Pages that link to "05000254/LER-1998-001, Informs of Change of Committed Due Date Re Rev to Logic Test Procedures as Stated in LER 98-001,dtd 980202.Due Date Is Now 980626 to Allow Station Necessary Time to Perform Appropriate Addl Reviews of Revised Procedures"
Jump to navigation
Jump to search
The following pages link to 05000254/LER-1998-001, Informs of Change of Committed Due Date Re Rev to Logic Test Procedures as Stated in LER 98-001,dtd 980202.Due Date Is Now 980626 to Allow Station Necessary Time to Perform Appropriate Addl Reviews of Revised Procedures:
Displayed 28 items.
- 05000254/LER-1998-019, Forwards LER 98-019-00,IAW 10CFR50.73(a)(2)(v)(B).Any Other Actions Described in Submittal Represent Intended or Planned Actions by Util.No Commitments Made (← links)
- 05000265/LER-1998-006, Forwards LER 98-006-00,IAW 10CFR50.73(a)(2)(v)(B). Commitments Made by Util Are Listed (← links)
- 05000254/LER-1998-021, Forwards LER 98-021-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made by Util Are Listed (← links)
- 05000254/LER-1998-020, Forwards LER 98-020-00,IAW 10CFR50.73(a)(2)(v)(B). Commitments Made by Util Listed (← links)
- 05000254/LER-1998-024, Forwards LER 98-024-00 Per 10CFR50.73(a)(2)(i)(B).List of Commitments Made by Util,Provided (← links)
- 05000254/LER-1998-023, Forwards LER 98-023-00 Per 10CFR50.73(a)(2)(v)(D).List of Licensee Commitments,Provided (← links)
- 05000254/LER-1998-022, Forwards LER 98-022-00 for Quad Cities Nuclear Power Station,Unit 1,per 10CFR50.73(a)(2)(iv).Commitments Made by Util,Listed (← links)
- 05000254/LER-1998-001 (redirect page) (← links)
- 05000254/LER-2012-003 (← links)
- 05000254/LER-2014-001 (← links)
- 05000254/LER-2014-003 (← links)
- 05000254/LER-2014-004 (← links)
- 05000254/LER-2015-001 (← links)
- 05000254/LER-2015-003 (← links)
- 05000254/LER-2015-006 (← links)
- 05000254/LER-2015-008 (← links)
- 05000254/LER-2013-001 (← links)
- 05000254/LER-2013-002 (← links)
- 05000254/LER-2016-002 (← links)
- 05000254/LER-2016-001 (← links)
- 05000254/LER-2015-010 (← links)
- 05000254/LER-2017-004 (← links)
- 05000254/LER-2017-003 (← links)
- 05000254/LER-2017-002 (← links)
- 05000254/LER-2017-001 (← links)
- 05000254/LER-1993-013 (← links)
- 05000254/LER-1993-012 (← links)
- 05000254/LER-1993-010 (← links)
- 05000254/LER-1993-011 (← links)
- 05000254/LER-1993-008 (← links)
- 05000254/LER-1993-009 (← links)
- 05000254/LER-1990-013 (← links)
- 05000254/LER-1982-017, Forwards LER 82-017/03L-0 (← links)
- 05000254/LER-1982-016, Forwards LER 82-016/03L-0 (← links)
- 05000254/LER-1982-010, Forwards LER 82-010/03L-0 (← links)
- 05000254/LER-1982-009, Forwards LER 82-009/03L-0 (← links)
- 05000254/LER-1994-005, Forwards LER 94-005-00.Suppl Rept Will Be Issued,Documenting Valves & Penetrations That Had Excessive Leakage,What Caused Leakage & Corrective Actions (← links)
- 05000254/LER-1982-028, Forwards LER 82-028/03L-0 (← links)
- 05000254/LER-1982-024, Forwards LER 82-024/03L-0 (← links)
- 05000254/LER-1982-023, Forwards LER 82-023/03L-0 (← links)
- 05000254/LER-1983-001, Forwards LER 83-001/03L-0 (← links)
- 05000254/LER-1994-003, Forwards LER 94-003,Rev 0 Re Not Establishing Continuous Firewatch Following Impairment of Safe Shutdown Path. Commitments Listed (← links)
- 05000254/LER-1982-025, Forwards LER 82-025/03L-0 (← links)
- 05000254/LER-1982-032, Forwards LER 82-032/03L-0 (← links)
- 05000254/LER-1982-027, Forwards LER 82-027/03L-0 (← links)
- 05000254/LER-1982-029, Forwards LER 82-029/01T-0 (← links)
