Other: CNL-15-039, Severe Accident Management Alternatives for Reactor Coolant Pump Seals, ML090360589, ML093630039, ML100120107, ML100210350, ML100630115, ML100630139, ML100630140, ML100630146, ML100630155, ML100630167, ML100630169, ML100630170, ML100630171, ML100630173, ML100630174, ML100630175, ML100630176, ML100630177, ML100630178, ML100630192, ML100630193, ML100630194, ML100630234, ML100630235, ML100630263, ML100630264, ML101130395, ML101130397, ML101130398, ML101130399, ML101130401, ML101130403, ML101130404, ML101130405, ML101130407, ML101130408, ML101130409, ML101170096, ML101390048, ML103080030, ML110871475, ML110890472, ML11264A052, ML11294A461, ML11329A001, ML12166A068, ML12296A227, ML13150A376, ML13150A379
|
MONTHYEARML1011304092004-05-15015 May 2004 Drawing, Distribution of Tritium Concentration in Groundwater at Power Block, March 2004, Attachment K Project stage: Other ML1011304082004-05-15015 May 2004 Drawing, Distribution of Tritium Concentrations in Groundwater, March 2004, Attachment J Project stage: Other ML1011304072004-05-15015 May 2004 Drawing, Water Table at Power Block, March 2004, Attachment I Project stage: Other ML1011304052004-05-15015 May 2004 Drawing, Water Table, Attachment H Project stage: Other ML1011304042004-05-15015 May 2004 Drawing, Hydrogeologic Cross-Section D-D, Attachment G Project stage: Other ML1011304032004-05-15015 May 2004 Drawing, Hydrogeologic Cross-Section C-C, Attachment F Project stage: Other ML1011304012004-05-15015 May 2004 Drawing, Hydrogeologic Cross-Section B-B, Attachment E Project stage: Other ML1011303992004-05-15015 May 2004 Drawing, Hydrogeologic Cross-Section A-A, Attachment D Project stage: Other ML1011303982004-08-10010 August 2004 Map, Bedrock Contours, Attachment C Project stage: Other ML1011700962004-08-12012 August 2004 Groundwater Investigation Report Project stage: Other ML1011303972004-08-12012 August 2004 Block Site Map, Plate B Project stage: Other ML1011303952004-08-12012 August 2004 Site Map. Attachment a Project stage: Other ML0814300282008-05-14014 May 2008 Transmittal of Annual Radiological Environmental Operating Report of 2007 Project stage: Request ML0812102702008-06-0303 June 2008 Request for Supplemental Information to Support Acceptance Review of Final Supplemental Environmental Impact Statement Project stage: Acceptance Review ML0818504602008-07-0202 July 2008 Final Supplemental Environmental Impact Statement - Request for Additional Information Project stage: Supplement ML1006301392008-12-12012 December 2008 WB-DC-20-20, Revision 0009, Traveling Water Screens and Trashracks, Project stage: Other ML0903605892009-01-21021 January 2009 Enclosure 1 - Watts Bar, Unit 2 Severe Accident Management Alternatives Analysis Project stage: Other ML0903605882009-01-27027 January 2009 Final Supplemental Environmental Impact Statement - Severe Accident Management Alternatives Project stage: Supplement ML1006302632009-11-0707 November 2009 Map - Final Map of the Watts Bar Nuclear Plant Project stage: Other ML1006302642009-11-0707 November 2009 Map of the Wetlands Streams Project stage: Other ML0922300242009-11-30030 November 2009 Watts, Unit 2, RAI, Regarding Severe Accident Management Alternatives Project stage: RAI ML0932900732009-12-0303 December 2009 Environmental RAI Enclosure Project stage: RAI ML0930301482009-12-0303 December 2009 RAI, Regarding Environmental Review Project stage: RAI ML1001201072009-12-14014 December 2009 December 14, 2009, TVA Letter Additional Information Regarding Environmental Review - Cultural Resources Project stage: Other ML0936300392009-12-22022 December 2009 Severe Accident Management Alternatives Additional Information Project stage: Other ML1002103502009-12-23023 December 2009 Submittal of Additional Information Regarding Environmental Review Project stage: Other ML1006301672010-01-15015 January 2010 Intact Containment Loss of Coolant Accident (LOCA) Analysis Project stage: Other ML1006302332010-01-26026 January 2010 Response to Tennessee Valley Authority Request for Plant Water Flow Information Project stage: Request ML1006302342010-02-25025 February 2010 Annual Estimates 2008 - Average Net Megawatts = 1180 Mwe, Non-Outage O&M Project stage: Other ML1006301702010-02-25025 February 2010 Drawing, Plot: 5047CL Sequoyah-Watts Bar HP Project stage: Other ML1006301692010-02-25025 February 2010 Drawing, Plot: 6059KX