Category:INSPECTION REPORT
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970161997-08-13013 August 1997 Insp Repts 50-445/97-16 & 50-446/97-16 on 970722-25.No Violations Noted.Major Areas Inspected:Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures ML20151L9231997-08-0505 August 1997 Insp Repts 50-445/97-15 & 50-446/97-15 on 970608-0719. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20149L3361997-07-25025 July 1997 Corected Pages 13,17,19,22,28 & Page 2 of Supplemental Info for Insp Repts 50-445/97-12 & 50-446/97-12 Issued on 970611 IR 05000445/19970141997-06-30030 June 1997 Insp Repts 50-445/97-14 & 50-446/97-14 on 970427-0607. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20148K2851997-06-11011 June 1997 Insp Repts 50-445/97-12 & 50-446/97-12 on 970421-0502. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970061997-06-0606 June 1997 Insp Repts 50-445/97-06 & 50-446/97-06 on 970428-0502. Violations Noted.Major Areas Inspected:Operations & Plant Support & Assessment of Licensed Operator Requalification Program ML20148F8791997-06-0303 June 1997 Insp Repts 50-445/97-09 & 50-446/97-09 on 970317-21. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000445/19970131997-05-21021 May 1997 Insp Repts 50-445/97-13 & 50-446/97-13 on 970428-0502.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19970081997-05-21021 May 1997 Insp Repts 50-445/97-08 & 50-446/97-08 on 970316-0426.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19970011997-05-21021 May 1997 Insp Repts 50-445/97-01 & 50-446/97-01 on 970127-31,0428 & 0502.No Violations Noted.Major Areas Inspected:Licensee self-assessment Effort IR 05000445/19970101997-05-20020 May 1997 Insp Repts 50-445/97-10 & 50-446/97-10 on 970421-25.No Violations Noted.Major Areas Inspected:Plant Support ML20148B5891997-05-0808 May 1997 Insp Repts 50-445/97-11 & 50-446/97-11 on 970407-10.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19970071997-04-16016 April 1997 Insp Repts 50-445/97-07 & 50-446/97-07 on 970324-27.No Violations Noted.Major Areas Inspected:Plant Support 1999-09-14
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970161997-08-13013 August 1997 Insp Repts 50-445/97-16 & 50-446/97-16 on 970722-25.No Violations Noted.Major Areas Inspected:Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures ML20151L9231997-08-0505 August 1997 Insp Repts 50-445/97-15 & 50-446/97-15 on 970608-0719. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20149L3361997-07-25025 July 1997 Corected Pages 13,17,19,22,28 & Page 2 of Supplemental Info for Insp Repts 50-445/97-12 & 50-446/97-12 Issued on 970611 IR 05000445/19970141997-06-30030 June 1997 Insp Repts 50-445/97-14 & 50-446/97-14 on 970427-0607. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20148K2851997-06-11011 June 1997 Insp Repts 50-445/97-12 & 50-446/97-12 on 970421-0502. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970061997-06-0606 June 1997 Insp Repts 50-445/97-06 & 50-446/97-06 on 970428-0502. Violations Noted.Major Areas Inspected:Operations & Plant Support & Assessment of Licensed Operator Requalification Program ML20148F8791997-06-0303 June 1997 Insp Repts 50-445/97-09 & 50-446/97-09 on 970317-21. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000445/19970131997-05-21021 May 1997 Insp Repts 50-445/97-13 & 50-446/97-13 on 970428-0502.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19970081997-05-21021 May 1997 Insp Repts 50-445/97-08 & 50-446/97-08 on 970316-0426.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19970011997-05-21021 May 1997 Insp Repts 50-445/97-01 & 50-446/97-01 on 970127-31,0428 & 0502.No Violations Noted.Major Areas Inspected:Licensee self-assessment Effort IR 05000445/19970101997-05-20020 May 1997 Insp Repts 50-445/97-10 & 50-446/97-10 on 970421-25.No Violations Noted.Major Areas Inspected:Plant Support ML20148B5891997-05-0808 May 1997 Insp Repts 50-445/97-11 & 50-446/97-11 on 970407-10.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19970071997-04-16016 April 1997 Insp Repts 50-445/97-07 & 50-446/97-07 on 970324-27.No Violations Noted.Major Areas Inspected:Plant Support 1999-09-14
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970161997-08-13013 August 1997 Insp Repts 50-445/97-16 & 50-446/97-16 on 970722-25.No Violations Noted.Major Areas Inspected:Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures ML20151L9231997-08-0505 August 1997 Insp Repts 50-445/97-15 & 50-446/97-15 on 970608-0719. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20149L3361997-07-25025 July 1997 Corected Pages 13,17,19,22,28 & Page 2 of Supplemental Info for Insp Repts 50-445/97-12 & 50-446/97-12 Issued on 970611 IR 05000445/19970141997-06-30030 June 1997 Insp Repts 50-445/97-14 & 50-446/97-14 on 970427-0607. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20148K2851997-06-11011 June 1997 Insp Repts 50-445/97-12 & 50-446/97-12 on 970421-0502. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970061997-06-0606 June 1997 Insp Repts 50-445/97-06 & 50-446/97-06 on 970428-0502. Violations Noted.Major Areas Inspected:Operations & Plant Support & Assessment of Licensed Operator Requalification Program ML20148F8791997-06-0303 June 1997 Insp Repts 50-445/97-09 & 50-446/97-09 on 970317-21. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000445/19970131997-05-21021 May 1997 Insp Repts 50-445/97-13 & 50-446/97-13 on 970428-0502.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19970081997-05-21021 May 1997 Insp Repts 50-445/97-08 & 50-446/97-08 on 970316-0426.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19970011997-05-21021 May 1997 Insp Repts 50-445/97-01 & 50-446/97-01 on 970127-31,0428 & 0502.No Violations Noted.Major Areas Inspected:Licensee self-assessment Effort IR 05000445/19970101997-05-20020 May 1997 Insp Repts 50-445/97-10 & 50-446/97-10 on 970421-25.No Violations Noted.Major Areas Inspected:Plant Support ML20148B5891997-05-0808 May 1997 Insp Repts 50-445/97-11 & 50-446/97-11 on 970407-10.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19970071997-04-16016 April 1997 Insp Repts 50-445/97-07 & 50-446/97-07 on 970324-27.No Violations Noted.Major Areas Inspected:Plant Support 1999-09-14
[Table view] Category:UTILITY
MONTHYEARIR 05000445/19900401990-11-13013 November 1990 Safety Insp Repts 50-445/90-40 & 50-446/90-40.Violations Noted But Not Cited.Major Areas Inspected:Plant Status, Operational Safety Verification,Onsite Followup of Events, Followup on Fastener Testing for Bulletin 87-02 IR 05000445/19900311990-10-10010 October 1990 Insp Repts 50-445/90-31 & 50-446/90-31 on 900808-0918. Violation Noted IR 05000445/19900301990-09-11011 September 1990 Insp Repts 50-445/90-30 & 50-446/90-30 on 900723-0802.No Violations or Deviations Noted.Major Areas Inspected: Security Program Audits,Protected & Vital Area Physical Barriers,Detection & Assessment Aids & Access Control IR 05000445/19900291990-08-30030 August 1990 Insp Repts 50-445/90-29 & 50-446/90-29 on 900723-27.No Violations Noted.Major Areas Inspected:Licensee Water Chemistry & Radiochemistry Programs IR 05000445/19900281990-08-29029 August 1990 Insp Repts 50-445/90-28 & 50-446/90-28 on 900716-20.No Violations Noted.Major Areas Inspected:Licensee Radioactive Matl Transportation & Solid Radwaste Programs IR 05000445/19900341990-08-27027 August 1990 Insp Repts 50-445/90-34 & 50-446/90-34 on 900731-0807. Violation Noted.Major Areas inspected:900730 Main Steam Line Low Pressure Safety Injection Event,Including Actions Taken Prior To,During & Subsequent to Event IR 05000445/19900321990-08-0707 August 1990 Advises That NRC Insp 50-445/90-32 & 50-446/90-32 Canceled.No Insp Rept Will Be Issued for Rept Number ML20058M2501990-08-0303 August 1990 Insp Repts 50-445/90-22 & 50-446/90-22 on 900606-0703. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Startup Test Results Review, QA for Startup Test & Onsite Followup of Events IR 05000445/19900161990-08-0202 August 1990 Insp Repts 50-445/90-16 & 50-446/90-16 on 900423-27.No Violations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program Including Implementing Procedures,Changes to Emergency Facilities & Equipment IR 05000445/19900211990-07-25025 July 1990 Notifies That NRC Insps 50-445/90-21 & 50-446/90-21 Have Been Cancelled IR 05000445/19900251990-07-24024 July 1990 Cancels Insp Repts 50-445/90-25 & 50-446/90-25 IR 05000445/19900231990-07-13013 July 1990 Insp Repts 50-445/90-23 & 50-446/90-23 on 900618-22.No Violations or Deviations Noted.Major Areas Inspected: Radiological Environ Monitoring Program,Including Organization & Mgt Controls,Training & Qualifications IR 05000445/19900241990-07-11011 July 1990 Insp Repts 50-445/90-24 & 50-446/90-24 on 900618-22 & 25-28. No Violations or Deviations Noted.Major Areas Inspected:Self Assessment Capability IR 05000445/19890641989-09-26026 September 1989 Safety Insp Repts 50-445/89-64 & 50-446/89-64 on 890802- 0905.Violation & Deviation Noted.Major Areas Inspected: Actions on Previous Insp Findings,Followup on Violations/ Deviations & Action on 10CFR50.55(e) Deficiencies IR 05000445/19890661989-09-26026 September 1989 Safety Insp Repts 50-445/89-66 & 50-446/89-66 on 890802- 0905.Violations Noted.Major Areas Inspected:Followup on Violations/Deviations,Applicant Action on 10CFR50.55 (E) Const Deficiencies & General Plant Area Tours IR 05000445/19890631989-09-26026 September 1989 Insp Repts 50-445/89-63 & 50-446/89-63 on 890802-0905.No Violations or Deviations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Action on 10CFR50.55(e) Deficiencies & Assessement of Allegations IR 05000445/19890591989-09-25025 September 1989 Insp Repts 50-445/89-59 & 50-446/89-59 on 890814-25. Weaknesses,Strengths & Unresolved Item Noted.Major Areas Inspected:Emergency Response Guidelines (Erg),Including Review of ERG Training Program & Engineering Activities IR 05000445/19890651989-09-22022 September 1989 Safety Insp Repts 50-445/89-65 & 50-446/89-65 on 890802- 0905.Violation Noted.Major Areas Inspected:Applicant Actions on Previous Insp Findings,Followup on Violations/Deviations & Action on 10CFR50.55(e) Deficiencies IR 05000445/19890611989-09-14014 September 1989 Insp Repts 50-445/89-61 & 50-446/89-61 on 890724-0804.No Violations or Deviations Noted.Major Areas Inspected:Final Reconciliation Process to Assure That Pending Open Items Addressed within Corrective Action Repts IR 05000445/19890681989-09-13013 September 1989 Partially Withheld Insp Repts 50-445/89-68 & 50-446/89-68 on 890814-18 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Assessment Aids,Detection Aids,Physical Barriers & Personnel Training IR 05000445/19890571989-08-25025 August 1989 Insp Repts 50-445/89-57 & 50-446/89-57 on 890717-28. Violations Noted.Major Areas Inspected:Controls & Implementation of Operations & Maint Procedure for Unit 1 IR 05000445/19890581989-08-25025 August 1989 Insp Repts 50-445/89-58 & 50-446/89-58 on 890724-28.No Violations & Deviations Noted.Major Areas Inspected: Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000445/19890501989-08-25025 August 1989 Insp Repts 50-445/89-50 & 50-446/89-50 on 890717-21.No Violations Noted.Major Areas Inspected:Radiation Protection Program,Organization & Mgt Controls,External & Internal Exposure Controls & Training & Qualification Controls IR 05000445/19890541989-08-24024 August 1989 Resident Safety Insp Repts 50-445/89-54 & 50-446/89-54 on 890706-0801.No Violations,Deviations,Open Items,Unresolved Items,Strengths or Weaknesses Noted.Major Areas Inspected: Util Action on Previous Insp Findings & Plant Tours IR 05000445/19890621989-08-24024 August 1989 Partially Withheld Insp Repts 50-445/89-62 & 50-446/89-62 on 890731-0804 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program, Including Security Program Audits & Testing & Maint IR 05000445/19890381989-08-17017 August 1989 Insp Repts 50-445/89-38 & 50-446/89-38 on 890717-27. Violations Noted.Major Areas Inspected:Preservice Insp Activities,Licensee Disposition of Reported Deficiencies & Licensee Erosion/Corrosion Program IR 05000445/19890521989-08-17017 August 1989 Resident Safety Insp Repts 50-445/89-52 & 50-446/89-52 on 890706-0801.No Violations Noted.Major Areas Inspected:Util Action on Previous Insp Findings,Followup on Violations/ Deviations & safety-related Mechanical Components IR 05000445/19890551989-08-17017 August 1989 Resident Safety Insp Repts 50-445/89-55 & 50-446/89-55 on 890706-0801.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Retest Procedure Review, Preoperational Test Witnessing,Plant Tours & Plant Maint IR 05000445/19890561989-08-15015 August 1989 Partially Withheld Preoperational Insp Repts 50-445/89-56 & 50-446/89-26 on 890710-14 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Applicant Physical Security Program,Including Protected Area Physical Barriers IR 05000445/19890431989-08-15015 August 1989 Emergency Preparedness Program Appraisal Insp Repts 50-445/89-43 & 50-446/89-43. Outstanding Items Noted.Major Areas Appraised:Emergency Organization,Training & Equipment & Procedures Which Implement Emergency Plan IR 05000445/19890531989-08-14014 August 1989 Insp Repts 50-445/89-53 & 50-446/89-53 on 890706-0801.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous Insp Findings,Followup on Violations/Deviations & post-const Hardware Validation Program IR 05000445/19890511989-08-0404 August 1989 Insp Repts 50-445/89-51 & 50-446/89-51 on 890706-0801.No Violations or Deviations Noted.Major Areas Inspected: Applicant Actions on Previous Insp Findings,Followup on Violations/Deviations & Assessment of Allegations IR 05000445/19890491989-07-21021 July 1989 Insp Repts 50-445/89-49 & 50-446/89-49 on 890607-0705.No Violations or Deviations Noted.Major Areas Inspected: Applicant Actions on Previous Insp Findings,Followup on Violations/Deviations & Corrective Action Program IR 05000445/19890451989-07-21021 July 1989 Insp Repts 50-445/89-45 & 50-446/89-45 on 890607-0705.No Violations or Deviations Noted.Major Areas Inspected: Preoperational Retest Procedure Review,Preoperational Test Witnessing,Plant Tours & Operational Staffing IR 05000445/19890471989-07-20020 July 1989 Insp Repts 50-445/89-47 & 50-446/89-47 on 890607-0705.No Violations or Deviations Noted.Major Areas Inspected: Applicant Actions on Previous Insp Findings,Followup on Violations/Deviations & General Plant Areas IR 05000445/19890481989-07-19019 July 1989 Resident Safety Insp Repts 50-445/89-48 & 50-446/89-48 on 890607-0705.No Strengths or Weaknesses Noted.Major Areas Inspected:Util Action on Previous Insp Findings & Action on self-identified 10CFR50.55(e) Deficiencies IR 05000445/19890461989-07-19019 July 1989 Insp Repts 50-445/89-46 & 50-446/89-46 on 890607-0705.No Violations or Deviations Noted.Major Areas Inspected: Applicant Actions on Previous Insp Findings,Plant Procedures for Operations & Applicant Meetings IR 05000445/19890391989-07-17017 July 1989 Insp Repts 50-445/89-39 & 50-446/89-39 on 890626-0706.No Violations or Deviations Noted.Major Areas Inspected: Containment Integrated Leak Rate Test IR 05000445/19890421989-07-17017 July 1989 Insp Repts 50-445/89-42 & 50-446/89-42 on 890605-09.