- 05000254/LER-1982-031, Forwards LER 82-031/03L-0 (← links)
- 05000254/LER-1982-030, Forwards LER 82-030/03L-0 (← links)
- 05000254/LER-1982-021, Forwards LER 82-021/03L-0 (← links)
- 05000254/LER-1982-012, Forwards LER 82-012/01T-0 (← links)
- 05000254/LER-1982-018, Forwards LER 82-018/03L-0 (← links)
- 05000254/LER-1982-019, Forwards LER 82-019/03L-0 (← links)
- 05000254/LER-1982-013, Forwards LER 82-013/03L-0 (← links)
- 05000254/LER-1982-014, Forwards LER 82-014/03L-0 (← links)
- 05000254/LER-1982-015, Forwards LER 82-015/03L-0 (← links)
- 05000254/LER-1978-027, Forwards LER 78-027/03L-0 (← links)
- 05000254/LER-1983-006, Forwards LER 83-006/03L-0 (← links)
- 05000254/LER-1983-002, Forwards LER 83-002/03L-0 (← links)
- 05000254/LER-1983-005, Forwards LER 83-005/03L-0 (← links)
- 05000254/LER-1983-003, Forwards LER 83-003/03L-0 (← links)
- 05000254/LER-1983-004, Forwards LER 83-004/03L-0 (← links)
- 05000254/LER-1983-015, Forwards LER 83-015/03L-0 (← links)
- 05000254/LER-1983-014, Forwards LER 83-014/03L-0 (← links)
- 05000254/LER-1983-013, Forwards LER 83-013/03L-0 (← links)
- 05000254/LER-1982-022, Supplemental LER 82-022/03L-1:on 820816,maint Outage for 1/2B Diesel Fire Pump Exceeded 7-day Limit.Cause Not Stated. Diesel Pump Wear Rings Replaced (← links)
- 05000254/LER-1982-020, Forwards LER 82-020/03L-0 (← links)
- 05000254/LER-1983-011, Forwards LER 83-011/03L-0 (← links)
- 05000254/LER-1983-007, Forwards LER 83-007/03L-0 (← links)
- 05000254/LER-1982-035, Forwards LER 82-035/03L-0 (← links)
- 05000254/LER-1982-034, Forwards LER 82-034/03L-0 (← links)
- 05000254/LER-1976-002, Updated LER 76-002/03L Re Excessive Leakage from Double Gasketed Seal X-4.Initially Reported on 760202.Caused by Equipment Failure & Insufficient Compression.Hatch Bolts Tightened (← links)
- 05000254/LER-1982-039, Forwards LER 82-039/03L-0 (← links)
- 05000254/LER-1995-004, Forwards LER 95-004.Listed Commitments Made,Including Updating Vendor Technical Manual CO099, GE Protective Relays & Accessories (← links)
- 05000254/LER-1994-016, Forwards LER 94-016,Rev 0 for Plant.Licensee Commitments Listed (← links)
- 05000254/LER-1994-015, Forwards LER 94-015-00:on 941002,single Loop Operation in Unanalyzed Condition Occurred (← links)
- 05000254/LER-1983-019, Forwards LER 83-019/03L-0 (← links)
- 05000254/LER-1996-003, Forwards LER 96-003-00 Re Unit 1 Start of Egd Due to Inadequate Procedure (← links)
- 05000254/LER-1994-004, Submits Reproduction of Original Text of LER 94-004 & Suppl Info (← links)
- 05000254/LER-1995-001, Informs of Two Addl Commitments to Be Made Re LER 95-001,rev 0 (← links)
- 05000254/LER-1984-018, :on 840922 & 24,reactor Bldg Fuel Pool Channel B Area Radiation Monitor 1705-16B Spiked High, Tripping Ventilation.Cause Unknown.Corrective Actions for Both Events Will Be Documented in Suppl to LER 84-018 (← links)
- 05000254/LER-1996-013, Forwards LER 96-013,Rev 0 IAW Requirements of 10CFR50.73(a)(2)(i)(B).Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1996-012, Forwards LER 96-012-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items within Component Classification Program & Ensure Resolution of Items.Plan Will Be Completed by 970301 (← links)
- 05000254/LER-1996-011, Forwards LER 96-011-00.Circuit Mods & Procedure Changes Will Be Implemented Prior to Startup & Review of Sample of Assumptions from Safe Shutdown Repts & Calculations Investigated (← links)
