|
---|
Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML19346H8732019-12-12012 December 2019 Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 ML17340A3922017-11-28028 November 2017 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 ML17142A3222017-05-15015 May 2017 Part 21 - Potential Defect in Grayboot Socket Contacts ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17006A0102016-12-29029 December 2016 Engine Systems, Inc. - Part 21 Issues Identified with the Enterprise Diesel Engine Subcover ML16174A3952016-06-21021 June 2016 Fisher Information Notice, (FIN) 2016-05 - Insufficient Valve Cage Hardfacing ML14090A4332014-03-27027 March 2014 Interim Report- 10CFR 21 Evaluation Regarding Potential Deficiencies in Justification of Use of Prorate Spring in PV-62 ML14090A4322014-03-27027 March 2014 Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0520803682005-07-26026 July 2005 Tom Milton, Email, Interim Report-Cutler Hammer Components ML0327507562003-09-30030 September 2003 Part 21 Report Regarding the Failure of the Eaton Cutler-Hammer Freedom Series Heater Pack Due to a Possible Defect in the Weld Which Joins the Screw Terminal to the Heater Coil 2024-05-17
[Table view] Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML23087A1292023-03-23023 March 2023 Trillium Valves USA - Part 21 Written Notification - Event Number: 56420 ML23082A1122023-03-17017 March 2023 10 CFR Part 21 Report Inconsistent Crimping of Motor Leads to Ring Terminal Connectors and Failure to Comply. Trillium Valves USA Part 21 Evaluation I211003 ML20366A0482020-12-0707 December 2020 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0114, Rev. 1 NL-20-0764, Initial 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-06-24024 June 2020 Initial 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material ML19346H8732019-12-12012 December 2019 Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 ML19072A0632019-03-0606 March 2019 10 CFR Part 21 Report Notification of a Defect with Target Rock Modulating Valve Positioner; Model 810000-X ML18225A1182018-07-27027 July 2018 Ametek Solidstate Controls - Notification of Potential Defect-10CFR Part 21 ML17340A3922017-11-28028 November 2017 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 ML17333A3792017-11-21021 November 2017 Engine Systems, Inc. 10 CFR 21 Reportable Notification on a Power Supply (P/N 2938604) ML17142A3222017-05-15015 May 2017 Part 21 - Potential Defect in Grayboot Socket Contacts ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML17032A0802016-12-30030 December 2016 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0114, Rev. 0 ML17006A0102016-12-29029 December 2016 Engine Systems, Inc. - Part 21 Issues Identified with the Enterprise Diesel Engine Subcover ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16174A3952016-06-21021 June 2016 Fisher Information Notice, (FIN) 2016-05 - Insufficient Valve Cage Hardfacing ML16188A3772016-06-21021 June 2016 Part 21 - Insufficient Valve Cage Hardfacing ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML15103A4852015-04-0707 April 2015 Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14090A4332014-03-27027 March 2014 Interim Report- 10CFR 21 Evaluation Regarding Potential Deficiencies in Justification of Use of Prorate Spring in PV-62 ML14099A5062014-03-27027 March 2014 Interim Report- 10CFR 21 Evaluation Regarding Potential Deficiencies in Testing of PV-62 ML14090A4322014-03-27027 March 2014 Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 ML14090A4312014-03-27027 March 2014 Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Testing of PV-62 ML14034A1892014-01-23023 January 2014 Part 21 - Loose Battery Vent Assemblies ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML1010602232010-03-0808 March 2010 Abb Inc. Ltr. Amended 10 CFR Part 21 Notification of Deviation Re. P/N 1SDA055274R1 Close Coil ML1005129062010-02-0808 February 2010 Notification of Potential Part 21 Re Failure of a Breaker Component to Comply with Design Specifications ML0934401522009-12-0808 December 2009 Notification of Potential Part 21 on Woodward Governor Servo Failure Due to Silver Sulfide Corrosion of Surface Mount Resistors ML0934908692009-12-0808 December 2009 Engine Systems, Inc., Transmittal of 10 CFR 21Defects and Non-Compliance for Woodward Pgpl Actuator with Remote Servo P/N 529-044 P/N: 9903-539 ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0812008822008-04-14014 April 2008 Notification of Potential Part 21 on Safety Related Noncompliance Deviation ML0734402112007-12-0707 December 2007 Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters ML0710002292007-04-0606 April 2007 Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1152 Pressure Transmitters ML0706802882007-03-0707 March 2007 Notification of Potential Part 21 on Defect in E7000 Relays ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0411403352004-04-21021 April 2004 Part 21 Notification Involving Voltage Monitoring Relays ML0215102952002-05-15015 May 2002 10 CFR 21 Notification - Potential Defect Fan Assemblies for UPS Systems ML0215502492002-05-10010 May 2002 Letter from W. G. Hampton Subject: 10CFR Part 21 Notification-Potenial Defect Involving Fan Assemblies Used in Forced Air Cooled Uninterruptible Power Supply Systems 2023-03-23