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Programs Organization & Mgt Controls, Training & Qualifications & External Exposure Controls IR 05000445/19890441989-07-12012 July 1989 Insp Repts 50-445/89-44 & 50-446/89-44 on 890607-0705.No Violations or Deviations Noted.Major Areas Inspected: Applicant Action on Previous Findings,Followup on Violations,Applicant Action 50.55 & Deficiencies IR 05000445/19890301989-07-0707 July 1989 Augmented Insp Team Insp Repts 50-445/89-30 & 50-446/89-30 on 890515-0616.Weaknesses Noted.Major Areas Inspected:Check Valve Failures Which Allowed Backflow Through Auxiliary Feedwater Sys During Hot Functional Testing of Unit 1 IR 05000445/19890371989-06-30030 June 1989 Insp Repts 50-445/89-37 & 50-446/89-37 on 890503-0606. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Action on 10CFR50.55(e) Deficiencies, Followup on NRC Bulletins & SER Verification IR 05000445/19890361989-06-27027 June 1989 Insp Repts 50-445/89-36 & 50-446/89-36 on 890503-0606.No Violations or Deviations Noted.Major Areas Inspected: Applicant Actions on Previous Insp Findings,Followup on Review of 10CFR50.55(e) Deficiencies & NRC Bulletins IR 05000445/19890411989-06-22022 June 1989 Partially Withheld Insp Repts 50-445/89-41 & 50-446/89-41 on 890605-09 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program, Including Protected Area Barriers & Testing & Maint IR 05000445/19890331989-06-19019 June 1989 Insp Repts 50-445/89-33 & 50-446/89-33 on 890503-0606.No Violations or Deviations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Action on 10CFR50.55(e) Deficiencies by Applicant & General Plant Tours ML20245D9941989-06-19019 June 1989 Insp Repts 50-445/89-35 & 50-446/89-35 on 890503-0606. Violations Noted.Major Areas Inspected:Applicant Actions on Previous Insp Findings,Followup on Violations,Applicant Action on NRC Bulletins & Fuel Storage Racks ML20245E0761989-06-19019 June 1989 Insp Repts 50-445/89-32 & 50-446/89-32 on 890503-0606. Violations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Followup on Violations/Deviations,Action on 10CFR50.55(e) Deficiencies & Preoperational Testing Audits IR 05000445/19890291989-05-30030 May 1989 Insp Repts 50-445/89-29 & 50-446/89-29 on 890502-04.No Violations or Deviations Noted.Major Areas Inspected:Unit 1 Solid,Liquid & Gaseous Radwaste Sys,Radioactive Matl Transportation Program & Radwaste Mgt Program IR 05000445/19890221989-05-22022 May 1989 Insp Repts 50-445/89-22 & 50-446/89-22 on 890405-0502.No Violations or Deviations Noted.Major Areas Inspected: Applicants Action on Previous Insp Findings,Followup on Violations/Deviations & Followup on Bulletins IR 05000445/19890241989-05-18018 May 1989 Insp Repts 50-445/89-24 & 50-446/89-24 on 890405-0502. Violations Noted.Major Areas Inspected:Followup on Violation/Deviation,Action on 10CFR50.55(e) Deficiencies,Nrc Bulletins,Preoperational Test Program & TMI Action Items 1990-09-11
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19993011999-07-16016 July 1999 Exam Repts 50-445/99-301 & 50-446/99-301 on 990618-24.Exam Results:Six Applicants for Senior Operator Licenses Passed Exams IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam ML20236G9321998-07-0202 July 1998 Notice of Violation from Insp on 980329-0509.Violation Noted:Four Examples Were Identified,Where Licensee Failed to Meet Requirement for Design of ECCS Switchover from Refueling Water Storage Tank to Containment Recirculation IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217F6051998-04-24024 April 1998 Notice of Violation from Insp on 980215-0328.Violations Noted:Corrective Actions Were Not Sufficient to Identify That Excessive Leakage in ECC Sys Check Valves During Unit 1 Cycle 6 Required Unit 1 Safety Injection Pumps Be Started ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20248L8831998-03-19019 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Licensee Failed to Document Heat Related Degredation of Unit 2,Train B Solid State Safeguards Sequencer IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 07100012/20110221998-01-16016 January 1998 Notice of Violation from Insp on 971012-1122.Violation Noted:Procedure IPO-005B,rev 2,not Appropriate to Circumstances in That Procedure Did Not Require Pressure Be Maintained Below Rc System Pressure & Temp Limits ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20198R6571998-01-16016 January 1998 Notice of Violation from Insp on 970922-25.Violation Noted: on 961029,licensee Made Changes to Emergency Plan,W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) ML20198N2071998-01-14014 January 1998 Notice of Violation from Insp on 970608-0719 & Subsequent Inoffice Reviews Concluded on 971114.Violation Noted: Procedures OPT-102A & 102B Did Not Include Appropriate Quantitative Acceptance Criteria ML20199H0131997-11-21021 November 1997 Notice of Violation from Insp on 970831-1011.Violation Noted:Thermometer IC1473,was Used During Performance of Procedure PPT-SX-7505A on 970807 ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-IV-97-067, on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee1997-11-17017 November 1997 PNO-IV-97-067:on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee PNO-IV-97-066, on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed1997-11-17017 November 1997 PNO-IV-97-066:on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle PNO-IV-97-061, on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed1997-10-30030 October 1997 PNO-IV-97-061:on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20211A0691997-09-19019 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970507,while Performing Procedure OPT-457B,licensed Operator Failed to Close Valve 2-8812A Per Step 8.8 ML20198G1821997-09-12012 September 1997 Notice of Violation from Investigation on 970606.Violation Noted:Mn Shook Submitted Falsified Info to NRC Re Being Denied Access to Nuclear Power Plant as Result of fitness-for-duty Policy 1999-09-14
[Table view] |
See also: IR 05000401/2006021
Text
q ,>*t-g ..s.y\ gm' nv
- --
m -. . ,
.;- . . . . .
'
> +, -
a
' *
g . ../g a m _',3; ,
y , ,
, , c ,
,
r,
-
z- a_ . , - .
%) , n a
- < - >< . ?
'..- -
APPENDIX B ;
'
'
'
'
- < ' -
'
.
U[S.JNUCLEARREGULATORYCOMISSION
, REGION IV
.,.
< >
, .
NRC. Inspection Report: 50-445/85-07- , Permit: CPPR-126
'" '
/ 50-446/85-05 CPPR-127
Docket: 50-445; 50-446
~ . Applicant: Texas Utilities Electric Company (TVEC)
' Skyway. Tower
'400 North Olive Street
Lock Box 81
Dallas, Texas' 75201
'
Facility.-Name: Comanche Peak Steam Electric Station (CPSES)
Units 1 and 2
7-
Inspection At: Glen Rose Texas
Inspection Conducted: April-1, 1985,.through June 21, 1985
! Inspectors:1 - *
aM/ /d Ef
H. 5. Phillips, Senior Resident Date-
Reactor Inspector Construction
_(pars. 1,.2, 3, 8,-9, 10, 11, 15, 16,
'.17, 18, and 19).
s.
dp l Is 9x 2A m a d & / 6 /85
J. E. Cunstins, Senior Resident Reactor IIatd
') Inspector Construction (April 1 - May 10, 1985)
(pars. 1,;3, and 19)
' -
D. E. Norman, Reactor Inspector
/ YJ /dl//W
Date
'
(pars. 1, 12, 13, 14,:and 19)
-
_
lX Y ts5&#~ -
lOL/73*
D. M. H~unnicutt, Section Chief ITate
r t Reactor Projects Branch 2
'
L(pars. 1; 4, 5, 6, 7, and 19)
,
_
- . .
'
060b100251 060203
PDR ADOCK 05000445
.
O PDR
u
l
L-
IL
", -
11._
.
,
' ~ .
f, . , . ,
l i
' [ J( ' , ,
h,1 .,
a 3
'
,- >
-2-
.
,
-i
,
. ,
'
i ' Approved: b mW
D. M. Hunnicutt, Section Chief,
//.2
' Date
84
i
- "
Reactor Project.Section B -
.
Inspection Summary
Inspection Conducted April 1,-1985, through June 21,1985(Report 50-445/85-07)
, t- Areas Inspected:. Routine eannounced and unannounced inspections of Unit 1
7 which included plant tours and review of plant status, action on previous NRC
f nspection findings (violations / unresolved items), review of documentation for
'
site dams, and review of 10 CFR Part 21 and 10 CFR Part 50.55(e) construction
. . ' deficiency status The inspection involved 77 inspector-hours onsite by four
NRC inspectors.