- 05000254/LER-1996-015, Forwards LER 96-015-00.Commits to Completion Review of All Pipe Whip & Vibration Restraint Configuations by 961231 (← links)
- 05000254/LER-1996-008, Forwards LER 96-008,Rev 00 & Makes Following Commitment: Procedure Qcts 0600-34 Will Be Revised to Ensure Appropriate Vent Path Exists When Leak Rate Testing 2251(2)-81A/B Panels (← links)
- 05000254/LER-1991-003, Forwards LER 91-003-02.Containment Atmosphere Monitoring Piping & Mark I Support Installation Work Will Be Completed Prior to Startup from Current Forced Outage Q2F41 (← links)
- 05000254/LER-1983-012, Forwards LER 83-012/01T-0 (← links)
- 05000254/LER-1983-010, Forwards LER 83-010/03L-0 (← links)
- 05000254/LER-1982-026, Forwards Revised LER 82-026/03L-2 (← links)
- 05000254/LER-1983-008, Forwards LER 83-008/03L-0 (← links)
- 05000254/LER-1996-022, Submits Corrective Action Plan for LER 96-022-00 Re Inoperable Control Room Emergency Ventilation Sys (← links)
- 05000254/LER-1997-009, Forwards LER 97-009-00 Per 10CFR50.73(a)(2)(v)(D).Commitment Included in Ltr (← links)
- 05000254/LER-1997-014, Forwards LER 97-014-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitment Made by Ltr (← links)
- 05000254/LER-1997-020, Forwards LER 97-020-00,reporting Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures.No Commitments Being Made by Ltr (← links)
- 05000254/LER-1997-013, Forwards LER 97-013-00 Re Any Single Cause of Inoperable Independent Train or Channel in Single Sys Designed to Remove Residual Heat.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1997-011, Forwards LER 97-011-00 Re an Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures or Sys That Are Needed to Remove Residual Heat. Commitments Made by Ltr,Submitted (← links)
- 05000254/LER-1997-010, Forwards LER 97-010-00 Which Repts Event That Occurred at Quad Cities Nuclear Station,Per 10CFR50.73(a)(2)(v)(D). Commitment Made by Ltr,Submitted (← links)
- 05000254/LER-1997-005, Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments (← links)
- 05000254/LER-1997-003, Forwards LER 97-003-00 IAW 10CFR50.73(a)(2)(v)(B)(D). Procedure Qcap 0307-02, ASME Section XI Repair & Replacement Program Preparation, Attachment a, Section XI Repair/Replacement Program Will Be Revised Re VT-2 (← links)
- 05000254/LER-1997-002, Forwards LER 97-002-00 Documenting Condition That Was Discovered at Quad Cities Nuclear Power Station.Util Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1997-008, Forwards LER 97-008,Rev 00 & Submits Commitments.Revised Qcop 2300-13 Is to Include Steps to Fully Disengage Turning Gear If Necessary for Testing Purposes (← links)
- 05000254/LER-1997-006, Forwards LER 97-006,Rev 00 & Submits Commitments Related to LER (← links)
- 05000254/LER-1996-021, Forwards LER 96-021-00,for Quad Cities Nuclear Power Station.No Commitments Being Made (← links)
- 05000254/LER-1996-025, Forwards LER 96-025-00 Re Operability Calculations Performed on ECCS Suction Strainers W/Incorrect Head Loss Values (← links)
- 05000254/LER-1996-023, Provides Commitments Re LER 96-023.Predefined Model Work Request Which Initiates Perodic Maint Procedure Initiated (← links)
- 05000254/LER-1996-014, Forwards LER 96-014-00.All Personnel Will Be Briefed in Event by 961215,reinforcing Expectations to Initiate Procedure Changes When Needed (← links)
- 05000254/LER-1996-017, Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items (← links)
- 05000254/LER-1996-019, Forwards LER 96-019 IAW Requirements of 10CFR50.73(a)(2)(ii)(B) & Discusses Listed Commitments (← links)
