Category:Letter
MONTHYEARML24249A3202024-09-0404 September 2024 Quality Assurance Program Application to Transportation Activities Pursuant to 10 CFR 71.101(f) IR 07200046/20244012024-07-23023 July 2024 Independent Spent Fuel Storage Installation – NRC Security Inspection Report 07200046/2024401 IR 05000409/20240012024-07-17017 July 2024 NRC Inspection Report 05000409/2024001(DRSS); 07200046/2024001(DRSS) ML24193A1152024-07-0909 July 2024 Intent to Implement NAC-MPC CoC No. 1025, Amendment No. 7, Revision 1 ML24136A2432024-05-24024 May 2024 Independent Spent Fuel Storage Installation - Exemption from Select Requirements of Title 10 of the Code of Federal Regulations Part 73 ML24121A0732024-04-16016 April 2024 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML24058A1222024-02-27027 February 2024 Independent Spent Fuel Storage Installation (ISFSI) Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2023 ML24045A1612024-01-25025 January 2024 LACBWR ISFSI Submittal 10 CFR 50.59 and 10 CFR 72.48 Report of Changes, Tests, and Experiments ML24045A1592024-01-25025 January 2024 LACBWR ISFSI Submittal of Decommissioning Plan and Post Shutdown Decommissioning Activities Report ML24031A6432023-12-20020 December 2023 Independent Spent Fuel Storage Installation (ISFSI) - Nuclear Liability Insurance Coverage ML23341A0222023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23192A0612023-06-14014 June 2023 Possession-Only License DPR-45 - Formal Announcement of New ISFSI Manager ML23192A1082023-06-14014 June 2023 Possession-Only License DPR-45 - New Chief Nuclear Officer Selected ML23130A1202023-05-0202 May 2023 Transmittal of Financial Statement and Auditors Report ML23137A1552023-05-0202 May 2023 Possession-Only License DPR-45 - Financial Statement and Auditors Report ML23115A1712023-04-0404 April 2023 ISFSI - Nuclear Liability Insurance Coverage ML23115A1742023-04-0303 April 2023 Independent Spent Fuel Storage Installation, Adoption of Amendment 7 of NAC MPC Certificate of Compliance No. 72-1025 and Canister Registration ML23074A0552023-03-13013 March 2023 Decommissioning Funding Status Report for Shutdown Reactor ML23066A3232023-03-0707 March 2023 Energysolutions, LLC, Notification of Closing of Transaction ML23076A0402023-03-0606 March 2023 Notification of License Transfer Date from Lacrossesolutions, LLC to Dairyland Power Cooperative ML23060A0732023-02-27027 February 2023 Annual Radiological Environmental Operating Report ML23055A0282023-02-24024 February 2023 Completion of License Termination Activities and Release of Remaining Class 1 Survey Units from Possession Only License No. DPR-45 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23033A0682023-01-26026 January 2023 Proof of Financial Protection ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000409/20220012022-12-27027 December 2022 NRC Inspection Report No. 05000409/2022001(DRSS) ML22321A3132022-12-0808 December 2022 LACBWR License Transfer Order Fifth Extension Letter ML22335A0852022-11-23023 November 2022 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC, to Dairyland Power Cooperative ML22297A0042022-10-20020 October 2022 Response to October 14, 2022 Request for Additional Information for Class 1 Excavation and Basement Survey Units ML22285A0782022-10-13013 October 2022 NRC Analysis of Energy Solutions Decommissioning Funding Status Report Docket No. 50-409 ML22278A0282022-10-12012 October 2022 Request for Confirmatory Information Letter Re to the Review of the Class 1 Survey Units ML22269A3902022-09-0707 September 2022 Response to July 5, 2022 Request for Additional Information for Class 1 Excavation and Basement Survey Units ML22230A8012022-08-16016 August 2022 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC, to Dairyland Power Cooperative ML22223A0712022-07-28028 July 2022 Response to June 5, 2022 Request for Additional Information for Class 1 Survey Areas ML22224A1172022-07-14014 July 2022 Possession-Only License DPR-45 Chief Nuclear Officer Selected ML22224A1372022-07-12012 July 2022 Quality Assurance Program Description (Oapd), Revision 31 ML22203A0932022-07-11011 July 2022 Changes to the La Crosse Boiling Water Reactor (LACBWR) ISFSI Physical Security Plan IR 07200046/20224012022-06-0101 June 2022 (Decommissioning) - Independent Spent Fuel Storage Installation Security Inspection Report 07200046/2022401 ML22146A2002022-05-24024 May 2022 Submittal of Quality Assurance Program Changes ML22122A2302022-05-24024 May 2022 Approval to Release Class 2 and Class 3 Survey Units from the Part 50 License ML22123A0822022-04-25025 April 2022 Possession-Only License DPR-45 - Financial Statement and Auditors Report ML22068A2102022-04-20020 April 2022 Issuance of Amendment No. 77 Approving Independent Spent Fuel Storage Installation Emergency Plan, Revision 40 ML22108A0562022-03-28028 March 2022 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation ML22084A0092022-03-22022 March 2022 Annual Property Insurance Status Report ML22077A0132022-03-15015 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactor ML22069A1282022-03-0808 March 2022 