..
<
., Results: Within the areas inspected, five violations were identified: fail-
ure to promptly correct an identified problem with RTE - Delta Potential .
'
', Transformer Tiltout Subassemblies, paragraph 3.a.; consnercial non-shrink * grout x
.
l . was used to grout the Unit I reactor coolant pump and steam generator supports
' ' in lieu.of ' Class "E" concrete, paragraph 3.b.; hydrogen recombiners out-of +
'
' '
- specification voltage. recorded on quality release document but QC receipt
.
'
inspector accepted, paragraph 3.c; failure to provide objective evidence to
1 show that central and truck mixer blades were inspected, paragraph 8; and '
r' .
~_
. failure to' issue.a deficiency report on cement scales that were out-of-calibra-
x tion, paragraph 9.c.
~
d
,
.* . Inspection Sumary, ,
< ?
.
, .
!
,
-Inspection Conducted April 1, 1985, through June 21, 1985 (Report 446/85-05). ' (
'
Areas' Inspected: Routine, announced and unannounced inspections of= Unit'2 ,
j ,'
which. included plant-tours and review of plant status, action on previous NRC '
inspection findings (violations / unresolved items), review of documentation for "
,
site dams, review of documentation for voids behind the ~ stainless steel cavity
, liner;of reactor building, observation'of NDE on liner plates, inspection of
concrete batch plant,: review of calibration laboratory records for batch plant, , ,
review of concrete laboratory testing, in pection of level C and D storage, '
review of reactor pressure . vessel (RPV)'and piping records / completed work, and- ,
review of 10 CFR Part 21 and 10 CFR Part 50.55(e) construction deficiency-
a status, and review of violation and unresolved items status. The inspection
involved 335 inspector-hours onsite by four NRC inspectors.
,
'
Results: Within the sixteen arev inspected three violations were identified:
failure to correct RTE-Delta transformer problem. paragraph 3.a; failure to
provide objective evidence to show that concrete central and truck mixer blades
were inspected, paragraph 8; and failure to issue a deficiency report on cement
scales that were out-of-calibration, paragraph 9c.
!
. . _ < ~__.L--____..:_._-.______-___-__.__.__._.---__-._-_-___.
s
- >
_. ,
,
,
I
%
t
>
$
,
'
'
-3- -
'
DETAILS
'
~ - i
'
[ t > ,
,
', , .
<
r
,, 1. Persons Contacted ,
.
-
,
'
4I ' Applicant Personnel.
-
'
M. McBay, Unit 2 Reactor Building' Manager ,
B.. Ward, General Superintendent, Civil .
' D. Chandler. QA/QC Civil Inspector
1 W. Cromeans QA/QC, .TUGC0 Laboratory / Civil Supervisor .
*fJ. Merritt, Assistant Project-General Manager
^
- fP.;Halstead, Construction Site QA Manager '
"
- C. Welch,QASupervisorTUGC0(Construction)
'J. Walters, TUGC0 Mechanical Engineer
.
K. Noman,' TUGC0 Hechanical Lngineer
J. Hite, B&R Materials Engineer
G. Purdy, BAR CPSES QA Manager
i
- Denotes those present at May 10, 1985 exit interview.
- Denotes those present at June 10, 1985 exit interview,
r
!
The NRC inspectors also interviewed other applicant employees during this
inspection period.
2. Plant Status
Unit 1,
At the time of this inspection, construction of Unit I was 99 percent
complete. The fuel loading date for Unit 1 is pending the results of l
ongoing NRC reviews.
Unit 2
- At the time.of this inspection, construction of Unit 2 was approximately
74 percent complete. Fuel loading is scheduled for approximately 18
'
months atter Unit 1 fuel loading. ,
3. Applicant Action on Previous NRC Inspection Findings s
.
a. (Closed) Unresolved Item 445/8440-02: Potential Problem with .
'
Potential Transformer Tiltout Subassemblies.
By letter dated June 15, 1983 Transamerica Delaval notified the
applicant of an RTE - Delta 10 CFR Part 21 report to the NRC
reporting a potential problem with the primary-disconnect clips of
the potential transformer tiltout assembly used in the emergency
diesel generator control panels at CPSES. ~ The Transamerica Delaval
L Y
___1__.-___._____
.- >
,
. . .
\
s
letter also provided instructions for correcting the problem.
However, the NRC inspector could not determine if the problem had
been corrected at CPSES and made this an unresolved iten. The
applicant determined that.the problem had not been corrected and
subsequently performed the recommended corrective action. The Unit I
corrective action work activities were documented on startup work
permits Z-2912 (train A) and Z-2914 (train B). The Unit 2 work
activities are being tracked as master data base (MDB) item 3003-31.
The failure to promptly correct this identified problem is an
apparent violation l445/8507-01; 446/8505-01). .
,
, b. (Closed) Unresolved Item 445/8416-03: Commercial Grout Used in Lieu
of Class "E", Concrete
,
The applicant determined that the use of nonshrink comercial grout
in lieu of the Class "E" concrete specified on drawing 2323-51-0550
was acceptable. Design Change Authorization 21179 was issued to
-
'
drawing 2323-51-0550 accepting the use of the corrercial non-shrink
grout. However, the failure to grout with Class "E" concrete as
specified on the drawing at the time the work was' accomplished is an
apparent violation (445/8507-02).
c. (Closed) Unresolved Item 445/8416-04: Hydrogen Recombiners -
+ Out-of-Specification Voltage Recorded on Westinghouse Quality ,
Release Document
t-
'
4
, .
'
Quality Release N-41424 was revised by Westinghouse changing the
, , ,
'
specified voltage from 10+-2V to 12+-2V which put the questionable
'
voltage within specification linits. However, the failure of receipt
. . inspection to verify that the QRN-41424 was filled out accurately as
required by' Procedure QI-QAP7.2-8 is an apparent violation
.(445/8507-03).
.
c d.. (0 pen 1 Unresolved Iten 445/8432-06; 446/8411-06; Lobbin Report
,
, Described Site Surveillance Program Weaknesses
During this reporting period the NRC inspector reviewed the status of ;
this open item several times and interviewed TUEC management and site '
surveillance personnel. The Lobbin report stated that the scope and
objectives of the site surveillance program were unclear, lacking
both purpose and direction.
There is no specific regulatory requirement to have a surveillance
program; however, TUEC committed to have a surveillance program and
1as established procedures to implement such a program as a part of
the 10 CFR Part 50, Appendix B, QA program. This extra effort is a
strength; however, the NRC inspector also observed, as did the Lobbin L
Report, that the surveillance progran lacks both purpose and
direction to be effective and complimentary to the audit and
l
l
l
l
l
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ -
,y .
-
,
- a
' '
- '
..
,
, ,
'
'
,
e .
.
A%
v '
..s.
'
'
,
l
>:c
..
,
inspection programs. Since the TUEC audit group is not located on ,
>
site, the TUEC surveillance program on site takes on added
-
significance. , ,
- :,
'This item was discussed with the TUEC site QC manager who described a
reorganized site surveillance function and changes that have
1 occurred. New procedures which describe this organization's duties
,
'
and responsibilities are forthcoming.- ,
'
TUEC has elected to defer responding'to the violations pertaining to
~
.
the audit function in NRC Inspection Report 445/84-32; 446/84-11, but
rather to ha've the Comanche Peak Response Team (CPRT) respond to this
report and other QA-matters. .The surveillance issue is closely tied '
to the audit deficiencies in NRC Inspection Report No. 445/84-32;
,
' 446/84-11. This item will remain open pending the review and imple-
'
< mentation of the CPRT action plan. A special point of interest will
be how audits and surveillance work together to evaluate the control
-of all safety-related activities on site to assure quality,
,
especially the overview of quality control effectiveness.
'
'
4. Document Inspection of Site Dams ,
The NRC inspector reviewed documents describing the inspection activities
p(erformed
SSI) for im>oundingon thecooling
Squaw Creek
water for theDam (SCD)
two' units and the
at CPSES. Thesafe shutdown i
purpose of tie SCD is to impound a cooling lake for CPSES. A secondary
reservoir (SSI) is formed by a channel connecting the SCD impoundment to
the SSI.
Three documented ins'pections have been perfonned since 1980. The
inspections were:
,
a. Relevant data for SCD is contained in Phase ! Inspection', National
'
~
Dam Safety Program, Squaw Creek' Dam..Somervell County, Texas, Brazos
River Basin, inspection by Texas Department of Water Resources. Date
- of Inspection
- June 10, 1980.
'
=b. Inspection on August 25, 1982,-bj registered professional engineers
,
from Mason-Johnston & Associates, Inc., and Freese & Nichols, Inc..
i
c. Inspection on September 19, 1984, by a registered professional
engineer from Mason-Johnston & Associates Inc.
r
l The ins >ection activities consisted of visual inspections by inspection
,,
teams t1at included accompanying Texas Utilities Service, Inc. (TUSI),
!: andTexasUtilitiesGeneratingCompany(TUGCO) representatives.
L
Photographs were taken as a part of the documentation. The data for the
!
~
L *
l ,
.
p .
. .
- -
-
i
s
-6-
piezometer. observations and the data for the surface reference monuments
'were reviewed by applicant personnel and Mason-Johnston engineers.
- No items of significance were observed or reported by these inspection
'
teams. Slight erosion areas were observed and reported. A cracked area
on the service spillway upstream right bridge seat was observed by the
inspection teams and continued monitoring of this area was recommended by
Mason-Johnston and Associates. No signs of cracks, .;ettlements, or
horizontal movement at any location within the SCD or the SSI were
reported.
i
The NRC inspector reviewed the applicant's records and the Mason-Johnston
inspection reports. These documents indicated that the SCD and SSI were
structurally stable and that the applicant was performing inspection
activities to maintain the structural integrity of these dams.
The state of Texas requires periodic inspections of these dams
(principally the SCD) due to inhabited dwellings downstream. The
'
applicant has met these inspection requirements.
,
No violations or deviations were identified.
5. Voids Behind the Stainless Steel CaviA1.iner in Unit 2 Reactor Buildina
In review of previous related TRT concerns, the NRC inspector reviewed
applicant records, including NCR C-82-01202; NCR C-1784, Rev.1; NCR
C-1784,
Rev.1; NCR Rev.C-1824,
2; NCRRev.
C-1766, Rev.1; NCR
2; Significant C 1791,
Deficiency Rev.1;Report
Analysis NCR C-1824,(SDAR)
- 26, dated December 12,1979; DCA-20856; and Gibbs and Hill Specification
2323-55-18. The review of records and documentation and discussions with
various applicant personnel indicated the following:
Structural concrete was placed in Unit 2 reactor building at
elevation B19 feet 6-3/4 inches to 846 feet 6 inches on June 21,
1979. This concrete was placed adjacent to the stainless steel liner
wall s. The concrete forms for this pour were not removed until
-
October 1979 due to subsequent concrete placements for the walls to
elevation 860 feet 0 inches. When the forms were removed, honeycombs
and- voids were observed by appi tcant personnel . The applicant's
review of the extent of unconsolidated concrete resulted in the
issuance of SDAR-26 on December 12, 1979. Investigations were begun
and Meunow and Associates (It&A) of Charlotte, North Carolina, were
contracted to perform nondestructive testing on in-place concrete.
M&A performed these tests on a two foot grid pattern on the
compartment and liner sides of all four steam generator (SG)
compartment walls. The selectcd test locations did not include the
locations where the voids were later found to be located.
r
. .
.
-7-
In August 1982, preparations were made to pour the concrete annulus
around the reactor vessel. When the expanded metal formwork was
removed from the reactor side of the compartment walls, voids were
observed and NCR C-82-01202 was prepared. DCA 20856 was prepared as
a procedure to repair the void area. DCA 20856 indicated that the
voids were not extensive (a surface area of about 28 square feet by 8
inches maximum depth) and that the repair procedure assured that the
total extent of voids had been identified. One half (0.5) of a cubic
yard of concrete was used to complete the repairs as indicated on
grout pour card 261.
The applicant's review and evaluation of the gird pattern and a
comparison of SG compartments 2 and 3 to 1 and 4 indicated that voids
did not exist in SG compartments 2 and 3. The review of tv.st girds
extended down to elevation 834 feet, which is the floor elevation of
the liner. The liner walls of SG compartments 1 and 4 were not
tested at elevation 834 feet, but at elevation 836 feet which is
above the area of the identified voids. No testing was done on the
liner side of the area of the voids below elevation 836 feet. The
program also included removal of 2 inch x 2 inch plugs from the
stainless steel liner at locations where test indications raised
questions concerning the concrete. The inspections of the concrete
by applicant personnel after the plugs were removed confirmed that
there were no additional unconsolidated concrete areas (voids).
In accordance with OCA 20856, the applicant removed stainless steel
liner plates from three areas (one area about 1 foot by 1 1/2 feet
and two areas about 3 feet by 1 foot, excavated or chipped to sound
concrete, and cleaned the concrete surface area. One and one-quarter
inch (1 1/4) diameter probe holes and grout access holes were drilled
in the liner plates to determine the extent of and to assure full
definition of the void area. Air access holes were drilled in the
stainless steel liner plates to assure that grouting would be
accomplished in accordance with the procedure.
The procedure (DCA-20856) specifed that the grout was to be cured for
28 days or until the grout reached a compressive strength of 4000
psi. Repairs to the liner plates were specified in DCA-20856 and G5H
Procedure 2323-SS-18.
OCA-20856 required that under no circumstances was cutting of the
liner across weld seams, across embedded weld plates, or into leak
chase seal welds or drilling.through the liner at leak chase
channels, embeds, or weld seams permitted. Documentation review-
indicated that DCA-20856 was adhered to and that no cutting or
drilling occurred in prohibited locations.
No violations or deviations were identified.
.. .
s
&
-8-
- 6. Nondestructive Testing Observations of Liner Plates in Fuel Transfer Canal
- The NRC inspector observed portions of non-Q liquid penetrant examinations
. (PT) being performed on liner plate welds following re-installation of the
. liner plates in the areas of the fuel transfer canal removed for
. inspection and repair of the concrete. The inspector. performed the PT on
the welds as required by the. repair package and the procedure
(QI-QP-11.18-1, " Liquid Penetrant Examination"). Scattered weld porosity
was. identified by the. inspection. 'The porosity was ground out'and a
repeat PT was performed. The final. inspection is scheduled to be
performed by QC inspection personnel. Thesliner plate areas to be
Linspected by PT were identified in DCA 20856.~
No violations or deviations were identified.
7. Cadweld Splice Observations and Records
a. -Calibration of Tensile Tester
The NRC inspector observed the calibration of the Tinus-Olson
Universal Testing Machine (Model Number 600-12 Identification Number
M&TE-784) on April 2 and May 7, 1985. The machine was calibrated'
just prior to performing tensile testing of cadweld splices and
subsequent to completion of tensile testing each day that tensile
testing was performed. The machine calibration.date for April 2
1985, prior to start of tensile testing was observed by the NRC
inspector and recorded as follows:
Nominal load Calibration Reading Error Error Remarks
-(1bs) (1bs) (1bs) %
0 0 0 0 0 machine en
'
4/2/85
100,000 99,750 +250 +0.25
.200,000- 199,600 +400 +0.2
300,00 299,450 +550 +0.18
350,000 350,300 -300 -0.08
400,000 401,200 -1200 -0.03
500,000 501,350 -1350 -0.27
600,000 602,450 -2450 -0.40
The NRC inspector reviewed calibration data for March 4, March 8
April 2, April 3. April 30, and May 7, 1985. All calibration data
met within the +/- 1% accuracy requirement specified by Calibration
,
Procedure 35-1195-IEI-37, Revision 3, dated March 11, 1982. The
reference standards were identified as follows:
!
.
L
L --
?"y?
.
'
+
,
-
,
.
,
,
'
'
,
}cl n ,
'
- * , .
. .
'
' ' '
9 , ,
-9-
~
'
-
, , ,
g- .'