- 05000254/LER-1996-018, Forwards Supplemental Info Re LER 96-018-00,correcting Editorial Error (← links)
- 05000254/LER-1996-020, Forwards LER 96-020-00.Commitments Included in LER & Submitted (← links)
- 05000254/LER-1998-019, Forwards LER 98-019-00,IAW 10CFR50.73(a)(2)(v)(B).Any Other Actions Described in Submittal Represent Intended or Planned Actions by Util.No Commitments Made (← links)
- 05000254/LER-1998-021, Forwards LER 98-021-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made by Util Are Listed (← links)
- 05000254/LER-1998-020, Forwards LER 98-020-00,IAW 10CFR50.73(a)(2)(v)(B). Commitments Made by Util Listed (← links)
- 05000254/LER-1988-001, Sanitized Version of LER 88-001-00:on 880114,records Review Found Two Apparent Overexposures of Contractor Personnel During Fourth Quarter 1980.Caused by Inaccurate Secondary &/ or Primary Dosimetry.Dosimetry Sys Upgraded (← links)
- 05000254/LER-1998-024, Forwards LER 98-024-00 Per 10CFR50.73(a)(2)(i)(B).List of Commitments Made by Util,Provided (← links)
- 05000254/LER-1998-023, Forwards LER 98-023-00 Per 10CFR50.73(a)(2)(v)(D).List of Licensee Commitments,Provided (← links)
- 05000254/LER-1998-022, Forwards LER 98-022-00 for Quad Cities Nuclear Power Station,Unit 1,per 10CFR50.73(a)(2)(iv).Commitments Made by Util,Listed (← links)
- ML20155D859 (redirect page) (← links)
- 05000254/LER-1998-001, Forwards LER 98-001-01,re EDG Failure to Start When EDG Received Inadvertent Start Signal.All Corrective Actions to Be Completed in Section D of Rev 0 Have Been Closed (redirect page) (← links)
- 05000254/LER-1998-003, Forwards LER 98-003-00,which Describes Condition Prohibited by Plant Ts.Commitments Made by Ltr,Listed (← links)
- ML20202C646 (redirect page) (← links)
- 05000254/LER-1998-001, Forwards LER 98-001-00,re Event That Occurred at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr,Listed (redirect page) (← links)
- 05000254/LER-1997-026, Forwards LER 97-026-01,re Event That Took Place at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr, Listed (← links)
- 05000254/LER-1998-002, Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B),stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Ts.Commitment Made by Ltr Provided (← links)
- 05000254/LER-1997-022, Forwards LER 97-022-00,per 10CFR50.73(a)(2)(v)(D).Commitment Stating That Qcos 5750-04 Will Be Enhanced by Adding Precautions for Opening of Bypass Valve & Verification That Relief Valve Has Not Lifted & Failed to Reseat,Listed (← links)
- 05000254/LER-1994-002, Forwards LER 94-002-01 Re B CR HVAC Inoperable,Due to Failure of Compressor Motor Contactor.Listed Commitments Made by Ltr (← links)
- 05000254/LER-1997-027, Forwards LER 97-027-00,per 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed (← links)
- 05000254/LER-1997-029, Forwards LER 97-029-00 Per 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr Listed (← links)
- 05000254/LER-1997-012, Forwards LER 97-012-01,re Issue That It Is Physically Possible for Units 1 & 2 Refuel Bridge Monorail Auxiliary Hoists to Perform Core Alterations.Commitments Made in Rept, Listed (← links)
- 05000254/LER-1997-024, Forwards LER 97-024-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Submitted (← links)
- 05000254/LER-1997-025, Forwards LER 97-025-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed (← links)
