Letter Sequence RAI |
---|
TAC:ME3589, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME3590, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement
|
MONTHYEARML1008503912010-03-18018 March 2010 GE-Hitachi Nuclear Energy Americas, LLC Affidavit Requesting That GEH Proprietary Report, NEDC-33484P Be Withheld from Public Disclosure Project stage: Request ML1008503922010-03-19019 March 2010 Application for Withholding Proprietary Information from Public Disclosure Project stage: Request RS-10-002, Request for License Amendment Re Measurement Uncertainty Recapture Power Uprate2010-03-25025 March 2010 Request for License Amendment Re Measurement Uncertainty Recapture Power Uprate Project stage: Request ML1008504032010-03-31031 March 2010 NEDO-33484, Rev. 0, Safety Analysis Report for Limerick Generating Station Units 1 & 2 Thermal Power Optimization Project stage: Request ML1010310792010-04-19019 April 2010 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review RS-10-085, Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate2010-04-26026 April 2010 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Supplement ML1012409982010-05-0606 May 2010 Acceptance of Requested Licensing Action Measurement Uncertainty Recapture Power Uprate Request and Standby Liquid Control System Modification Project stage: Acceptance Review ML1013303752010-05-24024 May 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1014700892010-06-0303 June 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1015802912010-06-0707 June 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1015906292010-06-15015 June 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1016804402010-06-21021 June 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1015803382010-06-25025 June 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1016901212010-07-0202 July 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1018800202010-07-0808 July 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1019400532010-07-15015 July 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1018700242010-07-15015 July 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1018700082010-07-15015 July 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI RS-10-116, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-07-22022 July 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-10-127, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-07-28028 July 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-10-129, Schedule for Responding to Request for Additional Information2010-07-28028 July 2010 Schedule for Responding to Request for Additional Information Project stage: Request RS-10-126, Additional Information and Supplement Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-08-10010 August 2010 Additional Information and Supplement Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Supplement RS-10-132, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-08-12012 August 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-10-133, Limerick, Units 1 and 2 - Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-08-12012 August 2010 Limerick, Units 1 and 2 - Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-10-144, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-08-30030 August 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request ML1024402642010-08-31031 August 2010 0000-0114-0580-RO-NP, Rev. 0, Limerick Generating Station, Units 1 & 2, Upper Shelf Energy Evaluation for LPCI Nozzle Forging Material Project stage: Request ML1028005382010-10-19019 October 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance RS-10-212, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-12-17017 December 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-11-003, Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate2011-01-0707 January 2011 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Supplement ML1100606332011-01-18018 January 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1106910952011-04-0808 April 2011 Issuance of Amendments 201 & 163 Measurement Uncertainty Recapture Power Uprate and Standby Liquid Control System Changes Project stage: Approval ML1110400892011-04-20020 April 2011 Correction Letter for Limerick Generating Station, Units 1 and 2 - Safety Evaluation Regarding Measurement Uncertainty Recapture Power Uprate and Standby Liquid Control System Changes Project stage: Approval 2010-06-03
[Table View] |
|
---|
Category:Letter