ID No. . Manufacturer
_
Calibration Due Date ,
RS-75 ? 'BLH Electronics . January 27, 1987 -
<
1 - y 'RS-75.3 .BLH. Electronics January 27,~1987
_
b.- Observation of Cadweld Splice-Tensile ^ Testing
^ '
! .-(1) LQ ualification Tensile Testing
- On April 2,1985, the NRC inspector observed the following
'-
' tensile testing of cadweld splices for cadwelder qualification:-
b '
.y EBD Q8, GBH Q1,' GBH Q2, GBV Q1, BFD Q4, BFD Q3,: BFH Q4, GAH Q1,
GAV Q1,-and GBV Q2..
,
Each of the above qualification cadweld splices was tensile
. tested'to 400,000 pounds (100,000. psi) and met the requirements
stated in.the procedure..
b- (2) Production Tensile Testing
l'
c The NRC inspector observed the ~ tensile' tester calibrations and
,the following production cadweld splices tensile testing on
May 7. 1985: FXD 3P ,FYD 4P, FYO 8P, FRD 87P, and FUD 6P.
'
~
' Each of the above production cadweld splices was tested to .'
400,000 pounds (100,000 psi)and met the requirements stated in 4
'-
, -the procedure.
(3) Installation of Production Cadweld Splices ;
1
The NRC inspector observed installation'of rebar. and cadweld
splices at frequent intervals (five or more observations per
week during the weeks of April 8 and 15; May 6,13, 20, and'27;
-and June 3,1985). The rebar installation for the Unit 2-
closure was performed in the area identified as elevation 805
feet to elevation 875 feet and azimuth 300. degrees to 335
degrees. .The' installation activities observed included rebar
'
spacing, location of cadwelds, observation of ' selection and
removal for testing of cadweld splices for testing, and
determination-of location of rebars and cadwelds for the
as-buil t .drawi ngs. .
, - (4)'DocumentationReviewed
Ihe NRC inspector reviewed the folicwing documentation for the -
y . rebar placement and cadwelding for the Unit 2 containment
-(reactor building) closure area:
t
?
,3
L.
= _ . _ ___
.3- , , ,
. .
M .
- m -10-
Drawings DCAs NCRs
2323-S-0785, Rev.7 22616, Rev. 1 C85-200294
2323-S-0786, Rev.9 22728 C85-200339, Rev.1
2323-S1-500, Rev.5 22737 C85-200355, Rev.1
2323-S1-506, Rev.5 22836
'
2323-S2-505, Rev.5 22878 (Sheets 1-7)
, 2323-S2-508, Rev.2 22772
2323-52-506, Rev.3
No violations or deviations were identified.
8. Concrete Batch Plant Inspection, Unit I and 2
The NRC inspector inspected the concrete production facilities for the
following specific characteristics for the following areas: (1) material
storage and handling of cement, aggregate, water and admixture, (2) batching
equipment scales, weighing systems, admixture dispenser, and recorders,
(3) central mixer (not applicable because it had been- dismantled),
(4), ticketing system, and (5) delivery system.
The current batching is a manual operation since almost all concrete has
been placed. The central mixer was dismantled and removed from site two
or three years ago when concrete placement was virtually completed.
Presently, the backup batch plant (which was a backup system for the
central mixer) is.in operation to complete the remaining concrete
placements. This batch plant is in good condition and complied with the
subject checklist except for one area.
The NRC inspector inspected the inside of one of three trucks used for
mixing concrete (that is, the batch plant dispenses the correct weight of
materials as required by the specific design mix numbers and the truck
then mixes the batch to be placed.) The blades inside the truck are
subject to wear and should _be checked at a reasonable frequency. The
Brown & Root (B&R) representative responsible for checking the blades in
accordance with B&R Procedure 35-1195-CCP-10, Revision 5, dated
December 4,1978, was asked _for evidence that the blades had been checked
for wear on a quarterly basis as required by procedures and it was found
that there was no record of such checks dating back to 1977 when they were
initially checked.
In the FSAR Volume V, Section 3.8.1.2.3, the applicant commits to
ACI 304-73. In- ACI 304, the maintenance of mixer blades is required.
Procedure CCP-10, paragraph 3.10 " Truck Mixing " is silent on blade wear
but Section 3.11 infers that the blades should be checked for both central
and truck mixing. The inspection of both central and truck mixing blades
p'
-
.
. .-
-11-
was not documented, although the B&R representative stated that the mixing
blades were periodically inspected and laboratory testing would have
probably indicated if there was a problem with the mixing blades.
Strength and uniformity tests have consistently been within the acceptable
range indicating that concrete production was acceptable even though
mixing blade inspection was not documented.
Otherwise, the condition of the inside of the truck was satisfactory as
the drum and charging / discharging were clean. The water gage and drum
counter were in good condition.
-
This failure to follow procedures is a violation of 10 CFR 50, Appendix B,
' Criterion V. Subsequent to the identification of this violation, the
blades were checked for wear and blade wear was presently within allowable
limits (445/8507-04; 446/8505-02).
No other violations or deviations were identified.
9. Calibration Laboratory for Batch Plant Unit 1 and 2
The NRC inspector obtained batch plant scale numbers from tags which
indicated ~ that the scales had been calibrated and were within the
calibration frequency. Cement (MTE 779), Water (MTE 766), admixture scale
(MTE 764), and aggregate (MTE 780) were reviewed. The scales had been
periodically calibrated since the batch plant was activated. The records
~
were adequate except as follows:
a. Scales MTE 766 records do not differentiate between the
required accuracy of the scale and the digital readout.
b. Scales MTE 779 and 780 records show various accuracy ranges for the
same scale; i.e., MTE 779 (SN749687) records the following: report
dated January 1976 gives 1%; report dated July 1976 gives 1% while
'the report dated October 1976 gives +/- 0.2%.
The calibration appeared to be proper, however, the above items are unre-
solved pending further review of the applicant's actions regarding the
correction of these records (445/8507-05; 446/8505-03).
c. Records for scales MTE 779 records contained B&R memo IM-1108 dated
July 16,1975, which described a nonconforming condition. This condi-
tion affected the water and cement scales causing a 24-48 pound deviation
(7,000 pound scale) during the calibration test. The memo stated that
,
the condition was corrected and the scales were then calibrated; however,
no deficiency report was written as required by B&R Procedure
CP-QCP-1.3, " Tool and Equipment Calibration and Tool Control" dated
July 14,1975, and CP-QAP-15.1, " Field Control of Honconforming
Items," dated July 14, 1975. As a result there is no evidence that
--
3--__ ,
1-.-
..
LS1
~
l -
.
Y .
-
'
1
-12-
,
>
s ,
E ,, -corrective action included an evaluation to determine if concrete
g7 , ' production was adversely affected.
This failure to assure that a nonconforming condition was evaluated
is a-violation of Criterion XV of 10 CFR Part 50, Appendix ~ B,
(44G/8507-06; 446/8505-04).
, ~
, . 10. Concrete Laboratory Testing Units 1, and 2
TUGC0 Procedure QI-QP-11.1-1, Revision 6, was compared with ASME
'
Section III, Division 2, Subsections 5222, 5223 and 5224 to assure that
>~ .eac -h ASTM testing requirement was incorporated into the procedure.
The NRC -inspector inspected the testing laboratory equipment and found'the.
test area and equipment were in good condition and each piece of equipment
. :was tagged with a calibration sticker which showed it to be within the .
required calibration frequency. Test personnel were knowledgeable of test
.
requirements and equipment.
'
The NRC inspector witnessed field tests performed by laboratory personnel
as follows:
Date Truck No. tiix No. Ticket No. Air Content (%) Slump'(in.) *
Temp ('F)
'
6/3/85 RT-41 925 .64013 Req 8.2-10.3 NA 70 max
Mea 8.7-9.1 NA 57
6/3/85 RT-35 128. 64014 Req 5.0-7.0 5 max 70 max
lica 6.6 6.25* 57
- Initial slump was high; however, after additional truck rotations the
slump was found acceptable.
The following laboratory equipment was checked and found to be within
calibration: Forney Compression Tester, MTE 3031; Temperature Recorder
MTE 3013a ' nd 3014; Unit Volume Scale, lite 1053; Pressure Meters lite 3000B,
3002 and 3004; Sieves MTE 1286, 1239, 1272, 1274, 1136A, 1156, 1094, 1093,
1095,1178,1179,1300 and 1180; Aggregate scales, MET 1058 and 1067; and
2" grout mold MTE 1111.