- 05000254/LER-1998-007, Forwards LER 98-007-00,re Condition That Was Outside Design Basis of Plant,Per 10CFR50.73(a)(2)(ii)(B).Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1998-004, Forwards LER 98-004-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1997-023, Forwards LER 97-023-00,which Documents Event That Occurred at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1998-025, Forwards LER 98-025-00,IAW 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed (← links)
- 05000254/LER-1999-001, Forwards LER 99-001-00 for Quad Cities Nuclear Power Station.Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tech Specs.Util Committing to Listed Actions (← links)
- 05000254/LER-1998-011, Forwards LER 98-011-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1998-006, Forwards LER 98-006-01,re RB Post LOCA Temps.Actions Listed Are Required for Closure of Issue But Are Not Required Prior to Startup (← links)
- 05000254/LER-1998-012, Forwards LER 98-012-01,which Describes Unit 1 Reactor Bottom Head Drain Line Developed Leak.No New Commitments Made within Submittal (← links)
- 05000254/LER-1987-025, Forwards Addl Info Re Control Room Habitability to Support Narrative Contained in LER 87-025 (Rev 1),including Control Room Habitability Study,Updated FSAR (Rev 88),inplace Charcoal Absorber Leak Rate Testing & Calculations (← links)
- 05000254/LER-1997-015, Informs NRC of Change of Committed Due Date Contained in LER 97-015,dtd 970812.Station Changing Due Date of Commitment to 990528 (← links)
- 05000254/LER-1998-015, Forwards LER 98-015-00 Re CREVS Declared Inoperable.Listed Commitments Being Made by Ltr (← links)
- 05000254/LER-1989-009, Effluent & Waste Disposal Semiannual Rept,Jan-June 1989.Unit 1 Svc Water Gross Activity Monitor Out of Svc for Total of 77 Days During Reporting Period.One Unplanned Liquid Release Documented in LER 89-009 (← links)
- 05000254/LER-1998-018, Forwards LER 98-018-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1998-017, Forwards LER 98-017-00 for Quad Cities Nuclear Power Station.Rept Submitted IAW Requirements of Code of Federal Regulations,Title 10CFR50.73(a)(2)(v)(D).QCOS 5750-02 Will Be Revised to Clarify Sequence & Preference by 980825 (← links)
- 05000254/LER-1997-030, Forwards LER 97-030-01 Re Instrument Line Excess Flow Valves Testing Performed at Less than Nominal Reactor Pressure Due to Inadequate Procedures.Ler Provides Addl Info Re Root Cause Analysis.Commitments Made by Util,Listed (← links)
- 05000254/LER-1998-001, Informs of Change of Committed Due Date Re Rev to Logic Test Procedures as Stated in LER 98-001,dtd 980202.Due Date Is Now 980626 to Allow Station Necessary Time to Perform Appropriate Addl Reviews of Revised Procedures (← links)
- 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action (← links)
- 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee (← links)
- 05000254/LER-1998-010, Forwards LER 98-010-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr (← links)
- 05000254/LER-1998-008, Forwards LER 98-008-00,re Event Which Took Place at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed (← links)
- 05000254/LER-1998-014, Forwards LER 98-014-00,stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tss.No Commitments Being Made by Ltr (← links)
- 05000254/LER-1997-019, Forwards LER 97-019-00 Re Event That Occurred at Plant,Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Ltr,Listed (← links)
- 05000254/LER-1997-016, Forwards LER 97-016-00 Re DG Cw IST Requirements Not Being Completed When Inaccurate Predefined Work Request Was Implemented (← links)