MONTHYEARML24318A9432024-11-13013 November 2024 – Notification of Conduct of Phase II Inspection of Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactor ML24310A0062024-11-0808 November 2024 – Acceptance of Requested Licensing Action Modification to Technical Specifications 3.6.1.2 and Main Stem Isolation Valve Leakage Requirements Amendment IR 05000352/20240032024-11-0808 November 2024 Integrated Inspection Report 05000352/2024003 and 05000353/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24079A2922024-03-21021 March 2024 Draft Request for Additional Information Regarding Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML23276B4642023-10-0303 October 2023 NRR E-mail Capture - NRC Request for Additional Information Limerick TSTF-477 LAR ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 ML23208A1942023-07-27027 July 2023 NRR E-mail Capture - Limerick Generating Station - Audit Plan for TSTF-477 LAR Review (L-2022-LLA-0174) ML23202A0682023-07-21021 July 2023 NRR E-mail Capture - NRC Request for Additional Information Re. TSTF-477 LAR ML23201A1262023-07-18018 July 2023 Additional RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23173A0632023-06-20020 June 2023 RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML22320A1132022-11-21021 November 2022 Generation Station, Units 1 and 2 - Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests ML22172A0752022-06-17017 June 2022 Response: Review and Feedback on Draft Limerick Digital License Amendment Request (L-2020-LRM-0041) ML22136A0032022-05-13013 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Limerick License Amendment Request (L-2021-LLA-0042) ML22124A2862022-05-0404 May 2022 Information Needed to Provide Substantive Feedback on Human Factors Engineering Supporting the Planned Limerick Digital I&C License Amendment Request ML22103A2542022-04-19019 April 2022 Draft Request for Additional Information ML22089A1172022-03-30030 March 2022 Additional Comments and Questions on Constellations March 31st Presentation ML22045A4822022-02-14014 February 2022 Notification of Conduct of a Fire Protection Team Inspection ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21048A3402021-02-11011 February 2021 Request for Information for Relief Request I4R-24 Associated with Residual Heat Removal Heat Exchanger Category C-A and C-B Examinations ML21015A1852021-01-15015 January 2021 Temporary Instruction 2515/194 Inspection Documentation Request ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20156A2992020-06-0404 June 2020 RAI for RR to Use Inservice Testing Program Safety Relief Valve Testing ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20149K7012020-05-28028 May 2020 Request for Additional Information for License Amendment Request to Use Inservice Testing Program Safety Relief Valve Testing ML20098C4342020-04-0606 April 2020 Draft Request for Additional Information - Limerick Generating Station, Unit 1 - Emergency LAR to Increase Allowable MSIV Leakage ML19344A0332019-12-10010 December 2019 Request for Additional Information License Amendment Request to Adopt TSTF-505, Revision 2 Risk Informed Completion Times Exelon Generation Company Limerick Generating Station, Units 1 and 2 Docket Nos. 50-352 and 50-353 ML19344A0242019-12-0909 December 2019 Request for Additional Information (RAI) - Limerick Units 1 and 2: TSTF-505, Use of Risk Informed Completion Times (Ricts) for Actions to Be Taken When Limiting Conditions for Operation (Lcos) Are Not Met ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19192A0312019-07-10010 July 2019 NRR E-mail Capture - LIMERICK-REQUEST for Additional Information: Risk Informed Completion Times TSTF-505, Revison 2, Provide RISK-INFORMED Completion Times - RITSTF Initiative 4B ML19168A0882019-06-17017 June 2019 Letter to R. W. Libra Alternative Request Pertaining to Dry Shielded Canisters Equipped with Boral Neutron Absorber Plates - Supplemental Information Needed (W/Enclosursi) ML18276A0202018-10-0202 October 2018 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan for Limerick and Peach Bottom ML18081B0682018-03-26026 March 2018 Second Round RAI for Limerick, 10 CFR 50.69 ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17354A0182017-12-19019 December 2017 E-mail Request for Information (Rai): Relief Request I3R-23 Regarding Limited Examination Coverage ML18040A9212017-11-0707 November 2017 Attachment - Limerick Generating Station, Units 1 and 2, Request for Additional Information Application to Revise TSs to Adopt TSTF-542, Revision 2 ML17207A0772017-07-31031 July 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Adoption of Title 10 of the Code of Federal Regulations Section 50.69 ML17137A1652017-05-16016 May 2017 Request for Additional Information for Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML17018A1932016-12-0909 December 2016 NRR E-mail Capture - (External_Sender) Limerick Flood MSA Question ML16221A6712016-08-0808 August 2016 Draft Request for Additional Information ML16221A6122016-08-0808 August 2016 Draft Request for Additional Information ML16174A2982016-06-22022 June 2016 Draft Request for Additional Information 2024-07-15
[Table view] |
Text
I'EG UNITED STATES 01' NUCLEAR REGULATORY
!:J .L ... WASHINGTON, D.C. 20555-0001
<[ 0 .... ;c <Jl 't";; June 3, 2010 ****-l<Mr. Charles President and Chief Nuclear Exelon 4300 Winfield Warrenville, IL LIMERICK GENERATING STATION, UNIT NOS. 1 AND 2 -
REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NOS.
ME3589 AND ME3590)
Dear Mr. Pardee:
By letter dated March 25, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 100850380), Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) proposing to revise the operating license and technical specifications for Limerick Generating Station (LGS), Units 1 and 2. This LAR proposes to implement an increase of approximately 1.65% in rated thermal power from the current licensed thermal power limit of 3458 megawatts thermal. The Nuclear Regulatory Commission staff has been reviewing the response and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on May 13, 2010, to Mr. Kevin Borton, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed.
The draft questions were discussed in a teleconference with your staff on May 26, 2010, and several minor wording changes were made to make portions of the RAI more understandable. It was agreed that a response to this RAI would be submitted by June 30, 2010. Please contact me at 301-415-2833, if you have any questions.
Sincerely, Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 As cc w/encl:
Distribution via Listserv UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 REQUEST FOR ADDITIONAL INFORMATION LIMERICK GENERATING STATION, UNITS 1 AND 2 MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE REQUEST DOCKET NOS. 50-352 AND 50-353 By letter dated March 25, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 100850380), Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) proposing to revise the operating license and technical specifications for Limerick Generating Station (LGS), Units 1 and 2. This LAR proposes to implement an increase of approximately 1.65% in rated thermal power from the current licensed thermal power limit of 3458 megawatts thermal. The increase would be based on the improved flow measurement accuracy which would be achieved through the utilization of ultrasonic feedwater flow meters. The Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review. Attached to the March 25, 2010, letter was a report by General Electric (GE)-Hitachi Nuclear Energy, NEDC-33484P, titled "Safety Analysis Report for Limerick Generating Station Units 1 and 2 Thermal Power Optimization," Revision 0, dated March 2010. A non-proprietary version of this report (NEDO-33484, same title) is available at ADAMS Accession No. ML 100850403. Section 3.4, "Flow Induced Vibration," of NEDC-33484P and NEDO-33484, notes, in part, that main steam (MS) and feedwater (FW) piping will experience about a 4%
increase in vibration levels due to increased flow velocities for Thermal Power Optimization (TPO) uprate conditions, and asserts that: "...the MS and FW lines vibration will remain within acceptable limits during TPO." The reports do not document the implementation of a vibration surveillance program during TPO to confirm this assertion. In the application dated March 25, 2010, Exelon states that the effects of the uprate request have been evaluated using an approach developed by GE-Hitachi and documented in 32938P-A, "Licensing Topical Report I Generic Guidelines and Evaluations for General Electric Boiling Water Reactor Thermal Power Optimization," Revision 2, May 2003. A non-proprietary version of this report (NEDO-32938, same title) is available at ADAMS Accession No. ML023170607.
Appendix K, "Methods and Assumptions for Piping Evaluation of TPO Uprate," of NEDC-32938P-A and NEDO-32938 notes, in part, that: "[f]or plants whose licensing basis
-2includes the results of main steam line and/or FW line vibration measurements taken during startup testing, the effects of power uprate on vibratory displacements will also be included." Further, the NRC staff notes that Table 3.9-7, "Non-NSSS
[nuclear steam supply system] Piping Systems Power Ascension Testing," of the LGS Updated Final Safety Analysis Report documents both dynamic transient and steady-state vibration tests for the MS and FW piping systems during plant startup. Please indicate how the assessment of the effects of power uprate on the vibratory displacements of the MS and FW lines has been performed and if the predicted vibratory displacements will be validated after the new TPO full power level is reached. If validation after startup is not planned, please discuss why it is not needed.