The following test records for placement number 201-5805-034 were
reviewed: (1) concrete placement inspection, (2) concrete placement
summary and, (3) unit weight of fresh concrete.
No violations or deviations were identified.
.
,
_
m, .;
~ ;,; [ .
m . .
-
+
.>
t ,
r_
- -13-
'
11. LInspection of Level C and D Storage Unit 1 and 2'
The NRC-inspector inspected all laydown areas where piping, electrical
conduit, cable, and structural reinforcing steel were stored. These.
materials were neatly stored outside on cribbing in well drained areas ,
.. which allowed air circulation and avoided trapping water. This met the
, Level "D" storage requirements of ANSI N45.2.2.
The electrical warehouse contained miscellaneous electrical hardware.
.This building was required to be fire resistant, weathertight, and well
ventilated in order to meet Level "C" storage requirements. This
warehouse was well kept and met all requirements except for a lock storage
area located upstairs at the rear of this building (electrical termination
tool room). Two minor problems were identified and the warehouse
personnel initiated action to correct them.
The first problem noted was that a box of nuclear grade cement was marked
" shelf life out of date" but it had no hold tag. The box was subsequently
tagged inaccordance with TUGCo nonconformance Procedure CP-QAP-16.1,
Revision 24 (Nonconformance Report (NCR) E85-200453) after being identified
by the NRC. During discussions with the warehouseman, the NRC determined
that engineering told the warehouseman to mark the material and lock it up,
but did not tell him to apply an NCR or hold tag. Also, the NRC inspector
noted a very small leak in the roof above the electrical termination tool
room.. This leak was in an area that did not expose hardware to moisture.
The roof is currently being repaired.
The millwright warehouse storage area was inspected; however, only a small
number of items or materials were stored in this area. The overall
storage conditions in this area met or exceeded Level "C" storage
requirements.
No violations or deviations were identified.
12. Reactor Pressure Vessel and Internals Installation - Unit 2
This inspection was performed by an NRC inspector to verify final
placement of the reactor pressure vessel (RPV) and internals by examining
the completed installation and inspection records.
a. Requirements for Placement of RPV
'
l
Requirements for placement of the RPV to ensure proper fit-up of all
'
other major NSSS equipment are in Westinghouse Nuclear Services
Division (WNSD) " Procedure for Setting of Major NSSS Corrponents",
l' Revision 2, dated February 13, 1979, and " General Reactor Vessel
- Setting Procedure" Revision 2, dated August 30, 1974. The NRC
L
!
l
.
t
_
, ,
~ .
4
.
-14-
.
inspector reviewed the following drawings, which were referenced in
the RPV operation traveler, to verify implementation of WNSD
recommendations: ,,
o WNSD drawing 1210E59 " Standard - Loop Plant RV Support Hardware
Details and Assembly"
o WNSD drawing 1457F27 " Comanche Peak SES RCS Equipment Supports -
Reactor Yessel Supports"
o CE drawing 10773-171-004 " General' Arrangement Elevation"
o CE drawing 10773-171-005 " General Arrangement Plan"
Neither site prepared installation drawings nor specifications -(which
implemented the WNSD recommended procedures) were available and the
drawings examined did not show certain specific installation
criterion such as centering tolerances, levelness tolerances and
clearance between support brackets and support shoes.
The inspector considers this matter unitsolved. (446/8505-05)
b. Document Review
The NRC inspector reviewed B&R Construction and Operation Traveler
No. HE79-248-5500 which described the field. instructions for
installation of the Unit 2 RPV. Requirements recommended by WNSD
procedures were implemented in the traveler. Worksheets attached to
the traveler showed the RPV to be centered and leveled within the
established tolerances. Traveler operation 19. required verification
-of a 0.020 to 0.005 inch clearance between the support bracket and
support shoe, after, applying the shim plates.' Change 5 subsequently
changed the clearance to a 0.015 to .025 inch clearance. The
installation data reflected in attachment 3B of the' traveler ,
indicated an as-built clearance of 0.012 to 0.026 inch which~ exceeds
both the original and revised tolerances. 'This. condition was'
,
accepted on the traveler based on Westinghouse concurrence, and there
was no documented engineering evaluation ensite justifying the final
?- tolerances. This matter is considered unresolved pending documentation
validating the final installation tolerances.- (446/8505-06)
The NRC inspector reviewed the following receiving records for the,
'
RPV hardware and found them to be in order:
'
o Report No.14322 for 54 each closure studs, closure nuts, and
closure washers
o Report No. 09507 for vessel S/N 11713, Closure Head 11713 and 26
0-Rings
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ __
. .
-15-
o Deviation notices and corrective action statements
The NRC inspector reviewed the following completed travelers for
internals installation and found them to be satisfactory:
o ME-84-4641-5500, " Assemble Upper Internals"
o ME-84-4503-4000, " Install and Adjust Roto Locks"
o ME-81-2145-5500, "Retorque UI Column Extension"
o RI-80-385-5500, " Transport and Install Lower Internals"
o ME-84-4617-5500, " Repair Lower Internals"
o ME-84-4640-5500, " Assemble Lower Internals"
c. Visual Inspection
At this time, visual inspection of the internals by the NRC inspector
was not possible, and inspection was limited on the vessel placement
to a walk-around beneath the vessel to inspect the azimuth markings
and for construction debris between the vessel and cavity. No
problems were identified in this area.
d. Records of QA Audits or Surveillances
The NRC inspector r 'uested TUGC0 QA audits or surveillances
performed by TUGC0 u the Unit 2 RPV installation. TUGC0 did not
make available any documentation of an audit or surveillance which
evaluated specified placement criteria, placement procedures,
hardware placement, or as-built records. This item is unresolved
pending a more comprehensive review of these activities
(446/8505-07).
No deviations were identified; however, two unresolved items were
identified and are described in the above paragraphs. (11.aandd)
13. Reactor- Yessel Misorientation
On February 20, 1979, the applicant reported to the NRC Resident Inspector
that a design error had resulted in the reactor support structures being
placed in the wrong position on the reactor support pedestal such that the
reactor would be out of position by 45 degrees. Initially Unit 2 was to
be a mirror image of Unit 1, however, a design change was initiated to
permit identical components for both units. The design change was
implemented for the reactor vessel, but not for the pedestal support
locations. The problem was not considered by the applicant to be
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,
'
-
, i
,-
s
-16-
,
. reportable under provisions of 10 CFR Part 50.55(e) since the error could
not have gone undetected.
'
The deficiency was reported to the NRC Office of Inspection and Enforce-
,
ment on February 22, 1979 and during a March 27, 1979 meeting in Dethesda,
Maryland, the applicant presented the proposed redesign and rework proce-
dures for relocating the pedestal supports. No unresolved safety concerns
with the repair were identified at the meeting.
'
During this inspection the NRC inspector reviewed various documentation
relative to the misorientation problem, including design changes and the
construction traveler which implemented the repair.
The following documents were reviewed;
o NRC Inspection Reports 50-446/79-03; 50-446/79-07; 50-446/79-13
o TUSI Conference :lemo, dated March 1, 1979 H. C. Schmidt to S.
Burwell (NRC Licensing PM)
o .TUGC0 letter TXX-2980, dated April 30, 1979, to W. C. Seidle
o NRC letter to TUGC0 dated May 29, 1979
o DCA 3872, Revision 1, dated February 28, 1979, Subject: Rework of
Structure for Placement of the RPV Support Shoes
o DCA 4122, dated March 22, 1979, Subject: Replacement of Rebar for
RPV Supports
o Construction Traveler CE79-018-5505, dated Itarch 14, 1979, Subject:
Rework of Reactor No. 2 Cavity - New RPV Support Locations
o Grout Replacement Cards No. 007, 008, 009, 010, 014, and 015, various
dates, Subject: Replacement of Grout around Rebar for Repair.of RPV
Support Shoes
o Various Inspection Reports for Grout Properties and Application for
RPV Support Shoes
!- No violations or deviations were identified.
