ML081720231

From kanterella
Revision as of 14:34, 29 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
List of Provided References for Candidates for the Dresden Initial Examination - March 2008
ML081720231
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/03/2008
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML081010290 List:
References
50-237/08-301, 50-249/08-301
Download: ML081720231 (2)


Text

LIST OF PROVIDED REFERENCES FOR CANDIDATES FOR THE DRESDEN INITIAL EXAMINATION MARCH 2008 LIST OF PROVIDED REFERENCES

1. Dresden Emergency Operating Procedure (DEOP) flow charts, with entry conditions blanked out.
2. DOP 1600-02, Torus Water Level Control; Revision 15 3. Dresden Technical Specifications LCO 3.5.1, Emergency Core Cooling Systems (ECCS) and Isolation Condenser (IC) -Operating, with less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Times blanked out; Amendment No. 21 2/204 4. Dresden Technical Specifications LCO 3.3.1.2, SRM Instrumentation, with less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Times blanked out; Amendment No. 185/180 5. Hot Matrix and Cold ShutdownlRefueling Matrix from EP-AA-1004, Radiological Emergency Plan Annex for Dresden Station; Revision 23 6. Dresden Technical Specifications LCO 3.6.4.3, Standby Gas Treatment System, with less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Times blanked out; Amendment No. 221/212 7. DOA 4400-06, 2/3 Cribhouse Screen Plugging 8. Dresden Technical Specifications Bases 3.3.1 .I, RPS Instrumentation