ML17255A518

From kanterella
Revision as of 13:58, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Rev 0 to Procedure A-101, Ginna QA Program Implementation.
ML17255A518
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/02/1981
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17255A515 List:
References
A-101, NUDOCS 8311150373
Download: ML17255A518 (4)


Text

1ATTACHMENT 3ROC'"ST:-RGBZ:.-'~%)

=:-CRICCORPORATION G~iAST%~ONCOiVVROLLW COPY'.ii~BWQOM:"i=DDAir'.-TIME:-PROCWUR='tO.<~l~tO0GINNAQUALITYASSURANCE PROGRAMIMPLEMENTATION T=C-KC.MiR~i".vQ.A.REVIEWQ.ga-y-~gPORC5/29/790/CR"zx..~41APPRO'7Z:.OR USE/z/wjP/i.~~'.iO:i'3kC%rQvRr~iHU~()iIVrlkrIrIROCK::-"C'~':.Sa4~lI~vrrrrr'ri~rIr7I~Q~J~83iii50373 83ii04PDRADOCK05000244PPDR 441 A-101GINNAQUALITYASSURANCE PROGRAMIMPLEMENTATION 1.0PURPOSE:Toprovideinstructions fortheimplementation oftheQualityAssurance ProgramatGinnaStation.2.02.12.22.32.

42.5REFERENCES

QualityAssurance Manual,AppendixA.QualityAssurance Manual,AppendixD.QualityControlProcedure, A-501.QualityControlProcedure, A-502.QualityControlProcedure A-203.3.0INSTRUCTIONS:

3.1TheGinnaQualtiyAssurance Programrequirements asoutlinedintheQualityAssurance Manualshallbeimplemented throughplantadministra-tiveprocedures.

3.1.1A1XXthroughA18XXseriesofadministrative procedures paralleltheeighteensectionsoftheQualityAssurance Manual.3.1.23.2Administrative Procedures aredeveloped andcontrolled inaccordance withReferences 2.3and.4.'heQualityAssurance ProgramatGinnaStationshallapplytoactivi-tieswhichaffectthesafetyrelatedfunctions ofallexistingSeismicClassIstructures, systems,andcomponents, including theirfounda-tionsandsupports.

Thesestructures, systems,andcomponents shallbethosedesignated intheGinnaStationFSARandlistedinReference 2.1.3.2.1Inaddition, theQualityAssurance ProgramatGinnaStationshallbeappliedtotheportionsofthefireprotection programaslistedinReference 2.2.3.2.2TheQualityAssurance Programalsoappliestoshippingoflicensedradioactive materials asdefinedin10CFR71.3.3Foractivities associated withimplementation ofmodifications atGinnaStation,theGinnaStationorganization iscomplemented bytheGinnaModification ProjectOrganization asdescribed inReference 2.5.Theadministrative procedure described in3.1.1shallbeused,asapplicable, toimplement modification projectactivities.

4.0((4.1RECORDS:Noae