MONTHYEARML21189A2022021-03-0808 March 2021 Enclosure 1: Description and Evaluation of Changes ML21105A0332021-03-0808 March 2021 ISFSI Emergency Plan License Amendment Request - Public ML18331A0252018-11-15015 November 2018 Enclosure 2 - Replacement License Amendment Request and Revised License Condition Pages ML18184A4442018-06-27027 June 2018 Lacrossesolutions, LLC - Application for Order Approving License Transfer and Conforming Administrative License Amendments ML16347A0262016-12-0101 December 2016 Boiling Water Reactor License Termination Plan Update ML16200A0832016-07-27027 July 2016 Boiling Water Reactor, License Amendment Request for the License Termination Plan ML16200A0862016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 2 - Site Characterization, Rev. 0 ML16181A0682016-06-27027 June 2016 Boiling Water Reactor Request for Partial Site Release ML16200A0852016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 1 - General Information, Rev 0 ML16200A0932016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 6 - Compliance with the Radiological Criteria for License Termination, Rev. 0 ML16200A0912016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 8, - Supplement to the Environmental Report, Rev 0 ML16200A0892016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 5 - Final Radiation Survey Plan, Rev. 0 ML16200A0882016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 4 - Remediation Plan, Rev. 0 ML16200A0872016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 3 - Identification of Remaining Site Dismantlement Activities, Rev. 0 ML16200A0902016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 7, Redacted - Update of the Site-Specific Decommissioning Costs, Rev. 0 ML15307A3102015-10-0808 October 2015 Dairyland Power Cooperative, Submittal of Application for Order Approving License Transfer and Conforming Administrative License Amendments ML13280A2892013-09-30030 September 2013 Dairyland Power Cooperative, Changes to LACBWR Controlling Documents ML13220A9532013-08-0606 August 2013 Dairyland Power Cooperative, License Amendment Request for Proposed Revision to LACBWR Emergency Plan ML12362A0212012-12-10010 December 2012 Dairyland Power Cooperative - License Amendment Request Following Completion of Dry Cask Storage ML0924704592009-07-28028 July 2009 Boiling Water Reactor Request for Amendment to 10 CFR 50, Possession-Only License in Support of Dry Cask Storage Project ML0602303522006-01-12012 January 2006 1/12/2006 Ltr from R.E. Christians/Dpc to P. Schmidt/Wi Notification of License Amendment Request ML0600403012005-12-13013 December 2005 Dairyland Power Cooperative - Lacrosse Boiling Water Reactor - Possession-Only - License Amendment Request 2021-03-08
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23057A0162023-02-27027 February 2023 Email La Crosse Boiling Water Reactor Request for Information East Portion of Survey Unit L1-010-102 ML22277A4632022-08-22022 August 2022 (External) Additional Question for Es About WTB Sample Judgmental 16 ML22277A4482022-07-0505 July 2022 Questions for Es on Class 1 Survey Units ML22277A4752022-05-31031 May 2022 (External) La Crosse Class 1 Review Questions ML21228A0682021-09-0202 September 2021 Request for Additional Information Related to the ISFSI-Only Emergency Plan ML18331A0302018-11-15015 November 2018 Lacrossesolutions License Termination Plan Request for Additional Information ML18331A0252018-11-15015 November 2018 Enclosure 2 - Replacement License Amendment Request and Revised License Condition Pages ML17178A2522017-08-0404 August 2017 Boiling Water Reactor - License Termination Plan Request for Additional Information Letter ML16069A2022016-03-17017 March 2016 Lacrosse Boiling Water Reactor - Request for Additional Information Regarding the Request for Review and Approval of Revision 29 to the Quality Assurance Program Description ML13347B3192013-12-16016 December 2013 W. Berg Ltr. Request for Additional Information for Decommissioning Fund Status Report for Lacrosse ML13346A1422013-12-16016 December 2013 Letter to W. L. Berg of Dairyland Power Cooperative, Lacrosse Emergency Plan Change Request for Additional Information ML12194A6992012-07-18018 July 2012 W. Berg Ltr. Request for Additional Information Regarding the Reactor Decommissioning Funding Status Report for La Crosse ML1005400762010-03-11011 March 2010 W. Berg Ltr. Re Request for Additional Information on License Amendment Request in Support of Dry Cask Storage Project ML0334601862003-12-11011 December 2003 Request for Additional Information (RAI) on the Spent Fuel Management and Funding Plan for La Crosse Boiling Water Reactor (TAC No. L52608) 2023-02-27
[Table view] |
Text
Enclosure 2 to LC-2018-0075 Replacement License Amendment Request and Revised License Condition Pages (3 pages)
The following license condition to be added to the LACBWR possession only license:
2.C (5) License Termination Plan (LTP)
Solutions shall implement and maintain in effect all provisions of the approved License Termination Plan, as approved in License Amendment No. xxx subject to and as amended by the following stipulations:
Solutions may make changes to the LTP without prior approval provided the proposed changes do not meet any of the following criteria:
(A) Require Commission approval pursuant to 10 CFR 50.59.
(B) Result in significant environmental impacts not previously reviewed.
(C) Detract or negate the reasonable assurance that adequate funds will be available for decommissioning.
(D) Decrease a survey unit area classification (i.e., impacted to not impacted; Class 1 to Class 2; Class 2 to Class 3; or Class 1 to Class 3) without providing the NRC a minimum 14 day notification prior to implementing the change in classification.
(E) Increase the derived concentration guideline levels (DCGL) and related minimum detectable concentrations (for both scan and fixed measurement methods).
(F) Increase the radioactivity level, relative to the applicable DCGL, at which an investigation occurs.
(G) Change the statistical test applied other than the Sign test.
(H) Increase the probability of making a Type I decision error above the level stated in the LTP.
(I) Change the approach used to demonstrate compliance with the dose criteria (e.g.,
change from demonstrating compliance using DCGLs to demonstrating compliance using a dose assessment that is based on final concentration data).
(J) Change parameter values or pathway dose conversion used to calculate the dose, such that the resultant dose is lower than in the approved LTP and if a dose assessment is being used to demonstrate compliance with the dose criteria.
2.0 DESCRIPTION
OF PROPOSED CHANGES Solutions proposes to amend the license to include a provision to allow Solutions to make changes to the approved LTP without prior NRC approval, similar to the flexibility afforded to licensees in making changes to the facilities or procedures, as described in the SAR or equivalent (D-Plan/PSDAR).
The change method includes ten change criteria elements. Thus, Solutions proposes to amend the LACBWR possession only license to incorporate a new license condition, License Condition 2.C (5) as follows:
- 2. C (5) License Termination Plan (LTP)
Solutions shall implement and maintain in effect all provisions of the approved License Termination Plan, as approved in License Amendment No. xxx subject to and as amended by the following stipulations:
Solutions may make changes to the LTP without prior approval provided the proposed changes do not meet any of the following criteria:
(A) Require Commission approval pursuant to 10 CFR 50.59.
(B) Result in significant environmental impacts not previously reviewed.
(C) Detract or negate the reasonable assurance that adequate funds will be available for decommissioning.
(D) Decrease a survey unit area classification (i.e., impacted to not impacted; Class 1 to Class 2; Class 2 to Class 3; or Class 1 to Class 3) without providing the NRC a minimum 14 day notification prior to implementing the change in classification.
(E) Increase the derived concentration guideline levels (DCGL) and related minimum detectable concentrations (for both scan and fixed measurement methods).
(F) Increase the radioactivity level, relative to the applicable DCGL, at which an investigation occurs.
(G) Change the statistical test applied other than the Sign test.
(H) Increase the probability of making a Type I decision error above the level stated in the LTP.
(I) Change the approach used to demonstrate compliance with the dose criteria (e.g.,
change from demonstrating compliance using DCGLs to demonstrating compliance using a dose assessment that is based on final concentration data).
(J) Change parameter values or pathway dose conversion used to calculate the dose, such that the resultant dose is lower than in the approved LTP and if a dose assessment is being used to demonstrate compliance with the dose criteria.