Part 21 Report Regarding the Failure of the Eaton Cutler-Hammer Freedom Series Heater Pack Due to a Possible Defect in the Weld Which Joins the Screw Terminal to the Heater Coil
ML032750756
Person / Time
Site: Beaver Valley, Vogtle, Cook, 07001201  American Electric Power icon.png
Issue date: 09/30/2003
From: Starr F
Framatome ANP
To: Cobey E, Foster J, Julio Lara, Lesser M
Office of Nuclear Reactor Regulation, NRC Region 1, NRC/RGN-II, NRC/RGN-III
References
+sispmjr200509, -RFPFR
Download: ML032750756 (4)


Text

0913012003 US. NuclearRegulatory Commission OperationsCenterEvent Report Pare I General Information or Other (PAR) Event# 40206 Rep Org: FRAMATOME ANP Notification Date I Time: 09/30/2003 14:39 (EDT)

Supplier: EATON CUTLER HAMMER Event Date I Time: 08119/2003 (EDT)

Last Modification: 09/30/2003 Region: I Docket #:

City: CRANBERRRY TOWNSHIP Agreement State: No County: License #:

State: PA NRC Notified by: FRAN STARR Notifications: EUGENE COBEY R1 HQ Ops Officer: ERIC THOMAS MARK LESSER R2 Emergency Class: NON EMERGENCY JULIO LARA R3 10 CFR Section: JACK FOSTER NRR 21.21 UNSPECIFIED PARAGRAPH PART 21 REPORT A potential safety concern was reported regarding failure of the Eaton Cutler-Hammer Freedom Series Heater Pack due to a possible defect in the weld which joins the screw terminal to the heater coil. The following conditions could potentially occur:

- Open circuit resulting in loss of current to a pole In the overload relay. If the load was not running at the time of failure, it would draw excessive current during its next attempted start, and either trip the overload or damage the load. If the load was running at the time of failure, it would slow to a stop while drawing excessive current, which would either trip the overload or damage the load.

- If two heaters failed in the same load, a shock hazard could develop due to voltage to ground on the remaining phase.

The affected Heater Packs are H2009B-3 through H2011B-3, and H2012B-3 through H2017B-3. The following NRC Licensees are affected: DC Cook, Vogtle, and Beaver Valley, Framatome-ANP Inc. in Lynchburg, VA.

Corrective actions by the supplier include daily inspection/replacement of weld electrodes, and destructive sample testing. Corrective actions by Framatome include dedication activities that address weld integrity acceptance.

Framatome recommends licensees replace all affected Heater Packs.

j:~i§6~b

09/30/2003 02:39 PM Framatoan ANP Cranberry PA 724 779 9844 1/:

A An AREVA and Siemens Company FRAMATOME ANP FRAMATOME AMP, Inc.

FAX COVER SHEET DATE: 9/30/03 Total Pages Including Cover 3 TO: NRC Operations Center COMPANY: United States Nuclear Regulatory Commission TELEPHONE: 301-816-5100 FAX:

301-816-5151 FROM: Fran Starr TITLE: QA Ma.nager COMPANY: Framatome ANP, Inc. - Electrical Products TELEPHONE: 724-779-9800 ext. FAX: 724-77'9-9844 1321 COMMENTS: See Below

Subject:

I0CFR Part 21 NRC Initial Notification Attached please find Framatome AMP, Inc. - Electrical Products, Letter No. LTR-03-309 which Identifies the concern of a potential failure of the Eaton Cutler-Hammer Freedom Series Heater Pack.

Should you have any questions, please contact me at (724) 779-9800 ext. 1321.

Thank You, Framatome AMP, Inc.

Fran Starr Quality Manager - Electrical Products FRAMATOME ANP, Inc. - Eloectrical Products 200 West Kensingor Drive, SuItS 600 Cranberry Township, PA 16066 Telephone: 724-779-9800 Ext. 1321 Emall:Fran.Starre framatome-mnp.com 09/30/2003 TUE 14:31 FTX/RX NO 87811 2inoi

09/30/2003 02:39 PM Framateme ANP CranberrV PA 724 779 9844 3/:

A FRAMATOME ANP An AREVA and Siemens Company FRAMATOME ANP, Inc.

Document Control Desk LTR 03-309 Director, Office of Inspection and Enforcement Page 2 of 2 Nuclear Customer I Locatlon Comoonents I Quantities (1) American Electric Power - DC Cook H2009B H2017B-3 (Various)

(2) Southern Nuclear Operating Co. - Vogge H2009B H201 58-3 (Various)

(3) First Energy Service Co. - Beaver Valley H2009B H201 I B-3. H2013SB-3 (Various)

H20148-3, H2016B-3 (Various)

(4) Framatome-ANP, nc. - Lynchburg, VA H201 1B H2012B-3, H2014B-3 (Various)

An Investigation by Frarnatorne ANP, Inc.