[Table view] |
Text
,J 0511512017 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 52756 Rep Org: CURTISS WRIGHT FLOW CONTROL CO. Supplier:
CURTISS-WRIGHT Notification Date I Time: 05/15/2017 18:55 (EDT) Event Date I Time: 03/16/2017 (CDT) Last Modification:
05/15/2017 Region: 1 Docket#: City: HUNTSVILLE County: Agreement State: Yes State: AL NRC Notified by: TONY GILL HQ Ops Officer: JEFF HERRERA Emergency Class: NON'EMERGENCY 10 CFR Section: 21.21 (a)(2) INTERIM EVAL OF DEVIATION License #: N/A Notifications:
MIKE ERNSTES PART 21/50.55 REACTORS PART 21 -POTENTIAL DEFECT IN GRAYBOOT SOCKET CONTACTS The following part 21 was received via email: R2DO EMAIL "This letter is issued to provide an interim notification of a potential defect in certain lots of Grayboot socket contacts supplied with EQ qualified Grayboot Connector Kits. On March 16, 2017, Curtiss-Wright, Nuclear Division, Huntsville Operations was contacted by Georgia Power Vogtle Nuclear Power Plant concerning a potential defect where the socket contact tines were in a relaxed state. "Although we have completed some testing and verification activities, additional testing is in progress now and will provide necessary information to complete our evaluation.
Current testing will be completed and final conclusions made by May 31, 2017. "At this time, based on test results, evaluations and operating experience, Curtiss Wright is confident that any potentially affected Grayboot Assemblies will continue to perform their intended safety functions.
As such, if the final recommendation is to replace the potentially defective socket contact, this can be accomplished during subsequent routine maintenance activities. "This notification is being made to comply with 60 day interim reporting requirements as defined in 10 CFR 21.21 (a)(2). "For additional information, pleaseicfontact:
Saim.iel Bledsoe, EGS*Products Engineering Manager (1-256-690-7852) or Tony Gill, EGS and Trentec Quality Assurance Manager (1-256-426-4558)." ********************************************************************************************************************************
CURTISS CB . *. IGffT May 15, 2017 To whom it 1riay concern: Nuclear Division 120, 125 & 330 West Park Loop Huntsville, AL 35806 T: 256.72.2.85001256.$95.1250 wwW.curtisswright.com/NuclearDivision (File No.: CWNHuntsvillelOCFR21-2017-0l)
This letter is issued to provide an interim notification of a potential defect in certain lots of Grayboot socket supplied with EQ qualified Grayboot Connector Kits. On March 16, 2017, Curtiss-Wright, Nuclear Division, Huntsville Operations was contacted by Georgia Power Vogtie Nuclear Power Plant concerning a potential defect where th¢ socket contact tines were in a relaxed state. *
- Although we have .completed some testing and verification activities, additional testing is in progress now and will provide necessary information to complete our evaluation.
Current testing will be completed and final conclusions made by May 31, 2017. . . ', At this time; based on test results, evaluations and operating experience, Curtiss Wright is confident that any potentially affected Grayboot Assemblies will continue to perform their intended safety functions.
As such, if the final recommendation is to replace the potentially defective socket contact, this can be accomplished during subsequent routine maintenance activities.
This notification is being made to comply with 60 day interim reporting requirements as defined in 10 CFR 21.2l(a)(2).
For additional information, please contact Satnuel Bledsoe, EGS Products Engineering Manager (l.,.2S6-690-7852) or Tony Gill, EGS and Trentec Quality Assurance Manager (l-'256-426-4558).
Sincerely, Samuel Bledsoe Engineering Manager, EGS Products Curtiss-Wright Nuclear Division 125 West Park Loop NW, Htintsville, AL 35806 sbledso:@.@cu1tiss\vright.com:
Tony Gil Quality Assurance Manager, EGS and Trentec Wright Nuclear Division 125 \Vest Park Loop NW, Huntsville, AL 35806
.. com