Bull Run Project stage: Other ML1006301462010-02-25025 February 2010 Plant Withdrawals Impacts, Water Supplied by Sccw Intake/Average Velocity for Expect No. of Bays in Service Project stage: Other ML1006301152010-02-25025 February 2010 Additional Information Regarding Environmental Review Project stage: Other ML1006301732010-02-25025 February 2010 Drawing, Plot: 5127CL Watts Bar HP-Watts Bar 1 Project stage: Other ML1006301402010-02-25025 February 2010 Plant Withdrawal Impacts, Water Supplied by Intake Pumping Station (Ips)/Average Velocity for All Openings Project stage: Other ML1006302352010-02-25025 February 2010 Yard Holding Pond Wsel Graph Overflow for 2001 Project stage: Other ML1006301712010-02-25025 February 2010 Drawing, Plot: 5173KX Watts Bar HP-Great Falls Project stage: Other ML1006301942010-02-25025 February 2010 Drawing, Plot: 5167GF Winchester-Watts Bar FP Project stage: Other ML1006301932010-02-25025 February 2010 Drawing, Plot: 6092KX Watts Bar-Volunteer Project stage: Other ML1006301922010-02-25025 February 2010 Drawing, Plot: 6084KX Watts Bar NP-Roane Project stage: Other ML1006301782010-02-25025 February 2010 Drawing, Plot: 5645 Cl Watts Bar-Athens Project stage: Other ML1006301552010-02-25025 February 2010 Operating Conditions for Intake Pumping Station, Table 1 Project stage: Other ML1006301772010-02-25025 February 2010 Plot: 608 1CL Watts Bar NP-Sequoyah Np 2 Project stage: Other ML1006301762010-02-25025 February 2010 Plot: 6080CL Watts Bar HP-Sequoyah 1 Project stage: Other ML1006301752010-02-25025 February 2010 Drawing, Plot: 5733KX Watts Bar HP-Spring City Project stage: Other ML1006301742010-02-25025 February 2010 Drawing, Plot: 5791KX Watts Bar HP-Rockwood Project stage: Other ML1011303932010-04-0909 April 2010 Response to U.S. Nuclear Regulatory Commission (NRC) Request for Additional Information Regarding Environmental Review Project stage: Request ML1013900482010-04-22022 April 2010 Additional Information Regarding Environmental Review- Cultural Resources (Tac No. MD8203) Project stage: Other ML1013405892010-05-12012 May 2010 Response to Request for Additional Information Regarding Environmental Review Project stage: Response to RAI ML1013701862010-05-14014 May 2010 OL - FW: Call Summary - TVA Clarification Call Project stage: Request 2009-11-07
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24274A2762024-09-24024 September 2024 Email from K.Green to S.Hughes, Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, Hydrologic LAR to Revise the UFSAR ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 2024-09-24
[Table view] |
Text
1 WBN2Public Resource From: Beissel, Dennis Sent: Friday, May 14, 2010 10:21 AM To: WBN2HearingFile Resource
Subject:
FW: Call summary - TVA clarification call Attachments:
Call Record WBN_call summary March 12 2010.doc From: Stegen, Amanda [1]
Sent: Thursday, May 13, 2010 7:44 PM To: Beissel, Dennis; Logan, Dennis; Wiebe, Joel; Imboden, Andy
Subject:
Call summary - TVA clarification call AttachedisthePNNLcallsummaryforthecallNRC/PNNLhadwithTVAonMay12,2010.Pleaseletmeknowifyouhaveanyquestions.PleasenotethatTVAhadseveralactionitemsthatcameoutofthecall.Thanks,Amanda Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 18 Mail Envelope Properties (87B1F1BDFE5A554CA9DC5EAA75EB6D0D1CF90711A4)
Subject:
FW: Call summary - TVA clarification call Sent Date: 5/14/2010 10:20:33 AM Received Date: 5/14/2010 10:20:36 AM From: Beissel, Dennis Created By: Dennis.Beissel@nrc.gov Recipients: "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None
Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 466 5/14/2010 10:20:36 AM Call Record WBN_call summary March 12 2010.doc 101442 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
Phone/Conference Call Record Project/Plant: Watts Bar Nuclear Unit 2
Call title/subject: TVA RAI Clarification Call Purpose of call: To clarify several of the TVA RAI responses from February 25 and April 9 2010
Submittals Date: 5/12/10
Attendees:
PNNL Bob Bryce Eva Hickey Rick Traub Amanda Stegen Van Ramsdell
NRC Dennis Logan
Dennis Beissel
TVA Jerri Phillips Gordon Arent
Eddie Woods
Dennis Baxter Bo Baxter Call notes:
Land Use - Amanda Stegen PNNL requested clarification on total acreage for WBN site - there are inconsistencies with data provided in the February 25, 2010 RAI responses (1055 acres) and the value in the ER (1700 acres).