  • Electrical Products was conducted. The Investigation required coordination with the supplier to determine the cause(s) of the problem. The results of the Investigation determined that the root cause of the failure associated with the subject Eaton Cutler-Hammer Freedom Series Heater Pack was due to the supplier welding the screw terminal to the heater coil with wom out electrodes. Supplier corrective action(s) Implemented by Eaton Cutler-Hammer Includes documented dally Inspections I replacement of weld electrodes, documented destructive sample testing and Increased documented production sample Inspections.

Corrective actions to prevent recurrence, In conjunction with the supplier corrective action(s), are being Implemented by Framatome ANP, Inc - Electrical Products which Include dedication activities that address weld Integrity acceptance.

Framatome ANP, Inc - Electrical Products recommends the replacement of an H2009B-3 through H2017B-3 Eaton Cutler-Hammer Freedom Series Heater Packs. For additional Information the Licenses should contact Frarnatome ANP, Inc - Electrical Products at (724) 779-9800. exL 1321.

Sincerely, Framatome ANP, Inc. - Electrical Products Fran Starr Manager, Quality Assurance cc Gary Gibson - FANP Laurence Patterson - FANP Dan Mikow- FANP Dan Livermore - FANP William Orga - FANP Jim Mallay- FANP Emily A. Mayhew - FANP Tarn W. Wemer - FANP Rick Wyatt - Eaton Cutler-Hammer FL: md FRAMATOME ANP, Inc. - Electrical Products 200 West Kensinger Drive. Suits 600 Cranberry Township, PA 1 6060 Tel: 724-779-9800 ext. 1321 Fax: 724-779-9844 Emall:Fran.StarrCframatome-anp.com 09/30/2003 TUE 14:31 [TX/RX NO ST81J IM003

09/30/2003 02:39 PM Framatome ANP Cranberry PA 724 779 9844 2/1 AFRAMATOME ANP An AREVA and Siemens Company FRAMATOME ANP, Inc.

September 30, 2003 LTR 03-309 Document Control Desk Unites States Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Inspection and Enforcement

Subject:

Potential Failure of the Eaton Cutler-Hammer Freedom Series Heater Pack The following information Is provided pursuant to the requirements of 10CFR Part 21 to report a potential safety concern. This issue concerns the potential failure of the Eaton Cutler-Hammer Freedom Series Heater Pack, manufactured and supplied by Eaton Cutler-Harnmer due to a possible defect In the weld which joins the screw terminal to the heater col. The following condition has the potential to occur.

it If the weld on a Eaton Cutler-Hammer Freedom Series Heater Pack failed after Installation Into a Freedom Overload Relay, the broken heater would create an open circuit resulting In the current for that pole to be lost to the load. If the load was not running at the time of failure there would be no Indication of failure until the load was started. The load would not start In this condition and would draw excessive current which would either trip the overload or damage the load. A properly applied correctly operating thermal overload relay should protect the load from damage in this condition. If the load was running at the time of fallure, the load would slow or stop while drawing excessive current, which would either trip the overload or damage the load. A properly applied, correctly operating thermal overload relay should protect the load from damage In this condition. If two or three heaters failed In the same overload, there would be no current flow to the load. If two heaters failed, a voltage to ground could exist at the load on one phase, which could represent a shock hazard. Customary source lockout I tagout requirements for electrical work would prevent this hazard from endangering personnel, since the starter should be completely de-energized before troubleshooting work Is started that would expose personnel to the energized conductor.

This condition Is suspect for the Eaton Cutler-Hammer Freedom Series Heater Packs, Identified below:

(1) H2009B-3 through H201 1B-3, which utilizes a weld and rivet to join the screw terminal to the heater coil, and (2) Heaters H2012B-3 through H2017B-3, which utilzes a weld to join the screw terminal to the heater coil.

This potential safety concern was Identified by Framatome ANP, Inc. - Electrical Products and was determined to be of a reportable nature by Framatome ANP, Inc. - Electrical Products (formerly Eaton Cutler-Hammer Nuclear Programs) on August 19, 2003. Framatome ANP, Inc. - Electrical Products has supplied safety related Eaton Cutler-Hammer Freedom Series Heater Packs H2009B-3 through H201 7B-3 to the nuclear customers , Identified below, and considers all aforementioned Eaton Cutler-Harnmer Freedom Series Heater Packs supplied by Framatome ANP, Inc.

- Electrical Products to be suspect. The non-nuclear commercial segment of Eaton Cutler-Hammer has supplied the same product to third party suppliers. Third party suppliers may have supplied the same product to the nuclear Industry as safety related.

FRAMATOME ANP, Inc. - Electrical Products 200 West Kensinger Drive. Suite 600 Cranberry Township, PA 16066 Tel: 724-770-9800 ext. 1321 Fax: 724-779-9844 Emall:Fran.StarrS framatome-anp.com 09/30/2003 TUE 14:31 MUM NO 87811 0 002