ML20207R393

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-262/87-01 on 870202-03 & Notice of Violation
ML20207R393
Person / Time
Site: 05000262
Issue date: 03/12/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Tullis F
Brigham Young University, PROVO, UT
Shared Package
ML20207R394 List:
References
NUDOCS 8703170186
Download: ML20207R393 (2)


See also: IR 05000262/1987001

Text

m

,

> .i

NAR I 21987

In Reply Refer To:

Docket: 50-262/87-01

Brigham Young University

ATTN: Dr. F. LaMond Tullis

Associate Academic Vice President

Provo, Utah 84602

Gentlemen:

This refers to the inspection conducted by Mr. H. D. Chaney of this office

during the period February 2-3, 1987, of the activities authorized by NRC

Operating License R-109 for Brigham Young University reactor facility, and to

the discussion of our findings with Dr. G. W. Mason and other members of your

staff at the conclusion of the inspection.

_

Areas examined during the inspection included reactor operations, radiation

- . protection, eraergency preparedness, nuclear materials safeguards, and physical

security programs. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with personnel,

and observations by the NRC inspector. The inspection findings are documented

in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

ORIGINAL CIGNED BY:

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures: ee next age) ./

,

RIV:FRPS C:FRPSk C:R&SPb C: RPB

l HDChaney/tw BMurray WLFisher JEGagl rdo

/Q87 / /87 5 /~) /87 ) /p ,

p\

8703170186 870312

PDR ADOCK 05000262 j'/\

G PDR

-

m. ...

Brigham Young University -2-

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-262/87-01

cc w/ enclosures:

Dr. J. B. Stohlten

Executive Vice President's Office

Brigham Young University

Provo, Utah 84602

Dr. G. Mason

College of Physical & Mathematical Sciences

Brigham Young University

Provo, Utah 84602

W. R. Hansen

Campus Safety Office

Brigham Young University

Provo, Utah 84602

F. W. Nelson

Campus Safety Office - Radiation Safety

Brigham Young University

Provo, Utah 84602

Bureau of Radiation Control

Department of Health

P.-0. Box.16700

Salt Lake City, Utah 84116-070

bec: DMB(IE01)

bec dist, by RIV

  • RPB R. D. Martin

R&SPB- DRSP

  • MIS System *RIV File
  • R. Hall RSB
  • H. D. Chaney *RSTS Operator
  • W. L. Fisher *B. Murray

PBSS/NRR R. L. Bangart

J. J. Dosa, Project Director

  • w/766