From: Kimberly Green Sent: Thursday, February 1, 2024 4:07 PM To: Hughes, Shawna Marie Cc: Wells, Russell Douglas; David Wrona
Subject:
CORRECTION: Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 regarding Degraded Barriers (EPID L-2024-LLA-0003)
Dear Ms. Hughes:
Please note the correction to completion date below. The correction is identified in bolded, red text. I apologize for this error.
By letter dated January 9, 2024 (Agencywide Documents Access and Management System Accession No. ML24009A170), Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for the Watts Bar Nuclear Plant (Watts Bar), Units 1 and 2. The proposed amendments would revise Watts Bar Technical Specifications by adopting Technical Specification Task Force (TSTF) Standard Technical Specification change, TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System OPERABILITY.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the proposed LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of applications regarding the technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed TVAs LAR and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendments in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compare d to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in TVAs LAR, the NRC staff has estimated that this licensing request will take approximately 76 hours8.796296e-4 days <br />0.0211 hours <br />1.256614e-4 weeks <br />2.8918e-5 months <br /> to complete and that the review can be completed by August 1, 2024. These estimates are based on the staffs initial review of the application. If there are emergent challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates will be communicated, during the routine interactions.
If you have any questions, please contact me at (301) 415-1627.
Sincerely, Kimberly Green, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Hearing Identifier: NRR_DRMA Email Number: 2387
Mail Envelope Properties (DM6PR09MB5462ED188C632ED3FDC482778F432)
Subject:
CORRECTION Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 regarding Degraded Barriers (EPID L-2024-LLA-0003)
Sent Date: 2/1/2024 4:06:52 PM Received Date: 2/1/2024 4:06:00 PM From: Kimberly Green
Created By: Kimberly.Green@nrc.gov
Recipients:
"Wells, Russell Douglas" <rdwells0@tva.gov>
Tracking Status: None "David Wrona" <David.Wrona@nrc.gov>
Tracking Status: None "Hughes, Shawna Marie" <smhughes@tva.gov>
Tracking Status: None
Post Office: DM6PR09MB5462.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 3346 2/1/2024 4:06:00 PM
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: