Letter Sequence Approval |
|---|
TAC:ME3589, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME3590, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME3591, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME3592, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement
|
MONTHYEARML1008503912010-03-18018 March 2010 GE-Hitachi Nuclear Energy Americas, LLC Affidavit Requesting That GEH Proprietary Report, NEDC-33484P Be Withheld from Public Disclosure Project stage: Request ML1008503922010-03-19019 March 2010 Application for Withholding Proprietary Information from Public Disclosure Project stage: Request ML1008503952010-03-25025 March 2010 Markup of Proposed Operating License, Technical Specifications & Updated Final Safety Analysis Report Pages Project stage: Request RS-10-002, Request for License Amendment Re Measurement Uncertainty Recapture Power Uprate2010-03-25025 March 2010 Request for License Amendment Re Measurement Uncertainty Recapture Power Uprate Project stage: Request ML1008504032010-03-31031 March 2010 NEDO-33484, Rev. 0, Safety Analysis Report for Limerick Generating Station Units 1 & 2 Thermal Power Optimization Project stage: Request ML1010310792010-04-19019 April 2010 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review RS-10-085, Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate2010-04-26026 April 2010 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Supplement ML1012409982010-05-0606 May 2010 Acceptance of Requested Licensing Action Measurement Uncertainty Recapture Power Uprate Request and Standby Liquid Control System Modification Project stage: Acceptance Review ML1013303752010-05-24024 May 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1014700892010-06-0303 June 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1015802912010-06-0707 June 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1015906292010-06-15015 June 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1016804402010-06-21021 June 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1015803382010-06-25025 June 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1016901212010-07-0202 July 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1018800202010-07-0808 July 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1018700082010-07-15015 July 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1018700242010-07-15015 July 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1019400532010-07-15015 July 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI RS-10-116, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-07-22022 July 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-10-129, Schedule for Responding to Request for Additional Information2010-07-28028 July 2010 Schedule for Responding to Request for Additional Information Project stage: Request RS-10-127, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-07-28028 July 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request ML1021400802010-07-28028 July 2010 Company, LLC (Egc), Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations Project stage: Request RS-10-126, Additional Information and Supplement Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-08-10010 August 2010 Additional Information and Supplement Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Supplement RS-10-132, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-08-12012 August 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-10-133, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-08-12012 August 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-10-144, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-08-30030 August 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request ML1024402642010-08-31031 August 2010 0000-0114-0580-RO-NP, Rev. 0, Limerick Generating Station, Units 1 & 2, Upper Shelf Energy Evaluation for LPCI Nozzle Forging Material Project stage: Request ML1028005382010-10-19019 October 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance RS-10-212, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-12-17017 December 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-11-003, Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate2011-01-0707 January 2011 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Supplement ML1100606332011-01-18018 January 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1106910952011-04-0808 April 2011 Issuance of Amendments 201 & 163 Measurement Uncertainty Recapture Power Uprate and Standby Liquid Control System Changes Project stage: Approval ML1110400892011-04-20020 April 2011 Correction Letter for Limerick Generating Station, Units 1 and 2 - Safety Evaluation Regarding Measurement Uncertainty Recapture Power Uprate and Standby Liquid Control System Changes Project stage: Approval 2010-06-03
[Table View] |
Text
~"R REGII(
UNITED STATES
~(,"
"1~
",0i1' ~
O~.L NUCLEAR REGULATORY COMMISSION f!!
c>
WASHINGTON, D.C. 20555-0001 0
'Oi
~
(;j April 20, 2011
~
.f.J
~I;I
,..0
- i' Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUB..IECT:
CORRECTION LETTER FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 - SAFETY EVALUATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE AND STANDBY LIQUID CONTROL SYSTEM CHANGES (TAC NOS. ME3589, ME3590, ME3591, AND ME3592)
Dear Mr. Pacilio:
By letter dated April 8, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110691095), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 201 to Facility Operating License No. NPF-39 and Amendment No. 163 to Facility Operating License No. NPF-85 for Limerick Generating Station (LGS), Units 1 and 2, respectively. The safety evaluation enclosed with the amendments contains two errors that are being acknowledged and corrected by this letter.
First, on page 30 of the safety evaluation, the first paragraph, second sentence, starts with "As noted in Section 2.2.2 above... " This reference to Section 2.2.2 of the safety evaluation should have been to Section 3.9.2. Second, on page 40 of the safety evaluation, the last full paragraph states that "Installation locations are downstream of the flow straighteners and upstream of the existing feedwater flow nozzle." This is true only for the installation locations of the new Leading Edge Flow Meters (LEFMs) in Loops "B" and "C" for each unit. The loop "A" LEFM location is upstream of both the flow straightener and the feedwater flow nozzle for each unit. The correct location is acknowledged elsewhere in the safety evaluation, specifically earlier on page 40, in the first bulleted paragraph on that page, as well as on page 21, Section 3.7.2. Neither of these errors has any bearing on the NRC staff's technical evaluation or conclusions.
Please contact me at 301-415-2833 if you have any questions.
Sincerely, Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 cc: Distribution via Listserv
April 20,2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CORRECTION LETTER FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 - SAFETY EVALUATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE AND STANDBY LIQUID CONTROL SYSTEM CHANGES (TAC NOS. ME3589, ME3590, ME3591, AND ME3592)
Dear Mr. Pacilio:
By letter dated April 8, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110691095), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 201 to Facility Operating License No. NPF-39 and Amendment No. 163 to Facility Operating License No. NPF-85 for Limerick Generating Station (LGS), Units 1 and 2, respectively. The safety evaluation enclosed with the amendments contains two errors that are being acknowledged and corrected by this letter.
First, on page 30 of the safety evaluation, the first paragraph, second sentence, starts with "As noted in Section 2.2.2 above... " This reference to Section 2.2.2 of the safety evaluation should have been to Section 3.9.2. Second, on page 40 of the safety evaluation, the last full paragraph states that "Installation locations are downstream of the flow straighteners and upstream of the existing feedwater flow nozzle." This is true only for the installation locations of the new Leading Edge Flow Meters (LEFMs) in Loops "B" and "C" for each unit. The loop "A" LEFM location is upstream of both the flow straightener and the feedwater flow nozzle for each unit. The correct location is acknowledged elsewhere in the safety evaluation, specifically earlier on page 40, in the first bulleted paragraph on that page, as well as on page 21, Section 3.7.2. Neither of these errors has any bearing on the NRC staffs technical evaluation or conclusions.
Please contact me at 301-415-2833 if you have any questions.
Sincerely, Ira!
Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsOgcRp Resource LPLI-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl1-2 Resouce RidsNrrDorlDpr Resource RidsRgn 1 MailCenter Resource RidsNrrLAABaxter Resource RidsNrrPMLimerick Resource ADAMS Accession Number: ML111040089
- via email OFFICE LPLI-2/PM LPLI-2/LA LPL1-2/BC NAME PBamford ABaxter..
HChernoff DATE 04114/2011 04/18/2011 04/20/2011 OFFICIAL RECORD COPY