- 05000254/LER-1998-005, Forwards LER 98-005-00 Re Event Which Occurred at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed (← links)
- 05000254/LER-1986-007, Responds to NRC Re Violations Noted in Insp Repts 50-254/87-09 & 50-265/87-09 on 870407-09.Corrective Actions: LER 86-007-00 for Unit 2 Will Be Supplemented to Describe More Fully Root Cause,Investigation & Corrective Actions (← links)
- 05000254/LER-1997-021, Forwards LER 97-021-00 IAW 10CFR50.73(a)(2)(v)(A). Commitments Made by Util,Listed (← links)
- 05000254/LER-1997-017, Forwards LER 97-017-00.Commitment Made by Ltr,Listed (← links)
- 05000254/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed (← links)
- 05000254/LER-1986-001, Responds to NRC Re Violations Noted in Insp Repts 50-254/86-06 & 50-265/86-06.Corrective Actions:Response to Repetitive Local Leak Rate Failures Provided in Encl Rev 1 to LER 86-001 (← links)
- 05000254/LER-1998-003, Forwards LER 98-003-00,which Describes Condition Prohibited by Plant Ts.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1998-002, Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B),stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Ts.Commitment Made by Ltr Provided (← links)
- 05000254/LER-1998-007, Forwards LER 98-007-00,re Condition That Was Outside Design Basis of Plant,Per 10CFR50.73(a)(2)(ii)(B).Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1998-004, Forwards LER 98-004-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1998-025, Forwards LER 98-025-00,IAW 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed (← links)
- 05000265/LER-1998-005, Forwards LER 98-005-00,per 10CFR50.73(a)(2)(vii)B. Commitments Made by Util,Listed (← links)
- 05000254/LER-1998-011, Forwards LER 98-011-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1998-006, Forwards LER 98-006-01,re RB Post LOCA Temps.Actions Listed Are Required for Closure of Issue But Are Not Required Prior to Startup (← links)
- 05000254/LER-1998-012, Forwards LER 98-012-01,which Describes Unit 1 Reactor Bottom Head Drain Line Developed Leak.No New Commitments Made within Submittal (← links)
- 05000254/LER-1998-015, Forwards LER 98-015-00 Re CREVS Declared Inoperable.Listed Commitments Being Made by Ltr (← links)
- 05000265/LER-1998-003, Forwards LER 98-003-00,submitted IAW 10CFR50.73(a)(2)(iv). Commitments Made within Ltr Listed (← links)
- 05000254/LER-1998-018, Forwards LER 98-018-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1998-017, Forwards LER 98-017-00 for Quad Cities Nuclear Power Station.Rept Submitted IAW Requirements of Code of Federal Regulations,Title 10CFR50.73(a)(2)(v)(D).QCOS 5750-02 Will Be Revised to Clarify Sequence & Preference by 980825 (← links)
- 05000265/LER-1998-002, Forwards LER 98-002-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Listed (← links)
- ML20217E824 (redirect page) (← links)
- 05000265/LER-1998-001, Forwards LER 98-001-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr (← links)
- 05000254/LER-1998-010, Forwards LER 98-010-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr (← links)
- 05000254/LER-1998-008, Forwards LER 98-008-00,re Event Which Took Place at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed (← links)
- 05000254/LER-1998-014, Forwards LER 98-014-00,stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tss.No Commitments Being Made by Ltr (← links)
- 05000254/LER-1998-005, Forwards LER 98-005-00 Re Event Which Occurred at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed (← links)