Pilgrim - E-Mail with Attachment from Susan Uttal, Esq. to Pilgrim Board Re Receipt of Letter from CoulterML11133A379 |
Person / Time |
---|
Site: |
Pilgrim |
---|
Issue date: |
05/05/2011 |
---|
From: |
Uttal S L NRC/OGC |
---|
To: |
Abramson P B, Burke T, Cole R F, Gaukler P A, Hollis S, Lampert M, Doris Lewis, Tucker K, Austin Young Atomic Safety and Licensing Board Panel, - No Known Affiliation, NRC/OCAA |
---|
Uttal S L |
References |
---|
50-293-LR |
Download: ML11133A379 (3) |
|
|
---|
Category:Legal-Correspondence
MONTHYEARML20183A1222020-06-30030 June 2020 6-30-20 Dismissal Agreement (DC Cir.)(Case No. 19-1198)(Consolidated with 20-1019) ML20063N0002020-02-26026 February 2020 2-26-20 Statement of Intent to Utilize Deferred Joint Appendix (DC Cir.)(Case No. 20-1019) ML20035C7762020-01-31031 January 2020 1-31-20 Entergy Entry of Appearance (DC Cir.)(Case No. 20-1019) ML20024D6912020-01-21021 January 2020 1-21-20, Intervenors Motion for Additional Time to File Reply (DC Cir.)(Case No. 19-1198) ML20016A3662020-01-10010 January 2020 Massachusetts' Opposition to Respondents' and Intervenor-Respondents' Motions to Dismiss ML19309E7632019-11-0101 November 2019 Intervenors' Opposed Motion for Extension of Time (DC Cir.)(Case No. 19-1198) 11-01-19 ML19303B3162019-10-28028 October 2019 Docketing Statement (DC Cir.)(Case No. 19-1198) 10-28-19 ML19303B3142019-10-28028 October 2019 Underlying Decisions from Which Appeal or Petition Arises (DC Cir.)(Case No. 19-1198) 10-28-19 ML19274B3432019-09-25025 September 2019 Petition for Review (DC Cir.) (Case No. 19-1198)- 9-27-19 ML13168A4732013-06-14014 June 2013 G20130461/LTR-13-0523 - Mary Lampert, Director, Pilgrim Watch, Et Al., Email 2.206 - Immediately Suspend the Operating License of Pilgrim Station Until the Provisions of EA-12-050 and EA-13-109 Are Fully Implemented ML12192A6182012-06-28028 June 2012 Ltr Margaret Sheehan Re Request to Reinitiate ESA Section 7 Consultation with Regard to Roseate Tern - Pilgrim Nuclear Power Station ML12179A3152012-06-26026 June 2012 6/26/12 - Entergy Motion to Intervene in 12-1772 ML12172A3552012-06-18018 June 2012 Mass V NRC - 1st Cir 12-1772 - Mass Petition for Review and Court Notices ML1211004862012-04-0909 April 2012 Case Opening Notice - Commonwealth of Massachusetts V. USNRC ML11223A0642011-08-10010 August 2011 Letter to Senator Daniel a Wolf Regarding Concerns About the Safety of Extended Operating of Pilgrim Nuclear Power Station ML11133A3792011-05-0505 May 2011 E-Mail with Attachment from Susan Uttal, Esq. to Pilgrim Board Re Receipt of Letter from Coulter ML1101403242011-01-14014 January 2011 Certificate of Service ML1100503312010-12-29029 December 2010 Entergy'S Twenty-Second Supplemental Disclosure ML1033403302010-11-22022 November 2010 Entergy'S Notice of Filing Affidavit ML1032603012010-11-18018 November 2010 Affidavit of Dr. Nathan E. Bixler Re Board'S Questions from Board Majority on the Mechanics of Computing Mean Consequences in SAMA Analyses. ML1033403272010-11-17017 November 2010 Pilgrim Watch Memo to Gaukler'S Request for Citations and Copies of Specified Documents in Disclosures 6 and 7 ML1032103112010-11-11011 November 2010 Entergy'S Twentieth Supplemental Disclosure ML1030903772010-11-0505 November 2010 Email Pilgrim Watch Oct. 27 Letter Re Pw 6th and 7th Supplemental Disclosures and Transmitting Lyman Cv ML1030800762010-10-27027 October 2010 Response to Paul Gaukler'S Letter of October 20 Regarding Three Issues Raised, (Witness List, Sixth & Seventh Disclosures and Sworn Affidavit on 7th Disclosure) ML1030800772010-10-21021 October 2010 Supplement to Seventh Disclosure Statements by Pilgrim Watch ML1030000572010-10-20020 October 2010 Request for Pilgrim Watch Witness