Lacrossesolutions, LLC, La Crosse Boiling Water Reactor (LACBWR) Annual Radiological Environmental Operating Report, Supplemental Letter ML22062B0362022-02-28028 February 2022 Annual Radiological Environmental Operating Report ML22033A1472022-01-26026 January 2022 Submittal of Decommissioning Plan and Post-Shutdown Decommissioning Activities Report, and License Termination Plan Changes ML22031A1162022-01-26026 January 2022 CFR 50.59 I 10 CFR 72.48 Report of Changes, Tests, and Experiments IR 05000409/20210012022-01-0707 January 2022 NRC Inspection Report No. 05000409/2021-001 La Crosse Boiling Water Reactor 2024-09-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML21189A2022021-03-0808 March 2021 Enclosure 1: Description and Evaluation of Changes ML21105A0332021-03-0808 March 2021 ISFSI Emergency Plan License Amendment Request - Public ML18331A0252018-11-15015 November 2018 Enclosure 2 - Replacement License Amendment Request and Revised License Condition Pages ML18184A4442018-06-27027 June 2018 Lacrossesolutions, LLC - Application for Order Approving License Transfer and Conforming Administrative License Amendments ML16347A0262016-12-0101 December 2016 Boiling Water Reactor License Termination Plan Update ML16200A0832016-07-27027 July 2016 Boiling Water Reactor, License Amendment Request for the License Termination Plan ML16200A0862016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 2 - Site Characterization, Rev. 0 ML16181A0682016-06-27027 June 2016 Boiling Water Reactor Request for Partial Site Release ML16200A0852016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 1 - General Information, Rev 0 ML16200A0932016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 6 - Compliance with the Radiological Criteria for License Termination, Rev. 0 ML16200A0912016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 8, - Supplement to the Environmental Report, Rev 0 ML16200A0892016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 5 - Final Radiation Survey Plan, Rev. 0 ML16200A0882016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 4 - Remediation Plan, Rev. 0 ML16200A0872016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 3 - Identification of Remaining Site Dismantlement Activities, Rev. 0 ML16200A0902016-06-27027 June 2016 Boiling Water Reactor License Termination Plan - Chapter 7, Redacted - Update of the Site-Specific Decommissioning Costs, Rev. 0 ML15307A3102015-10-0808 October 2015 Dairyland Power Cooperative, Submittal of Application for Order Approving License Transfer and Conforming Administrative License Amendments ML13280A2892013-09-30030 September 2013 Dairyland Power Cooperative, Changes to LACBWR Controlling Documents ML13220A9532013-08-0606 August 2013 Dairyland Power Cooperative, License Amendment Request for Proposed Revision to LACBWR Emergency Plan ML12362A0212012-12-10010 December 2012 Dairyland Power Cooperative - License Amendment Request Following Completion of Dry Cask Storage ML0924704592009-07-28028 July 2009 Boiling Water Reactor Request for Amendment to 10 CFR 50, Possession-Only License in Support of Dry Cask Storage Project ML0602303522006-01-12012 January 2006 1/12/2006 Ltr from R.E. Christians/Dpc to P. Schmidt/Wi Notification of License Amendment Request ML0600403012005-12-13013 December 2005 Dairyland Power Cooperative - Lacrosse Boiling Water Reactor - Possession-Only - License Amendment Request 2021-03-08
[Table view] |
Text
DAIRYLAND POWERCOOPERATIVE AIR'C19ockelAlo.
50-4409TO: NRC-DOCUMENT CONTROL DESK CONTROLLED DISTRIBUTION NO. 53FROM:LACBWR Plant Manager9/30/2013
SUBJECT:
Changes to LACBWR Controlling Documents I. The following documents have been revised or issued new.TECHNICAL SPECIFICATIONS Amendment No. 72 to Possession-Only License No. DPR-45 for the La Crosse BoilingWater Reactor dated January 25, 2011, in response to DPC's application of December 13,2005.This amendment revises the LACBWR Technical Specification (TS), in support of thedry cask storage project at LACBWR.Instructions Remove and replace all applicable pages in your Technical Specification binder with theenclosed revised Amendment No. 72 pages. New pages include:REMOVE34Title PageTable of Contents1-12-13-14/5-16-1INSERT34Title PageTable of Contents1-12-13-14/5-16-1o The material listed above is transmitted herewith.
Please verify receipt of all listedmaterial, destroy superseded
- material, and sign below to acknowledge receipt.11 The material listed above has been placed in your binder.o Please review listed material, notify your personnel of changes, and sign below toacknowledge your review and notification of personnel.
[To be checked forsupervisors for department specific procedures and LACBWR Technical Specifications.]
H 2,...... .........
.. -1.o4,SM5A Touchstone Energy Cooperative La Crosse Boiling Water Reactor (LACBWR)
.S4601 State Highway 35
- 608-689-4200 fax o The material listed above has been changed.
[To be checked for supervisors whenmaterials applicable to other departments are issued to them.]/S/ DATEPlease return this notification to the LACBWR Secretary within ten (10) working days.
