ML17056B314

From kanterella
Revision as of 22:08, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Revised Monthly Operating Rept for May 1989 for Nine Mile Point Nuclear Station Unit 1
ML17056B314
Person / Time
Site: Nine Mile Point 
Issue date: 05/31/1989
From: DAHLBERG K A
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200129
Download: ML17056B314 (2)


Text

OPERATING STATUSOPERATING DATAREPORTDOCKETNO.:50-220DATE:1/31/91COMPLETED BY:K.A.DahlbergTELEPHONE:

(315)349-24431.UnitName:NineMilePointUnit//12.Reporting Period:5/1/89through5/31/893~LicensedThermalPower(MWt):18504.Nameplate Rating(GrossMWe):6405.DesignElectrical Rating(NetMWe):6206.MaximumDependable Capacity(GrossMWe):6307.MaximumDependable Capacity(NetMWe):6108.IfChangesOccurinCapacityRatings(ItemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr-to-Date Cumulative 11.HoursinReporting Period12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6MonthsRefueloutaestartedonanunr22I744.00.00.00.00.00.00.00.00.00.00.00.0100.0(Type,DateandDurationofEach):88.3,623.00.00.00.00.00.00.00.00.00.00.00.0100.0172,752.2 115,234.3 1,204.2112,117.2 20.4188,473,132.0 62)473p070 060,524,382.0 64.964.957.456,520.826.UnitisTestStatus(PriortoCommercial Operation):

ForecastAchievedIN1TIALCR1TICAL1TY INlTIALELECTRIC1TY COMMERCIAL OPERATION 9102200129'50QQ22Q pP10207pDR"ADOCKPDRR 4lgPyl