-88-014, on 880219,util Discovered Random Failures of 5/16 Inch Silicon/Bronze Carriage Bolts Which Are Used to Tie Electrical Busses Together within Panels.Bolts Replaced. NRC Pursuing Generic Implications W/Ge (← links)
- PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley (← links)
- PNO-II-98-050, on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary (← links)
- PNO-II-99-025, on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly (← links)
- PNO-II-99-023, on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems (← links)
- PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities (← links)
- PNO-II-97-060, on 971120,plant Operators Manually Scrammed Reactor from 70% Power Due to Damage to Condensate Sys. Flexible Bellows on 2A Condensate Booster Pump Was Overpressurized.Licensee Initiate Controlled Shutdown (← links)
- PNO-II-83-073, on 830912,CP&L Declared Alert in Accordance W/Plant Emergency plan,15 Minutes After All Annunciators Alarmed But Could Not Be Reset.Licensee Continued Plant Operation & Assigned Addl People to Increase Surveillance (← links)
- PNO-II-83-058, on 830809,St Lucie Unit 2 Completed 100-hour Test Run at Full Power.Test Was Culmination of Power Ascension Testing Which Began After Full Power License Was Issued on 830610.Placed Into Commercial Operation on 830808 (← links)
- PNO-II-83-054, on 830714,licensee Began Gradual Shutdown After Main Condenser Low Vacuum Condition Developed Re Operational Problems W/Air Ejectors for Unit.State of Ga Informed (← links)
- PNO-II-85-105, on 851106,while Removing Core Internals Upper Guide Structure,One Lifting Rig Attachment Failed.Refueling Operations Halted W/Structure in Apparently Stable Position. NSSS Vendor Being Contacted (← links)
- PNO-II-87-019, Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding Areas (← links)
- PNO-II-82-030, on 820319,telcon Bomb Threat Received.Initial Search Yielded Negative Results.Addl Search Being Performed. Authorities Not Notified (← links)
- ML20204F109 (← links)
- PNO-II-80-031, on 800219,18 Gallons of Extraneous Liquid & Resin Found in Radwaste Shipment.Source of Liquid & Resin at Bottom of Shipping Cask Not Confirmed.Shipment Loaded in Rain & Overfilled (← links)
- PNO-II-93-001, on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified (← links)
- PNO-II-92-007, on 920202,plant Experienced Reactor Scram from 79% Power During Main Turbine Cv Testing.Licensee Actions Towards Determining/Correcting Root Cause of Scram Have Been Focused on EHC Sys (← links)
- ML20203C594 (← links)
- PNO-II-91-044, on 910709,licensee Inadvertently Transferred Approx 400 Gallons of Liquid Containing Small Amounts of U from Favorable Geometry Tank (T-417) to Unfavorable Tank (V-103).State of Nc Notified (← links)
- PNO-II-91-043, on 910707,NRC Authorized GE Co to Resume Normal Operation of Fluoride & Nitrate Waste Sys,Which Had Been Shut Down Subsequent to 910528 Event at Site (← links)
- ML20207G431 (← links)