Global Nuclear Fuel Scott P. Murray Manager, Licensing and Liabilities 3901 Castle Hayne Road P.O. Box 780, Mail Code K-84 Wilmington, NC 28402 USA SPM 11-046 T 910 819 5950 F 910 362 5950 September 13, 2011 scott.murray@ge.com US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Reactor Regulation Washington, DC 20555-0001 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001

Subject:

Vallecitos Nuclear Center Organization Change

References:

1) License TR-1, Docket 50-70 (GETR)
2) License DR-10, Docket 50-183 (EVESR)
3) License DPR-1, Docket 50-18 (VBWR)
4) License R-33, Docket 50-73 (NTR)
5) SNM 960, Docket 70-754 Pursuant to the Technical Specifications requirements of References 1 and 4 this 30-day report is being provided regarding personnel changes in the Manager, Vallecitos Nuclear Center.

Specifically, License TR-1 Docket 50-70 (GETR), Technical Specification (6.6.2.2.a) requires issuance of a thirty day report for permanent changes in the facility organization involving Level 1-2 personnel while License R-33 Docket 50-73 Technical Specification (6.6.2.b) requires a written report within 30 days to the NRC following permanent changes in the facility organization involving Level 2 or Level 3 management.

Effective August 19, 2011 Mr. Louis Quintana will no longer be the acting Manager, Vallecitos Nuclear Center. Mark T. Varno will assume the Manager, VNC role in an interim capacity. Mr.

Varno assumes full responsibility and authority defined for the Manager, VNC for all aspects associated with the Reference 1 Level 1 Organization Head and Reference 4 Level 3 Manager.

We are in the process of hiring a new Site Manager and expect that individual to be in place in a few weeks.

GE Hitachi Nuclear Energy

US Nuclear Regulatory Commission September 13, 2011 Page 2 References 2, 3, and 5 do not contain specific requirements of this nature, but are reported here for completeness.

If you have any questions in the above matters, please contact me.

Sincerely, Scott PMurrayYf/1fY Licensing and Lia~

Commitments: None Attachments: None Cc: John Buckley- Project Manager Chris Ryder- Project Manager GE I ~itachi Nuclear Energy