MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24136A1952024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24130A0022024-05-0909 May 2024 Summary of Facility Changes, Tests and Experiments and Commitment Changes IR 05000305/20240012024-05-0202 May 2024 NRC Inspection Report No. 05000305/2024001 ML24121A2472024-04-29029 April 2024 and Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24101A0422024-04-22022 April 2024 Solutions Inc. – Exemption from Select Requirements of 10 CFR Part 73 ((Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24106A0492024-04-15015 April 2024 2023 Annual Radioactive Effluent Release Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML24079A0162024-03-19019 March 2024 Annual Property Insurance Status Report ML24073A2312024-03-13013 March 2024 and Three Mile Island Nuclear Station, Unit 2 - Management Change ML24061A0202024-02-15015 February 2024 (Ksp) ISFSI, Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 6 ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1002023-10-0505 October 2023 Response to Request for Additional Information (RAI) Application for Kewaunee Solutions (Ks) Site Restoration Activities ML23222A1522023-08-29029 August 2023 Letter RAI KPS Exemption Site Restoration Final Repaired IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station ML23171B0822023-07-0505 July 2023 Letter - Kewaunee Power Station - Issuance of Exemption from Certain Requirements from 10 CFR Part 20, Appendix G, Section Iii.E ML23132A0012023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report ML23116A2182023-04-26026 April 2023 2022 Annual Radioactive Effluent Release Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23093A0312023-03-29029 March 2023 Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities ML23088A2752023-03-29029 March 2023 Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23087A0402023-03-27027 March 2023 Annual Property Insurance Status Report ML23087A0292023-03-27027 March 2023 2022 Annual Report of Occupational Radiation Exposure ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) Kewaunee Power Station ML22292A2302022-11-25025 November 2022 U.S. Nuclear Regulatory Commissions Analysis of Dominion Energy Kewaunees Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML22290A0052022-10-13013 October 2022 Resubmittal of Kewaunee Power Station Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep) and IOEP- Emergency Action Level (EAL) Basis Document, Revision 0KS ML22241A0302022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 5 ML24061A0182022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Pla11, Training and Qualification Plan and Safeguards Contingency Plan Revision 5 IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station ML22215A1512022-07-27027 July 2022 Executed Financial Assurance Instruments for the Kewaunee License Transfer License No. DPR-43 (Docket Nos. 50-305, 72-64) ML22209A1252022-07-26026 July 2022 Amendment No. 11 to Indemnity Agreement No. B-53 for Kewaunee Power Station (KPS) - Signed by Kewaunee Solutions, Inc ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 ML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction ML22175A0662022-06-17017 June 2022 Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML22138A2552022-05-10010 May 2022 Submittal of 2021 Annual Radiological Environmental Operating Report ML22158A2112022-05-10010 May 2022 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML22091A1892022-04-0101 April 2022 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report ML22108A0352022-04-0101 April 2022 License Transfer to Kewaunee Solutions, Inc ML22089A2432022-03-30030 March 2022 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation 2024-09-18
[Table view] Category:Status Report
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML21084A8002021-03-25025 March 2021 Decommissioning Funding Status Report, Financial, Test and Independent Public Accountants' Letter of Attestation ML16088A0892016-03-24024 March 2016 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML14064A1992014-02-24024 February 2014 Status Report for Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML14064A1982014-02-24024 February 2014 Status Report for Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML1109003752011-03-29029 March 2011 Decommissioning Funding Status Report ML1009102132010-03-30030 March 2010 Submittal of Decommissioning Funding Status Report L-HU-05-008, Decommissioning Funding Status Reports2005-03-31031 March 2005 Decommissioning Funding Status Reports ML0409704932004-03-31031 March 2004 Decommissioning Funding Status Report ML0329009652003-10-16016 October 2003 Decommissioning Funding Status Reports - Supplemental Response for Duane Arnold, Kewaunee, Monticello, Palisades, Point Beach, Units 1 and 2, and Prairie Island, Units 1 and 2 ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report 2024-09-18
[Table view] |
Text
Dominion Energy Kewaunee, Inc.
5000 Dominion Boulevard, Glen Alien, VA 23060 Web Address: www.dom.com February 24, 2014 10 CFR 2.202 EA-12-049 Attention: Document Control Desk Serial No.: 12-160D U.S. Nuclear Regulatory Commission NL&OS/MAE: R1 Washington, D.C. 20555-0001 Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.
KEWAUNEE POWER STATION (KPS)
STATUS REPORT FOR ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS (ORDER NUMBER EA-12-049)
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA 049, "Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (the Order) to Dominion Energy Kewaunee, Inc. (DEK). DEK responded to the Order by letters dated March 26, 2012, October 25, 2012, February 28, 2013, and August 23, 2013 (Serial Nos.12-160, 12-160A, 12-160B, and 12-160C, respectively).