14. Reactor Coolant Pressure Boundary (RCPB) Systems
4
'
The inspection was performed to verify: the applicants system for
preparing, reviewing, and maintaining records for the RCPB piping and
components; that selected records reflected compliance with NRC
requirements and SAR comitments for manufacture, test and installation of ,
Y
..
[
_ ___
7
'
. : -
1
1:
,
e
-17-
. items; and as-built hardware was a'dequately marked and~ traceable to
'
' '
,
records. The following items were randomly selected and inspected:
.o , a. Pressurizer Safety Valve - This item was . inspected to the comitment ,'
stated in FSAR, Table 5.2-1 which includes ASME Section III, 1971
Edition through Winter 1972 Addenda. Valve S/N N56964-00-007, which
is installed in the B position, was inspected. The following records
_
were reviewed:
~
o ~QA Receiving Inspection Report No. 21211
o Code Data Report Form NV-1 .
I o Valve Body Certified Material Test Reports -(CHTRs)
The valve was in place, however, installation had not been completed;
therefore, the hardware installation inspection consisted of
verifying that the item was. traceable to the records.
b. CVCS Spool Piece 301 - Requirements for this item are stated in ASME,
Section III,1974 Edition through Sumer 1974 Addenda, which is the
comitment from the FSAR, Table 5.2-1. The item was field fabricated
from bulk piping and purchased elbows and installed in the CVCS with
field welds number 1 and 6 (ref. BRP-CS-2-RB-076). The following
records were reviewed:
o- B&R Code Data Report
, o Field Weld Data Card
o .NDE Reports
o QA Receiving Reports for piping and elbows
o CMTRs
The installed spool piece was inspected for weld quality and to
verify that marking and traceability requirements had been met. The
item had been' marked with the spool piece number (3Q1).and the B&R
drawing number which provided traceability to the material
certifications.
c. Loop 3'RC Cold Leg - Requirements for this item are stated in ASME,-
Section. III,1974 Edition through Sumer 1974 Addenda, which is the
comitment from the FSAR, Table 5.2-1. This piping subassembly
'C consists of a 27.5 inch cast pipe with a 22 degree elbow on the
reactor end, a 10 inch 45 degree nozzle, a 3 inch nozzle,-and three 2
'
L
,; x w ' ~
y3.;;;%; ;;. .. ,; w c
_%
.' . s; *- "
'
~'
' '
i L. ,
3,, ,
3
.
,r, {; r
.
[' _ ' \ '
-18-
.
. . , -
'
1/2 inch thermowell installation bosses. 'The following records' were
' '
reviewed for the subassembly:
'
, ,
'
x .
.
<
y o- QA Receiving Inspection Report No. 12389
o Westinghouse Quality Release (QRN 47523)
o- ' Code Data Report Fonn NPP-1
0 27 1/2 inch line CMTR
o 3 inch nozzle CMTR
o Field Weld Data Cards
o NDE Reports
(1) Sandusky Foundry and Machine Company test report for the cold
leg pipe certifies that material meets requirements of ASME
Section~II, 1974 editions through winter 1975. Southwest
Fabrication and Welding Company code data report NPP-1 Form
certified that the _ cold leg subassembly met requirements of ASME ,
Section III, 1974 edition through winter 1975.
(2) The NRC inspector reviewed the procedures and hydro test-data
applicable to Unit 1 since Unit 2 hydro had not been completed.
'
Requirements for the tests were presented in Procedures
CP-QAP-12.2, " Inspection Procedure and Acceptance Criteria for
ASME Pressure Testing" and CP-QAP-12.1, "ASME Section.III
Installation, Verification, and N-5 Certification."-Procedure
CP-QAP-12.1 requires that a data package to be used in the test,
'
be prepared with the test boundary and the additional following
data shown:
~
o Base metal . defects in which filler material has been added,
and the depth of the base metal defect exceeds 3/8 inch or
10% of the actual thickness, whichever is less.
d
.
{[ -o . Untested. vendor performed piping circumferential welds.-
.y,
'
o Approximate location and material identification and
,
description for permanent pressure boundary attachment with
applicable support number referenced.
'.
.,;y
.,
+
,
7^
~
,
J o ~ Weld history, which shall reflect weld removal and/or weld-
~
,
,
n '
- ~'
-
repair. '
, ,
,
6
g
1
-
,
'
> rf
..
. .c
e
4
-
f ~ g[ .
_
- '
. _ . .. .
. . . .
,
-19-
The completed hydro data package (PT-5501) for Unit 1, loop 3
cold leg was reviewed for compliance with the above
requirements. Drawing No. BRP-RC-1-520-001 had been used to
annotate the test boundary. A handwritten statement on the
drawing indicated: "No major base. metal repairs could be ,
located" and "No hangers with weld. attachments could be
located." Welds performed by the pipe subassembly vendor.
including the 22 degree circumferential weld and the penetration
fittings had not been identified. The following items are
. unresolved pending further review to determine:
o If the ~ statement "no major base metal repairs" was based on
a visual inspection or on a review of vendor and. site
inspection and repair records.
o If the shop circumferential weld attaching the 22 degree
elbow to the pipe assembly was inspected during the test.
-
o If welds for penetrations into pipe assembly were inspected
since Procedure CP-QAP-12.1 does not require identification of
such welds and they were not identified on the drawing.
The above issues will remain unresolved pending further -
-evaluation by the applicant (445/8507-07; 446/8505-09).
.
d. Personnel Qualifications - Personnel who had performed selected tasks
were identified during inspection of installation records. Training
and experience records for the personnel were reviewed to verify that
employee qualifications and maintenance of- records were current and
, _ met requirements. Names or codes for.five welders and two NDE
examiners, who had performed tasks during installation of the items
being inspected, were identified and their qualification records
. reviewed. There were no questions in this area of the inspection.
No violations or deviations were identified.
15. Special Plant Tours (Unit I and Unit 2) -
.0n May 23, 1985, the NRC inspector conducted a tour of selected areas of
Unit 1 and Unit.2. The group consisted of one NRC inspector, two NRC
Technical Review Team (TRT) representatives, two allegers, and several
TUEC representatives. The TUEC representatives tagged each area where'a
deficiency was' alleged. .With the alleger's consent, a tape recorder was
also used.to note locations and describe any alleged deficiencies. The
allegers indicated that-they had identified all deficiencies during the
f
, vx
- s ;*:. +
.
c
'
-20-
.
-
tour and all.other deficiencies that they had knowledge. The NRC TRT is
analyzing this information and will decide what action, if any, should be
-
~ taken.
'
-
. During this tour the NRC inspector independently identified a . questionable
. practice in that_the-top of the the pipe chase at the north end of room 88
l-> in Unit-1, safeguards building had two large sti.ckers which stated that
' areas' 'on the wall were reserved for pipe hangers GHH-SI-1-SB-038-006 and ,
,
^R1(?)1-087-X11. These stickers were dated 1980. It was not evident-
whether hangers were missing or none were needed in these locations'"and -
ic w the reserve tags were not removed. TUEC representatives were unable to
-,
answer the question immediately. This item is unresolved pending further
'
review during a. subsequent inspection. (445/8507-08).
'
No violations or deviations were identified.
>
"
16. Routine Plant Tours (Units 1 and 2)
..At various times during the inspection period NRC inspectors conducted
general tours of the reactor building, fuel building, safeguards building,
- electrical and control building, and the turbine building. During the
-
tours, the NRC inspector observed housekeeping practices, preventive
. maintenance on installed equipment, ongoing construction work, and
'
discussed various subjects with personnel engaged in work activities. ^<
No violations or deviations were identified.
17. _ Review of Part 21 and 10 CFR 50.55(e) Construction Reports- Status
The NRC inspector reviewed all reports issued to date to assure that NRC
and TUEC status logs were complete and up to date. A total of 183 reports
have been submitted to date. This inspection period one Part 21 report on
Diesel Generator Oil Plugs and two 10 CFR 50.55(e) reports on the
Equipment Hatch' Cover and SA106 Piping (light wall) were submitted.
1h) viol 5tions or deviations were identified.
<
18. Ex!t Interviews
The NRC inspectors met with members of the TUEC staff (denoted in
paragraph 1) on May 10 and June 10, 1985. ~ The scope and findings of the-
inspection were discussed. The applicant acknowledged the findings.
-