ATTACHMENT TO LICENSE AMENDMENT NO. 71POSSESSION ONLY LICENSE NO. DPR-45DOCKET NO. 50-409Replace the current pages of License No. DPR-45, with the enclosed revised Amendment No.72 pages. The revised pages are identified by the amendment number and contain marginallines indicating the area of change.REMOVEINSERT3434Replace the current pages of the Appendix A, Technical Specifications, with the enclosedrevised Amendment No. 72 pages. The revised pages are identified by the amendment numberand contain marginal lines indicating the area of change.REMOVEINSERTTitle PageTable of Contents1-1.2-13-14/5-16-1Title PageTable of Contents1-12-13-14/5-16-1Attachment (3) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as were produced by the prioroperation of the facility.
A. This license shall be deemed to contain and is subject to the conditions specified inthe following Commission regulations in 10 CFR Chapter I; Part 20, Section 30.34 ofPart 30, Section 40.41 of Part 40, Sections 50.54 and 50. 59 of Part 50, and Section70.32 of Part 70; and is subject to all applicable provisions of the Act and to therules, regulations and orders of the Commission now or hereafter in effect; and issubject to the additional conditions specified or incorporated below:(1) Maximum Power LevelThe licensee is not authorized to operate the reactor.
Fuel may not be placed in thereactor vessel.(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised throughAmendment No. 72, are hereby incorporated in the license.
The licensee shallpossess and maintain the facility in accordance with the Technical Specifications.
(3) Physical Protection The licensee shall fully implement and maintain in effect all provisions of theCommission-approved physical
- security, guard training and qualification, andsafeguards contingency plans including amendments made pursuant to provisions ofthe Miscellaneous Amendments and Search Requirements revision to 10 CFR 73 55(51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR50.54(p).
The plan, which contains Safeguards Information protected under 10 CFR73.21, is entitled, "Physical Security Plan for La Crosse Boiling Water Reactor(LACBWR),"
as revised and reflecting exemptions from 10 CFR 73.55 granted June20, 2012).(4) Fire Protection The licensee shall implement and maintain in effect all provisions of the facility FireProtection Program as described therein and as approved by the NRC.The licensee may make changes to the approved Fire Protection Program withoutprior NRC approval if these changes do not decrease the effectiveness of fireprotection for facilities,
- systems, and equipment which could result in a radiological hazard, taking into account the decommissioning plant conditions and activities.
Amendment No. 72 B. This Possession only license supersedes and terminates in their entirety changes tothe license issued in License Amendments:
No. 17, July 27, 1979; No. 56, August 4,1987; No. 61, May 18, 1988; No. 63, August 18, 1988; No. 66, August 7, 1991;and No. 69, April 11, 1997.C. This amended license is effective 30 days from the date of issuance and shall expireat midnight, March 29, 2031.FOR THE NUCLEAR REGULATORY COMMISSION Seymour H. Weiss, DirectorNon-Power Reactors and Decommissioning Project Directorate Division of Reactor Project Management Office of Nuclear Reactor Regulation
Attachment:
Appendix A -Technical Specifications Date of Issuance:
April 11, 1997Amendment No. 72 DAIRYLAND POWER COOPERATIVE DOCKET NO. 50-409LA CROSSE BOILING WATER REACTOR(LACBWR)POSSESSION ONLY LICENSEAPPENDIX ATECHNICAL SPECIFICATIONS License No. DPR-45Amendment No. 72 TABLE OF CONTENTS1.2.3.4/5.6.PAGED E F IN IT IO N S ..............................................................................................................
1-1DESIGN FEATURES
...................................................................................................
2-12 .1 S IT E .......................................................................................................................
2 -12.2 FUEL STORAGE ...................................................................................................
2-1APPLICABILITY
...........................................................................................................
3-1PERFORMANCE REQUIREM ENTS .........................................................................
4/5-1ADM INISTRATIVE CONTROLS
..................................................................................
6-1LACBWR TSAmendment 72
- 1. DEFINITIONS THIS SECTION DELETED IN ITS ENTIRETYLACBWR TS1-1Amendment 72
- 2. DESIGN FEATURES2.1 SITEThe facility is located in Vernon County, Wisconsin, on the east bank of the Mississippi River, approximately one mile south of Genoa, Wisconsin, as described in LicenseCondition 2.A.2.2 FUEL STORAGEA maximum of 333 spent fuel assemblies from the La Crosse Boiling Water Reactor arestored in 5 dry casks within an Independent Spent Fuel Storage Installation (ISFSI).Spent fuel assemblies shall not be placed in the spent fuel pool.LACBWR TS2-1Amendment 72
- 3. APPLICABILITY THIS SECTION DELETED IN ITS ENTIRETYLACBWR TS3-1Amendment 72 4/5. PERFORMANCE REQUIREMENTS THIS SECTION DELETED IN ITS ENTIRETY ILACBWR TS4/5-1Amendment 72
- 6. ADMINISTRATIVE CONTROLSTHIS SECTION DELETED IN ITS ENTIRETYLACBWR TS6-1Amendment 72