RAI2 Section 3.5.2, "Balance-of-Plant Piping Evaluation," of NEDC-33484P and NEDO-33484 notes, in part, that "[f]or the MS system piping outside containment, the turbine stop valve (TSV) closure transient was reviewed against conditions that bound operations under TPO." Please indicate how the TSV closure transient has been reviewed for the TPO, and if this review considered the results of any testing of the TSV closure transient conducted during ortqtnal plant startup. Section 6.7, of NEDC-33484P and NEDO-33484, "Fire Protection," states that "...There is no change in the physical plant configuration and the potential for minor changes to combustible loading as result of TPO uprate... " The staff requests the licensee to summarize any changes to the combustible loading, however minor, and discuss the impact of these changes on the plant's compliance with the fire protection program licensing basis, Title 10 of the Code of Federal Regulations Part 50 (10 CFR 50.48), or applicable portions of 10 CFR 50, Appendix R. RAI4 Section 6.7, of NEDC-33484P and NEDO-33484, "Fire Protection," states that "...the fire shutdown analysis includes consideration of equipment needed to achieve and maintain hot shutdown, fire barriers, operator manual actions, personnel resources, and repair activities credited to achieve and maintain cold shutdown ... " The staff requests the licensee to verify that (1) the measurement uncertainty recapture (MUR) power uprate will not require any new operator actions; (2) any effects from additional heat in the plant environment from the increased power will not prevent required post fire operator manual actions, as identified in the LGS, Units 1 and 2, fire protection program, from being performed at and within their designated time; and (3) procedures and resources necessary for systems required to achieve and maintain shutdown will not change and are adequate for the MUR power uprate. Some plants credit aspects of their fire protection system for other than fire protection activities (e. g., utilizing the fire water pumps and water supply as backup cooling or inventory for primary reactor systems). If LGS, Units 1 and 2, credit the fire protection system in this way, the MUR power uprate LAR should identify the specific situations and discuss to what extent, if any, the MUR power uprate affects these "non-fire-protection" aspects of the plant fire protection system. If LGS, Units 1 and 2, do not take such credit, the staff requests that the licensee verify this as well.
June 3,2010 Mr. Charles Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 LIMERICK GENERATING STATION, UNIT NOS. 1 AND 2 -
REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NOS.
ME3589 AND ME3590)
Dear Mr. Pardee:
By letter dated March 25, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 100850380), Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) proposing to revise the operating license and technical specifications for Limerick Generating Station (LGS), Units 1 and 2. This LAR proposes to implement an increase of approximately 1.65% in rated thermal power from the current licensed thermal power limit of 3458 megawatts thermal. The Nuclear Regulatory Commission staff has been reviewing the response and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on May 13, 2010, to Mr. Kevin Borton, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed.
The draft questions were discussed in a teleconference with your staff on May 26, 2010, and several minor wording changes were made to make portions of the RAI more understandable. It was agreed that a response to this RAI would be submitted by June 30, 2010.
Please contact me at 301-415-2833, if you have any questions.
Sincerely, /raJ Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353
Enclosure:
As stated cc w/encl:
Distribution via Listserv DISTRIBUTION:
PUBLIC RidsOgcRp Resource LPLI-2 RtF RidsAcrsAcnw_MailCTR Resource RidsNrrDssEmcb Resource AduBouchet, NRR RidsRgn1 MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resouce RidsNrrPMLimerick Resource RidsNrrLAABaxter Resource Nlqbal, NRR RidsNrrDraAfpb Resource ADAMS Accession Number' ML101470089
- concurrence via memo OFFICE LPLI-2tPM LPLI-2/LA EMCB/BC AFPB/BC LPL1-2/BC NAME PBamford ABaxter MKhanna* AKlein* HChernoff (w/comment)
DATE 5127/10 6/1110 04/16/2010 05/12/10 613/10 OFFICIAL RECORD COPY