TVA response (Gordon Arent): The 1055 acres is specifically related to Watts Bar Nuclear and just a portion of the Watts bar reservation. He explained that the 1700 acres encompasses the Watts Bar Dam and Hydro-Electric Plant, the Watts Bar Steam Plant, the TVA Central Maintenance Facility, and the Watts Bar
Resort Area.
This issue is considered resolved.
Aquatic Ecology - Becky Krieg/Dennis Logan We need to be able to access the entire report on Preoperational Assessment - 1986. As we discussed previously on the phone, TVA only provided the document through page 302, and the appendices in Volume II. We are missing from page 302-484-plus
from Volume 1.
o TVA 1986. Preoperational Assessment of Water Quality and Biological Resources of Chickamauga Reservoir, Watts Bar Nuclear Plant 1973-1985. Office of Natural Resources and Economic Development - Division of Air and Water Resources.
TVA Response (Dennis Baxter): TVA is scanning the entire 1986 document and submitting to NRC. - TVA Action Item Clarification on AE specifically when we are talking monitoring sites is that the same as "beds". If it is then does the TRM 526-527 site really extend further upstream or is that just a small grouping of mussels at 592.2 R? And are these the ones you relocated across the river? Which ones were relocated to the boulder study area described in AE-
7? TVA Response (Dennis Baxter)
- There is a 1994 report that has the mussel sampling stations AND the mussel beds in a figure.
The mussels from 529.2 (SCCW discharge location) were not considered part of the bed that is downstream of the SCCW discharge. These mussels were moved across the river to the mussel bed by the boat launch. Although the freshwater mussels do tend to congregate in beds, there are a few that are distributed between the beds and these were the types of mussels that were relocated.
The mussels that were placed in the boulder field as an experiment to see if cutting the flow of water would improve their survival, were randomly selected from mussel beds downstream. They are located near the 528 RM marker and almost directly across from the 528.9 boat ramp, mid-channel. They have not been checked since placement but they are being checked June 2010 during a mussel survey.
TVA will submit the figure with the sampling locations and mussel bed locations
to NRC. - TVA Action Item
Please clarify why did TVA did not provide an update of TVA 1998 Aquatic Environmental Conditions in the Vicinity of Watts Bar nuclear plant, specifically sections on the entrainment sampling that we discussed in a phone call in late January.
TVA response: TVA is still reviewing the changes to TVA 1998 (Aquatic Environmental Conditions in the Vicinity of Watts Bar Nuclear Plant During Two Years of Operation, 1996-1997) and will send it to NRC, once it has been approved. The changes to the report have been completed and the entrainment numbers recalculated based on the original data. The numbers show low levels
of entrainment for the IPS. -
TVA Action Item Hydrology - Bob Bryce/Dennis Beissel TVA Response to H-10. Clarification of the Surface Water Chemical Analysis.
TVA response (Jerry Phillips/Bo Baxter/Dennis Baxter/Gordon Arent):
TVA will be providing clarification on the analytical results for the surface water sample that was performed September 2009. Was the sample analyzed for trace metals and were they not reported because they were below detection -
TVA Action Item TVA Response to H-6. Verification of the withdrawal rate from the French Drain TVA response (Eddie Woods): Eddie explained that the approximately 70 gpm reported by Arcadis is flowing specifically from the French Drain and the 500 gpm reported by TVA is pumped from the sump and includes the water from the French Drain. The water from the sump is pumped into the yard holding pond.
This issue is resolved.
TVA Response to H-11. Clarification of information regarding through screen velocity for the intake TVA response (Dennis Baxter/Gordon Arent): TVA will be providing verification of the flow through velocities provided in the response. - TVA Action Item
Design Basin Accidents - Van Ramsdell TVA personnel that can provide information on the status of the accident analysis (it appears some accident scenarios were not analyzed) as well as the assumptions that went into the analysis.
TVA response (Frank Coonz?/Gordon Aren't): TVA will be providing status of the accidents analysis. - TVA Action Item RAD- Eva Hickey/Rick Traub TVA personnel that have an understanding of the TVA RAIs responses (related to Rad).
TVA personnel that can clarify information related to the dilution factor for the release from the plant to the river for the liquid effluents
TVA response (Eddie Woods): The dilution factors were calculated by dividing the cooling tower blowdown (20,000 gpm- 44.6 cfs)) (see Fig 3-7 of the submittal) by the effluent flow rate (can vary from less than 100 gpm to 290 gpm - 13.4 cfs to 38.8 cfs).
All fishing is assumed to be sport fishing.
There is only one terrain adjustment factor for each sector.
This issue is considered resolved.