List and the Relied Upon Bases of Experts in Accordance with 10 CFR Section 2.336(a)(1) ML1030000582010-10-13013 October 2010 Pilgrim Watch Seventh Disclosure Statement ML1028501442010-10-0404 October 2010 Entergy'S Nineteenth Supplemental Disclosure ML1026302922010-09-13013 September 2010 Entergy'S Eighteenth Supplemental Disclosure ML1021502212010-07-29029 July 2010 Entergy'S Seventeenth Supplemental Disclosure ML1019300282010-07-0909 July 2010 Email from Mary Lampert Regarding Commission Notification Relating to Pilgrim Nuclear Power Station ML1020201892010-07-0808 July 2010 Notification of Information in the Matter of Pilgrim Nuclear Power Station ML1019300272010-07-0808 July 2010 Email from Mary Lampert Regarding Commission Notification Relating to Pilgrim Nuclear Power Station ML1018909482010-07-0808 July 2010 Commission Notification Letter on Pilgrim ML1019403422010-07-0606 July 2010 Entergy'S Sixteenth Supplemental Disclosure ML1017401302010-06-16016 June 2010 Entergy'S Fifteenth Supplemental Disclosure ML1017304722010-06-13013 June 2010 Pilgrim Watch Supplement to Sixth Disclosure Statement ML1016600152010-06-10010 June 2010 Request for Identity and Related Information for the Witnesses Mary Lampert Identified to the Board in May 4 Telephone Conference ML1016800632010-06-0707 June 2010 Pilgrim Watch Sixth Disclosure Statement ML1016100822010-06-0303 June 2010 Entergy'S Fourteenth Supplemental Disclosure ML1015404222010-05-25025 May 2010 Index of Documents Previously Produced as Part of Entergy'S Initial and Twelve Supplemental Productions That Are Relevant to Pilgrim Watch Contention 3 ML1014600372010-05-24024 May 2010 Pw Request for Permission & Reply to Entergy Opposition to Pw Motion to Disqualify Judge Abramson 05.24.10 and Certificate Service ML1012501412010-05-0303 May 2010 Pilgrim Watch Request for Information Relating to Previous Disclosures and Request for Additional Information ML1012700402010-04-30030 April 2010 Entergy'S Twelfth Supplemental Disclosure ML1009801462010-04-0606 April 2010 Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station) Intends to Submit Answers Opposing Pilgrim Watch'S Motion and Town of Plymouth'S Motion to Reschedule April 8 Conference Call ML1002801842010-01-21021 January 2010 Pilgrim Watch Notice to Commission Regarding New and Significant Information Pertaining to Pilgrim Watch'S Petition for Review of LBP-06-848 ML0911803202009-04-27027 April 2009 Commission Response to Pilgrim Watch'S Request for Information Regarding the Appointment of an Adjudicatory Employee ML0905508332009-02-18018 February 2009 Commissioner Svinicki'S Visit to Pilgrim NPS ML0905508322009-02-17017 February 2009 Commissioner Svinicki'S Visit to Pilgrim NPS ML0904303782009-02-12012 February 2009 Response of Legal Counsel to Commissioner Svinicki to the Invitation to Meet with Pilgrim Watch (with Attached Emails from Mary Lampert) 2020-06-30
[Table view] Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtecs Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. Obrien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
From:Uttal, Susan To:Abramson, Paul; Cole, Richard; David Lewis; Docket, Hearing; Duxbury MA; Duxbury TownHall MacDonald
- Mary Lampert; OCAAMAIL Resource; Paul Gaukler; Plymouth Townhall; Sheila Hollis; T. Burke; Tucker, Katie
- Young, Ann Cc
- Regner, Lisa; Harris, Brian; Mizuno, Beth; Jones, Andrea
Subject:
Coulter letter Date:Thursday, May 05, 2011 2:59:00 PM Attachments:Pilgrim Coulter Letter.pdfDear Administrative Judges and Parties; Please be advised that NRC staff counsel also received a note from Patricia Coulter, with anattachment identical to that received by the Board, and referenced in the Board's Disclosure issued today.
