Crystal River 2008 Mid Cycle Performance Review, and Inspection Plan - Report 22
ML082460600
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/02/2008
From: Sykes M D
NRC/RGN-II/DRP/RPB3
To: Young D E
Progress Energy Florida
Shared Package
ML082460598 List:
References
Download: ML082460600 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 September 2, 2008

Mr. Dale E. Young Vice President Crystal River Nuclear Plant (NA1B) 15760 West Power Line Street Crystal River, FL 34428-6708

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - CRYSTAL RIVER NUCLEAR PLANT

Dear Mr. Young:

On August 13, 2008, the NRC staff completed its performance review of Crystal River Nuclear Plant, Unit 3 for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only-Security Related Information" will include the Physical Protection/Security cornerstone performance review and resultant inspection plan.

Plant performance for the most recent quarter at Crystal River Unit 3 was within the Licensee Response column of the NRC

=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. In addition, TI 2515/173, Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative, will be performed at your facility prior to August 30, 2010. In the near term, we will contact you to assess your readiness for this inspection and then finalize our schedule accordingly.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC

=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

FPC 2 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 404-562-4629 with any questions you may have regarding this letter or the inspection plan.

Sincerely, /RA/ Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects

Enclosure:

Crystal River Nuclear Plant Inspection / Activity Plan Docket No. 50-302 License No. DPR-72

_________________________ X SUNSI REVIEW COMPLETE /SON/ OFFICE RII:DRP RII:DRP SIGNATURE SON /RA/ MDS /RA/ NAME SNinh MSykes DATE 08/29/2008 08/29/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FPC 3 cc w/encl:

Brian C. McCabe Manager Nuclear Regulatory Affairs Progress Energy Electronic Mail Distribution Jon A. Franke Director Site Operations Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution R. J. Duncan, II Vice President Nuclear Operations Carolina Power & Light Company Electronic Mail Distribution Michael J. Annacone Plant General Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Phyllis Dixon Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Daniel J. Roderick Vice President Nuclear Projects and Construction Crystal River Nuclear Plant Electronic Mail Distribution David M. Varner Manager Support Services - Nuclear Crystal River Nuclear Plant Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A) Florida Power Corporation Electronic Mail Distribution Steven R. Carr Associate General Counsel Legal Department Progress Energy Service Company, LLC P.O. Box 1551 Raleigh, NC 27602-1551 Senior Resident Inspector Florida Power Corporation Crystal River Nuclear Generating Plant U.S. NRC 6745 N Tallahassee Rd Crystal River, FL 34428

William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050

FPC 4 Letter to Dale E. Young from Marvin D. Sykes dated September 2, 2008

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - CRYSTAL RIVER NUCLEAR PLANT Distribution w/encl:

C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC Farideh E. Saba, NRR Institute of Nuclear Power (INPO)