ML083470022

From kanterella
Revision as of 01:06, 28 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
12/11/2008-Slides, Category 2 Public Meeting Digital Instrumentation and Control Steering Committee
ML083470022
Person / Time
Site: Oconee, Wolf Creek  Duke Energy icon.png
Issue date: 12/11/2008
From:
Research and Test Reactors Licensing Branch
To:
Hardesty, D NRC/NRR/DPR/PRTA 415-3724
Shared Package
ML083470020 List:
References
Download: ML083470022 (11)


Text

Category 2 Public Meeting Digital Instrumentation and Control Steering Committee December 11, 2008 Slide 2DI&C Steering Committee MeetingDecember 11, 2008*Agenda-Opening Remarks-Introductions-Licensing Issues Update-Interim Staff Guidance Update-Project Plan Update-Research-Closing Slide 3DI&C Steering Committee MeetingDecember 11, 2008Licensing Issues UpdateExperience with Reviews*Wolf Creek-Pre-application Meetings and Acceptance Reviews-Working through Challenges-Current Status*Oconee-Pre-application Meetings and Acceptance Reviews

-Working through Challenges-Current Status Slide 4DI&C Steering Committee MeetingDecember 11, 2008 Licensing Issues Update TWG-6*History-Draft ISG Early 2008*Tabulation of Requirements, Documents*Little Information on Applications or Review Process-ISG Development*Enhanced Process-Incorporate Lessons Learned from Reviews*Refine Review / Audit / Inspection Guidance Slide 5DI&C Steering Committee MeetingDecember 11, 2008 Licensing Issues Update TWG-6*Direction-Model ISG-6 After Review Standard for Extended Power Uprates*Focus is on Application and Review*Format for Each Review Area-Scope of Review>>Clarify Licensing Review vs. Inspection-Information to be Provided

-Technical and Regulatory Evaluation Slide 6DI&C Steering Committee MeetingDecember 11, 2008 Licensing Issues Update TWG-6

  • Plans-Provide Draft ISG Covering 3 Topics mid-January 2009*Diversity and Defense-in-Depth
  • Verification and Validation
  • Data Communication-Propose Public Meeting late-January 2009 -Develop Remaining Topics and Discuss in Public Meetings*Propose Monthly Public Meetings-Issue Draft ISG-6 for Public Comment June 2009*Issue Cyber Security Section for Comment August 2009-Finalize ISG-6 September 2009 Slide 7DI&C Steering Committee MeetingDecember 11, 2008 Licensing Issues Update Proposed Workshop On Licensing
  • Understand Perceptions of Regulatory Uncertainty-Hear from Licensees Current ly Going Through Process-Hear from Licensees Considering Modifications-Share NRC Perspectives*Mid-January 2009 Slide 8 Project Plan Update*TWG-1-ISG Issued-Rulemaking and Associated Reg. Guide in Progress-Update Regulatory Documents*TWGs2, 3, 4, 5-ISGsIssued-Clarifications to ISGs*ISG-2: Reference to IEEE-603*ISG-4: Use of Non-Safety ControlsDI&C Steering Committee MeetingDecember 11, 2008 Slide 9DI&C Steering Committee MeetingDecember 11, 2008 Project Plan Update*TWGs2, 3, 4, 5 (cont.)-No Further Guidance at This Time*November 3, 2008, response to NEI White Papers-Update Regulatory Documents*TWG-6-ISG Being Developed*Finalize (w/ Cyber) September 2009-Update Regulatory Documents*TWG-7-ISGsBeing Developed*Finalize April 2009-Update Regulatory Documents Slide 10DI&C Steering Committee MeetingDecember 11, 2008 Research*NRC Research Status
  • EPRI MOU Status*Industry Initiatives Slide 11DI&C Steering Committee MeetingDecember 11, 2008*Review of Actions Items*Closing Remarks
  • Public Comments