I have attached a copy of these documents to this email.
Sincerely, Susan L. UttalCounsel for NRC Staff
- $ ..... _",.,.", ",I ,..f ." d . s
--I. -LJ?.J-.f"'"' .. A -rU"d-"? s.... (,"7r->? -S ." W s ..... 0 $-S.'d' ,., 11.'''
IN -A..." t/ ..r--, J .ft'-.N .... !.IJ]. ;"0' f a -y?""" .., ..., -'1 --e.... .' '1-') -'-.1 TIfJ r"'1-.-(..; .'" ;n -
- .-,. "" -I, -f 0 S('"t"?,'
II 4 -'55 , J'7\:> _'_'
J.f /?flJ:J'")
",.' --,'7# 1,1-. h-P '1 1!'Ll -8 'Z 1 J, :
'tA 7J1-' -,'r-;...______ .J.nj11 0 :J *S'V]J]..i.lvd
'S}\[ . lJIOJ:f, .71(';\.
Several years ago after taking in a Chilean-Gennan man who had lost his residence;the American Language Academy at Babson College contacted us to board some of their foreign students.
Kazu, a Japanese teenager, arrived one evening. I had mixed feelings about this because I had two brothers in World War 2. Kazu turned out to be the sweetest, kindest, most intelligent guest we ever had. He is our Japanese son., When the disaster struck Japan we could only Email him,all telephone lines were down. Thank you very much for your kindly thoughts" he replied. "We are o.k." When we finally did talk to him he said that they were 400 kilometers from the Fukushima facility but that they have no electricity and his plants and foundries he oversees are struggling.
We have read "Japan is the most earthquake and tsunami-prepared country on the planet" Many of the sheltered 700,000 refugees from Fukushima have been living on one and one-half rice balls a day. Was this good preparation?
We worry about Kazu, his young wife, his young children.
We wish we could help our Japanese son. South of Duxbury lies Plymouth's aging nuclear power plant, it's 40-year old very presence a constant reminder of the potential danger which befell Japan. Entergy says it will drycask 200 or so of the spent fuel rods inadequately stored by 2014. What about the other 3800? Of course it's an expense. Miniscule compared to dealing with a nuclear holocaust
-say 488 billion dollars or so (Massachusetts Attorney General' Office). And there are other problems:
buried electric cables corroding, leaking radioactive tritium, and fissures in the control rods. Adding to his deterioration of the structure:
the chance of human error, the possibility of terrorist acts, Mother Nature's unpredictability.
Then there is the destruction ofwildlife:
the sucking in of water killing fish larvae, eggs, shellfish and other creatures large and small trapped in screens of intakepipes and into cooling systems. And the hot water exiting the plant impacts the ocean. In the morning from our kitchen window we can see the rose-breasted nut hatch like a baby torpedo zeroing in on the suet. In late afternoon we see the baby sparrows flapping their tiny wings in the bird bath. It's pastoral.
Idyllic. Will they live radiation free? Will they have a future? Will we?