PNO-77-180:three Cracks Were Identified,During Inservice Ultrasonic Testing of Core Spray Piping on Loop A,In Heat Affected Zone of Weld in 90 Degree Elbow.Licensee Evaluation Still in Progress.State of Nc Has Been Informed
ML20151X925
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/11/1977
From: Klingler G, Nolan F, Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-77-180, NUDOCS 9809180009
Download: ML20151X925 (1)


Text

-. .-- . - - . - - - . - _ . -. -. . . - - . -

l

/ D$ 04ti+ W O.f lU 8 0WW t +

es44

~

PRELIMINARY NOTIFICATION

l. October 11, 1977 l

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-77-180

_This areliminary notification constitutes EARLY notice of an event of j POSSI 3LE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.

FACILITY: Carolina Power and Light Company Brunswick, Unit No. 2 Docket No. 50-324 Southport, North Carolina

SUBJECT:

CRACKS IN CORE SPRAY PIPING During loop A, inservice a crack inultrasonic the heat affected testing ofzone the core sprayinpiping of a weld on a 90 elbow was identified. The exterior length of the crack is 1/8". Following identification of this crack, two others were found visually by water

, weepage. The three cracks are in three separate 90 degree elbows in the heat-affected zone of the weld on the primary side of the first isolation valve.

( The licensee evaluation is still in progress.

repair will extend ~the 54-day refueling outage which began 9/10/77.

RegiorLII hplieves the ' ' ~

,ji Q t

. Media interest is not expected. The State of North Carolina has been

/

/

, infonned. A news release is not planned by the licensee or NRC. An IE inspector will be at the site on October 12.

Region II (Atlanta) received' notification of this occurrence by telephone 0

,e s

from the plant manager at 4:30 p.m. on October 10. This information is current as of 2:00 p.m. on October 11. O

_ .,- ) -

LContact:. GKlingler, 'IE x28019 FNolan, IE x28019 JSniezek, IE x28019 '

Distribution: TransmittedHStM*'$  ;

Chairman Hendrie Consnissioner Bradford Commissioner Kennedy S. J. Chilk,'SECY C. C. Kammerer, CA Commissioner Gilinsky (ForDistribution) l- Transmitted: MNBBfW."//V P Bldg d I I E. Volg . IE L L. V. Gossick, E00 E. G. Case, NRR Region M.' )3 -

t S. H. Hanauer. ED0 , s ,/

l J. J. Fouchard, PA SS Bldg r,'fY a

(MAIL)

'W.. G. Mcdonald, MIPC C. V. Smith, NMSS' R. J. McTiernan, OIA i ,

.R. G. Ryan, OSP R. Minogue, SD i H. K. Shapar, ELD

    • ""7 PRELIMINARY NOTIFICATION PDR 18 E PNO-77-180 PDR _