ML13347B319

From kanterella
Revision as of 18:36, 13 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
W. Berg Ltr. Request for Additional Information for Decommissioning Fund Status Report for Lacrosse
ML13347B319
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/16/2013
From: Hickman J B
NRC/FSME/DWMEP/DURLD/RDB
To: Berg W L
Dairyland Power Cooperative
Hickman J
References
Download: ML13347B319 (4)


Text

December 16, 2013

Mr. W. L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817

SUBJECT:

DAIRYLAND POWER COOPERATIVE, LA CROSSE BOILING WATER REACTOR DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Berg:

On March 27, 2013, Dairyland Power Cooperative submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Lacrosse Boiling Water Reactor, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your Decommissioning Funding Status report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/ John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs

Docket No.: 50-409

Enclosure:

Request for Additional Information

cc: La Crosse Boiling Water Reactor Service List Mr. W. L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817

SUBJECT:

DAIRYLAND POWER COOPERATIVE, LA CROSSE BOILING WATER REACTOR DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Berg:

On March 27, 2013, Dairyland Power Cooperative submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Lacrosse Boiling Water Reactor, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your Decommissioning Funding Status report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely,

/RA/ John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs

Docket No.: 50-409

Enclosure:

Request for Additional Information

cc: La Crosse Boiling Water Reactor Service List

DISTRIBUTION

ROrlikowski RIII AKock, NRR KLois, NRR ML13347B319 OFC DWMEP:PM DWMEP:LA DWMEP:BC DWMEP:PM NAME JHickman CHolston BWatson JHickman DATE 12 /16/ 2013 12 /16/ 2013 12 /16/ 2013 12 /16 / 2013 OFFICIAL RECORD COPY

La Crosse Boiling Water Reactor Service List

Mr. William L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817

Mr. Thomas Zaremba Wheeler, Van Sickle and Anderson

Suite 801 25 West Main Street Madison, WI 53703-3398

Mr. George Kruck Chairman, Town of Genoa S5277 Mound Ridge Road Genoa, WI 54632

Mr. Jeffery Kitsembel Electric Division

Wisconsin Public Service Commission P.O. Box 7854 Madison, WI 53707-7854

Mr. Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659

Mr. Don G. Egge, Plant Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846

Mr. Jeff McRill, Technical Support Engineer La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846

Regional Administrator Region III U.S. Nuclear Regulatory Commission

2443 Warrenville Road Lisle, IL 60532-4352

Enclosure REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2013 DECOMMISSIONING FUNDING STATUS REPORT FOR LA CROSSE BOILING WATER REACTOR

The request for additional information (RAI) is in response to the 2013 Decommissioning Funding Status (DFS) report for Lacrosse Boiling Water Reactor. On March 27, 2013, Dairyland Power Cooperative submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Lacrosse Boiling Water Reactor, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).

RAI #1: Decommissioning Costs On March 27, 2013, Dairyland Power Cooperative did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.

Per 10 CFR 50.82(a)(8)(v), The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based. Provide the difference between actual and estimated costs for decommissioning work performed during the previous year.