Kewaunee Power Station - Status Report for Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML14064A198
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/24/2014
From: Sartain M D
Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
12-160D, EA-14-049
Download: ML14064A198 (5)


Text

Dominion Energy Kewaunee, Inc.5000 Dominion Boulevard, Glen Alien, VA 23060Web Address:

www.dom.com February 24, 201410 CFR 2.202EA-12-049 Attention:

Document Control Desk Serial No.: 12-160DU.S. Nuclear Regulatory Commission NL&OS/MAE:

R1Washington, D.C. 20555-0001 Docket No.: 50-305License No.: DPR-43DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION (KPS)STATUS REPORT FOR ORDER MODIFYING LICENSES WITH REGARD TOREQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS (ORDER NUMBER EA-12-049)

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (the Order) to Dominion Energy Kewaunee, Inc. (DEK). DEK responded to the Order by letters dated March 26, 2012, October 25,2012, February 28, 2013, and August 23, 2013 (Serial Nos.12-160, 12-160A, 12-160B,and 12-160C, respectively).

On May 7, 2013 KPS was permanently shut down. The certification of permanent removal of the fuel from the reactor vessel was submitted to the NRC on May 14, 2013(Serial No.13-293).

Therefore, pursuant to 10 CFR 50.82(a)(2),

the 10 CFR Part 50license for KPS no longer authorizes operation of the reactor or emplacement orretention of fuel in the reactor vessel.In accordance with Section IV, Condition C.2, of the Order, DEK is required to submitstatus reports at six (6)-month intervals following submittal of the overall integrated plan(which was submitted on February 28, 2013). This letter fulfills that requirement.

DEK'sAugust 23, 2013 letter requested that the NRC rescind the Order in its entirety, andseparately committed to enhance existing strategies related to SFP makeup. Therescission request for the Order is currently being reviewed by the NRC. The status ofthe enhancement of existing strategies related to SFP makeup is provided in theattachment to this letter.46/l Serial No. 12-160DDocket No.:50-305 Order EA-12-049 Page 2 of 3If you have any questions, please contact Ms. Margaret Earle at (804) 273-2768.

Sincerely, WIZ4"i -Mark D. SartainVice President

-Nuclear Engineering Dominion Energy Kewaunee, Inc. VICK/L. HULLNotary PublicCommonwealth of Virginia140542COMMONWEALTH OF VIRGINIA

)My Commission Expires May 31. 2014COUNTY OF HENRICO )The foregoing document was acknowledged before me today, in and for the County andCommonwealth aforesaid, by Mark D. Sartain who is Vice President

-NuclearEngineering for Dominion Energy Kewaunee, Inc. He has affirmed before me that he isduly authorized to execute and file the foregoing document in behalf of the Company,and that the statements in the document are true to the best of his knowledge andbelief.Acknowledged before me thisA :day of A 2014.My Commission Expires:

Z1. JNotary PublicAttachment Commitments made by this letter: None Serial No. 12-160DDocket No.:50-305 Order EA-12-049 Page 3 of 3cc: Director of Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint NorthMail Stop 13H16M11555 Rockville PikeRockville, MD 20852-2738 U. S. Nuclear Regulatory Commission, Region IIIRegional Administrator 2443 Warrenville RoadSuite 210Lisle, Illinois 60532-4352 Mr. Christopher

Gratton, Project ManagerU. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-Dl 511555 Rockville PikeRockville, MD 20852-2738 Mr. William C. Huffman Jr., Project ManagerU. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-D1511555 Rockville PikeRockville, MD 20852-2738 Mr. Theodore Smith, Project ManagerU. S. Nuclear Regulatory Commission Two White Flint North, Mail Stop 8-F511545 Rockville PikeRockville, MD 20852-2738 Ms. J. A. Kratchman U. S. Nuclear Regulatory Commission One White Flint NorthMail Stop 09 D211555 Rockville PikeRockville, MD 20852-2738 Serial No. 12-160DDocket No. 50-305Attachment Update Regarding Enhanced Strategies for Spent Fuel Pool Makeup UpdateOrder Modifying Licenses with Regard to Mitigation Strategies for Beyond-Design-Basis External EventsKewaunee Power StationDominion Energy Kewaunee, Inc.

Serial No. 12-160DDocket No. 50-305Attachment, Page 1 of 1Enhanced Strategies for Spent Fuel Pool Makeup UpdateDominion Energy Kewaunee, Inc. (DEK) committed to enhance existing strategies related to spent fuel pool (SFP) makeup in Attachment 2 of an August 23, 2013 letter(Serial No. 12-160C).

These commitments were made separate from Order EA-12-049.

The enhanced strategies are scheduled to be complete by the end of 2014. A status ofthe commitments associated with the enhanced strategies is provided below.Number Commitment StatusMitigation strategies will be met with one A portable diesel driven pump andpiece of equipment on site and a 120 VAC diesel generator have beenredundant piece of equipment available purchased.

from another unaffected fleet powerstation.

This equipment will be stored inexisting plant structures.

Procedures will provide programmatic controls forthe strategies.

Support Guidelines will be developed in Support guidelines are being2 conjunction with development of developed and will be issued by theprocedures to support the permanently end of 2014.defueled condition of the plant.Modifications Installation of the new 120 VAC" New 120VAC disconnect/receptacle disconnect/

receptacle with cable towith cables and cable trays. attach to the portable diesel generator

" New permanent hard-pipe is complete.

connection and valves, in the SWemergency SFP makeup injection Modifications to install a hard pipeline. connection for make-up to the SFP and3

  • New access opening in the steel install an access opening through theplate covering the access port in the Aux Building wall are being developed.

north AB wall to the SFP heat The access point will likely move fromexchanger room. the steel plate in the SFP heatexchanger room to a new penetration in the wall at ground level. Installation of these modifications is expected tobe complete by the end of 2014.Portable battery-powered lights will be Portable battery powered lights havestaged in seismically designed brackets been purchased and the mountingnear the areas where responders would brackets fabricated.

Installation of thetake actions and plugged into power lights is expected to be complete byoutlets to keep the batteries charged.

the end of the third quarter 2014.