W. Berg Ltr. Request for Additional Information Regarding the Reactor Decommissioning Funding Status Report for La Crosse
ML12194A699
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 07/18/2012
From: John Hickman
NRC/FSME/DWMEP/DURLD/RDB
To: Berg W
Dairyland Power Cooperative
John Hickman
References
Download: ML12194A699 (5)


Text

July 18, 2012 Mr. W. L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817

SUBJECT:

DAIRYLAND POWER COOPERATIVE, LA CROSSE BOILING WATER REACTOR DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Berg:

On March 26, 2012, Dairyland Power Cooperative (DPC) submitted to the Nuclear Regulatory Commission (NRC) the 2012 Decommissioning Funding Status (DFS) report for the La Crosse Boiling Water Reactor (LACBWR), as required under Title 10 of the Code of Federal Regulations Section 50.75(f)(1). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

Sincerely,

/RA/

John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-409 License No.: DPR-45

Enclosure:

Request for Additional Information cc: La Crosse Boiling Water Reactor Service List

Mr. W. L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817

SUBJECT:

DAIRYLAND POWER COOPERATIVE, LA CROSSE BOILING WATER REACTOR DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Berg:

On March 26, 2012, Dairyland Power Cooperative (DPC) submitted to the Nuclear Regulatory Commission (NRC) the 2012 Decommissioning Funding Status (DFS) report for the La Crosse Boiling Water Reactor (LACBWR), as required under Title 10 of the Code of Federal Regulations Section 50.75(f)(1). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

Sincerely, John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-409 License No.: DPR-45

Enclosure:

Request for Additional Information cc: La Crosse Boiling Water Reactor Service List DISTRIBUTION:

CLipa/RIII SHarwell, NRR CRegan, NRR ML12194A699 OFC DWMEP:PM DWMEP:LA DWMEP:BC DWMEP:PM NAME JHickman CHolston BWatson JHickman DATE 7 / 17 / 12 7 / 17 / 12 7 / 18 / 12 7/18/12 OFFICIAL RECORD COPY

La Crosse Boiling Water Reactor Service List Mr. Thomas Zaremba Wheeler, Van Sickle and Anderson Suite 801 25 West Main Street Madison, WI 53703-3398 Mr. George Kruck Chairman, Town of Genoa S5277 Mound Ridge Road Genoa, WI 54632 Mr. Jeffery Kitsembel Electric Division Wisconsin Public Service Commission P.O. Box 7854 Madison, WI 53707-7854 Mr. Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Mr. Don G. Egge, Plant Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846 Mr. Jeff McRill, Technical Support Engineer La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846 Regional Administrator Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road Lisle, IL 60532-4352

REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2012 DECOMMISSIONING FUNDING STATUS REPORT FOR LA CROSSE BOILING WATER REACTOR The requests for additional information (RAIs) provided below are in response to the 2012 Decommissioning Funding Status (DFS) report for La Crosse Boiling Water Reactor. On March 26, 2012, Dairyland Power Cooperative (DPC) submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2012 DFS report La Crosse Boiling Water Reactor (LACBWR), as required under Title 10 of the Code of Federal Regulations (10 CFR) 50.75(f)(1). (Agencywide Documents Access and Management System Accession No. ML12101A210).

RAI #1: Decommissioning Costs On March 26, 2012, DPC provided the following radiological decommissioning costs associated with license termination for LACBWR:

The amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75(b) and (c) is $69,846,063 in 2011 dollars. Certain decommissioning activities in the amount of $24,127,338 were completed during the timeframe of 2005 through 2007 for the removal of the LACBWR Reactor Pressure Vessel (RPV) and the permanent disposal of the RPV at the radioactive waste disposal site in Barnwell, South Carolina, as well as removal of additional Class B and Class C low-level radioactive waste. As of December 31, 2011, Dairyland has withdrawn

$18,154,154 from the Dairyland Power Cooperative Nuclear Decommissioning Trust (DPC - NDT) for this decommissioning work with the last withdrawal occurring on April 16, 2007. There have been additional expenditures for activities under the decommissioning plan for which Dairyland has not been reimbursed, no additional withdrawals occurred in 2011. There are plans to withdraw funds in 2012 for decommissioning expenses expected to be incurred by Dairyland during the year.

Per 10 CFR 50.75(f)(1),

The information in this report must include, at a minimum the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c).

Provide the amount of decommissioning funds estimated to be required based on the formula from 10 CFR 50.75(b) and (c). Provide the total and remaining decommissioning costs estimated to be required pursuant to 10 CFR 50.75(b) and (c) as indicated in the most recent site-specific cost estimate for LACBWR.

Enclosure

RAI #2: Citation for Site-Specific Study On March 26, 2012, DPC indicated that LACBWR was placed in SAFSTOR status as of May 1, 1987, and is scheduled to begin final decommissioning in 2019. You also indicated that you gave notification to the NRC in December 2010 of a change in schedule to accelerate the removal of radioactive metal from the LACBWR facility, after the LACBWR spent fuel is transferred to the Independent Spent Fuel Storage Installation.

Per 10 CFR 50.75(e)(1)(i) and (ii),

The licensee must specifically describe the safe storage period in order to take credit for projected future earnings when it uses a site-specific estimate as the basis for using the prepayment or external sinking fund methods of financial assurance.

Provide the most recent site specific cost estimate for LACBWR, unless it was previously submitted to NRC. If the cost estimate was previously submitted to NRC, then provide a reference to its submittal. The site-specific cost estimate should include a summary schedule of annual expenses, projected earnings, and end-of-year fund balances, expressed in 2011 dollars.

Pursuant to 10 CFR 50.75(b), the cost estimate shall be in an amount that may be more, but not less, than the amount estimated to be required under 10 CFR 50.75(b) and (c).