Catawba, McGuire, & Oconee Nuclear Station 2019 Annual Assessment Reactor Oversight Process Nuclear Regulatory Commission - Region II ML20134J005

Purpose of Todays Meeting A public forum for discussion of the licensees performance in 2019.

NRC will address performance identified in the 2019 annual assessment letters.

This is a Category 3 meeting; the licensee will NOT be answering questions.

Agenda Introduction Review of Reactor Oversight Process NRC Response to COVID-19 Discussion of Catawba Plant Performance Results Discussion of McGuire Plant Performance Results Discussion of Oconee Plant Performance Results NRC Closing Remarks NRC available to address public questions

NRC Reactor Oversight Process (ROP)

Implemented in each of the four NRC regions Involves inspection and assessment activities controlled by each NRC regions senior management Implemented by regional inspectors and onsite resident NRC inspectors

Significance Threshold Performance Indicators Green: Only Baseline Inspection White: Increases NRC oversight Yellow: Increases NRC oversight Red: Increases NRC oversight Inspection Findings Green: Very low safety or security significance finding White: Low to moderate safety of security significance finding Yellow: Substantial safety or security significance finding Red: High safety or security significance finding

Action Matrix Concept Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

Resident Inspector Program NRC resident inspectors live in the local communities and perform inspection activities at Catawba, McGuire, &

Oconee Nuclear Stations Provide daily oversight of plant activity

NRC Response to COVID-19 Mission Critical Functions Monitoring plant activities through inspections and oversight.

Maintaining emergency response capabilities with Regional Incident Response Centers and Headquarters.

Risk-informing "eyes on" inspections through residents and regional inspections.

NRC Response to COVID-19 Additional Actions Expanded use of telework where appropriate.

Dedicated Continuity of Operations Plan.

Coordinating actions with industry on best practices to minimize impacts.

NRC Annual Assessment Summary CATAWBA NUCLEAR STATION Duke Energy operated the plant safely and in a manner that preserved the public health and safety and protected the environment All findings associated with Catawba Nuclear Station in 2019 were Green

Catawba Nuclear Station Findings and Performance Indicators 12 total violations/findings in 2019:

9 - Green non-cited violations 2 - Severity Level IV Notice of Violations 1 - Green Finding and associated Severity Level IV NCV All Performance Indicators were Green (no performance thresholds exceeded)

NRC Annual Assessment Summary CATAWBA NUCLEAR STATION Catawba Units 1 and 2 remained in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2019 NRC plans to conduct a traditional enforcement follow-up inspection since Catawba had 3 traditional enforcement violations in 2019 NRC plans to conduct routine baseline inspections at the Catawba Nuclear Station for 2020

QUESTIONS NRC Annual Assessment Summary MCGUIRE NUCLEAR STATION Duke Energy operated the plant safely and in a manner that preserved the public health and safety and protected the environment All findings associated with McGuire Nuclear Station in 2019 were Green

McGuire Nuclear Station Findings and Performance Indicators 2 - Green non-cited violations identified in 2019 All Performance Indicators were Green (no performance thresholds exceeded)

NRC Annual Assessment Summary MCGUIRE NUCLEAR STATION McGuire Units 1 and 2 remained in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2019 NRC plans to conduct routine baseline inspections at the McGuire Nuclear Station for 2020

QUESTIONS NRC Annual Assessment Summary OCONEE NUCLEAR STATION Duke Energy operated the plant safely and in a manner that preserved the public health and safety and protected the environment All findings associated with Oconee Nuclear Station in 2019 were Green

Oconee Nuclear Station Findings and Performance Indicators 7 - Green non-cited violations identified in 2019 2 - Traditional Enforcement non-cited violations in 2019 All Performance Indicators were Green (no performance thresholds exceeded)

NRC Annual Assessment Summary OCONEE NUCLEAR STATION Oconee Units 1, 2, and 3 remained in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2019 NRC plans to conduct routine baseline inspections at the Oconee Nuclear Station for 2020

QUESTIONS NRC Social Media Channels Twitter: https://twitter.com/nrcgov Facebook: https://www.facebook.com/nrcgov/

YouTube: https://www.youtube.com/user/NRCgov Flickr: https://www.flickr.com/photos/nrcgov/sets LinkedIn: https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/

GovDelivery: https://service.govdelivery.com/accounts/USNRC/subscriber/new

Getting in Touch with the NRC Website - www.nrc.gov Questions/Information - OPA2.Resource@nrc.gov or 404-997-4417 Allegations 800-695-7403 Employment - 301-415-7400 or www.usajobs.gov

Getting in Touch with the NRC Contact Catawba NRC resident inspectors Phone (404) 997-5130 Phone (404) 997-5131 Contact McGuire NRC resident inspectors Phone (404) 997-5171 Phone (404) 997-5173 Contact Oconee NRC resident inspectors Phone (404) 997-5211 Phone (404) 997-5213 Phone (404) 997-5214

Annual Assessment Meeting Feedback

1. Scan the QR OR 2. Through any computer by Code with smart device going to the Public Meeting Schedule and pressing the Meeting Feedback link for this meeting, or pressing the

[more] link for this meeting and then pressing the Meeting Feedback link on the Meeting Details page.

Meeting code: 20200480

QUESTIONS