ML112570082

From kanterella
Revision as of 06:27, 3 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Vallecitos Nuclear Center Organization Change
ML112570082
Person / Time
Site: Vallecitos Nuclear Center, 07000754, Vallecitos
Issue date: 09/13/2011
From: Murray S P
Global Nuclear Fuel - Americas
To:
Document Control Desk, NRC/FSME, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
SPM 11-046
Download: ML112570082 (2)


Text

GE Hitachi Nuclear Energy SPM 11-046 September 13, 2011 US Nuclear Regulatory Commission

Attn: Document Control Desk Director, Office of Nuclear Reactor Regulation Washington, DC 20555-0001 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001

Subject:

Vallecitos Nuclear Center Organization Change

References:

1) License TR-1, Docket 50-70 (GETR) 2) License DR-10, Docket 50-183 (EVESR)
3) License DPR-1, Docket 50-18 (VBWR)
4) License R-33, Docket 50-73 (NTR) 5) SNM 960, Docket 70-754

Pursuant to the Technical Specifications requirements of References 1 and 4 this 30-day report is being provided regarding personnel changes in the Manager, Vallecitos Nuclear Center.

Specifically, License TR-1 Docket 50-70 (GETR), Technical Specification (6.6.2.2.a) requires issuance of a thirty day report for permanent changes in the facility organization involving Level 1-2 personnel while License R-33 Docket 50-73 Technical Specification (6.6.2.b) requires a written report within 30 days to the NRC following permanent changes in the facility organization

involving Level 2 or Level 3 management.

Effective August 19, 2011 Mr. Louis Quintana will no longer be the acting Manager, Vallecitos Nuclear Center. Mark T. Varno will assume the Manager, VNC role in an interim capacity. Mr. Varno assumes full responsibility and authority defined for the Manager, VNC for all aspects associated with the Reference 1 Level 1 Organization Head and Reference 4 Level 3 Manager.

We are in the process of hiring a new Site Manager and expect that individual to be in place in a

few weeks.

Global Nuclear Fuel Scott P. Murray Manager, Licensing and Liabilities

3901 Castle Hayne Road P.O. Box 780, Mail Code K-84 Wilmington, NC 28402

USA T 910 819 5950 F 910 362 5950 scott.murray@ge.com

US Nuclear Regulatory Commission September 13, 2011 Page 2 References 2, 3, and 5 do not contain specific requirements of this nature, but are reported here for completeness.

If you have any questions in the above matters, please contact me. Sincerely, Scott P MurrayYf/1fY Licensing and Commitments:

None Attachments:

None Cc: John Buckley-Project Manager Chris Ryder-Project Manager GE I Nuclear Energy