ML20151T367
| ML20151T367 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/03/1986 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20151T370 | List: |
| References | |
| NUDOCS 8602100241 | |
| Download: ML20151T367 (2) | |
See also: IR 05000401/2006021
Text
s
,5
6
l
--
In Reply Refer To:
Dockets: 50-445/85-07
MB 0 3 W
50-446/85-05
= Texas Utilities Electric Company
ATTN:
W. G. Counsil
Skyway Tower
400 North Olive Street
!
Lock Box 81
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted under the Resident Inspection Program
by Messrs. J. E. Cununins and H. S. Phillips and others during the period
f'
April 1, 1985, through June 21, 1985, of activities authorized by NRC Construc-
tion Permits CPPR-125 and CPPR-126 of the Comanche Peak facility, Units 1 and 2,
p
and to the discussion of our findings with Mr. J. T. Merritt, and other members of
your staff at the conclusion of the inspection.
Areas examined during the inspection included plant status, action on previous
NRC inspection findings, action on applicant identified design construction
deficiencies (10 CFR Part 50.55(e) reports) and plant tours. Within thesc
i.
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and cbservations by the
inspectors. These findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provision of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter. Since B3R Procedure 35-1195-CCP-10
has been revised to provide documented inspection of truck mixer blades, there
was no abnormal blade wear identified as a result of blade inspection, and there
have been consistent concrete strength and uniformity tests, no reply to
violation 2.c is required.
,-
h
[^
CPT G
DRSP
4
RSB
RSB
,
HSPhillips/dc DMHunnicutt
TFWesterman
EHJohnson
VNoonan ',
-
'
I/w/86
l /p4/86
/ /)i/86
l /g/g
j /w /86
@
0602100241 G60203
/
ADOCK 05000445
.//
G
%
-
.
_
. , .
_--
.
-
-
Texas Utilities Electric Company .
2
~
Should you~ have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
06
o
E. H. Johnson, Acting Director
Division of Reactor Safety and
Projects
'
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
.
'
50-445/85-07
50-446/85-05
cc w/ enclosure:
Texas utilities Electric Company
ATTN:
J. W.-Beck, Manager,
Licensing
Skyway Tower
400 North Olive Street-
Lock Box'81
.
Dallas, Texas
75201
'
Juanita Ellis
President - CASE
1426 South Polk Street
Dallas, Texas 75224
Renea Hicks
Assistant Attorney General
Environmental Protection Division
P. 0l Box 12548
Texas Radiation Control' Program Director
bec;toDMB(IE01)
bcc distrib. by RIV:
- RPB
- MIS System
- RRI-0PS
- RSTS Operator
- RRI-CONST
- R&SPB
- T. F. Westerman, CPTG
DRSP
V. Noonan, NRR
R. Martin, RA
S. Treby, ELD
- R58
- RIV File
J. Taylor, IE
- D. Weiss, LFMB (AR-2015)
R. Heishman, IE
- w/766
.
-.x-
- .
-
-
- -