On May 7, 2013 KPS was permanently shut down. The certification of permanent removal of the fuel from the reactor vessel was submitted to the NRC on May 14, 2013 (Serial No.13-293). Therefore, pursuant to 10 CFR 50.82(a)(2), the 10 CFR Part 50 license for KPS no longer authorizes operation of the reactor or emplacement or retention of fuel in the reactor vessel.
In accordance with Section IV, Condition C.2, of the Order, DEK is required to submit status reports at six (6)-month intervals following submittal of the overall integrated plan (which was submitted on February 28, 2013). This letter fulfills that requirement. DEK's August 23, 2013 letter requested that the NRC rescind the Order in its entirety, and separately committed to enhance existing strategies related to SFP makeup. The rescission request for the Order is currently being reviewed by the NRC. The status of the enhancement of existing strategies related to SFP makeup is provided in the attachment to this letter.
46/l
Serial No. 12-160D Docket No.:50-305 Order EA-12-049 Page 2 of 3 If you have any questions, please contact Ms. Margaret Earle at (804) 273-2768.
Sincerely, WIZ4"i -
Mark D. Sartain Vice President - Nuclear Engineering Dominion Energy Kewaunee, Inc. VICK/L. HULL Notary Public Commonwealth 140542of Virginia COMMONWEALTH OF VIRGINIA )My Commission Expires May 31. 2014 COUNTY OF HENRICO )
The foregoing document was acknowledged before me today, in and for the County and Commonwealth aforesaid, by Mark D. Sartain who is Vice President - Nuclear Engineering for Dominion Energy Kewaunee, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of the Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me thisA :day of A 2014.
My Commission Expires: Z1. J Notary Public Attachment Commitments made by this letter: None
Serial No. 12-160D Docket No.:50-305 Order EA-12-049 Page 3 of 3 cc: Director of Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 13H16M 11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission, Region III Regional Administrator 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Mr. Christopher Gratton, Project Manager U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-Dl 5 11555 Rockville Pike Rockville, MD 20852-2738 Mr. William C. Huffman Jr., Project Manager U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-D15 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Theodore Smith, Project Manager U. S. Nuclear Regulatory Commission Two White Flint North, Mail Stop 8-F5 11545 Rockville Pike Rockville, MD 20852-2738 Ms. J. A. Kratchman U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 D2 11555 Rockville Pike Rockville, MD 20852-2738
Serial No. 12-160D Docket No. 50-305 Attachment Update Regarding Enhanced Strategies for Spent Fuel Pool Makeup Update Order Modifying Licenses with Regard to Mitigation Strategies for Beyond-Design-Basis External Events Kewaunee Power Station Dominion Energy Kewaunee, Inc.
Serial No. 12-160D Docket No. 50-305 Attachment, Page 1 of 1 Enhanced Strategies for Spent Fuel Pool Makeup Update Dominion Energy Kewaunee, Inc. (DEK) committed to enhance existing strategies related to spent fuel pool (SFP) makeup in Attachment 2 of an August 23, 2013 letter (Serial No. 12-160C). These commitments were made separate from Order EA-12-049.
The enhanced strategies are scheduled to be complete by the end of 2014. A status of the commitments associated with the enhanced strategies is provided below.
Number Commitment Status Mitigation strategies will be met with one A portable diesel driven pump and piece of equipment on site and a 120 VAC diesel generator have been redundant piece of equipment available purchased.
from another unaffected fleet power station. This equipment will be stored in existing plant structures. Procedures will provide programmatic controls for the strategies.
Support Guidelines will be developed in Support guidelines are being 2 conjunction with development of developed and will be issued by the procedures to support the permanently end of 2014.
defueled condition of the plant.
Modifications Installation of the new 120 VAC
" New 120VAC disconnect/receptacle disconnect/ receptacle with cable to with cables and cable trays. attach to the portable diesel generator
" New permanent hard-pipe is complete.
connection and valves, in the SW emergency SFP makeup injection Modifications to install a hard pipe line. connection for make-up to the SFP and 3
- New access opening in the steel install an access opening through the plate covering the access port in the Aux Building wall are being developed.
north AB wall to the SFP heat The access point will likely move from exchanger room. the steel plate in the SFP heat exchanger room to a new penetration in the wall at ground level. Installation of these modifications is expected to be complete by the end of 2014.
Portable battery-powered lights will be Portable battery powered lights have staged in seismically designed brackets been purchased and the mounting near the areas where responders would brackets fabricated. Installation of the take actions and plugged into power lights is expected to be complete by outlets to keep the batteries charged. the end of the third quarter 2014.