Rev 3 to Procedure PT-47.11, Containment Post Accident Charcoal Filter Unit Efficiency Test.ML17264A208 |
Person / Time |
---|
Site: |
Ginna |
---|
Issue date: |
03/09/1994 |
---|
From: |
ROCHESTER GAS & ELECTRIC CORP. |
---|
To: |
|
---|
Shared Package |
---|
ML17264A201 |
List: |
---|
References |
---|
PT-47.11, NUDOCS 9510260348 |
Download: ML17264A208 (13) |
|
Similar Documents at Ginna |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements 1999-06-28
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML20140B8291997-03-24024 March 1997 Rev 3 to EOP ATT-12.0, Attachment N2 Porvs ML17264A8221997-02-0606 February 1997 Rev 15 to FR-P.1, Response to Imminent Pressurized Thermal Shock Condition. ML17264A8201997-02-0606 February 1997 Rev 7 to AP-RCC.2, Rcc/Rpi Malfunction. ML17264A8081997-01-23023 January 1997 Revised Emergency Operating Procedures,Including Rev 14 to E-1,Rev 19 to E-3,Rev 14 to ECA-2.1,Rev ECA-3.3,Rev 20 to ES-1.3,Rev 13 to FR-C.1,Rev 12 to FR-C.2 & Rev 14 to FR-P.1 ML20133N3351997-01-10010 January 1997 Rev 7 to FR-C.3, Response to Saturated Core Cooling ML17264A8881996-10-10010 October 1996 Rev 9 to ODCM for Ginna Station. ML20128N0681996-10-0303 October 1996 Revised Emergency Operating Procedures,Including Rev 5 to Att-10.0, Attachment Faulted S/G & Rev 6 to Att-16.0, Attachment Ruptured S/G ML17264A5311996-05-31031 May 1996 Revised Emergency Operating Procedures,Including Rev 10 to AP-RCP.1,Rev 12 to ECA-0.1,Rev 12 to ECA-2.1,Rev 3 to FR-H.2,Rev 3 to FR-H.4,Rev 7 to FR-I.1,Rev 12 to FR-P.1,Rev 10 to FR-S-1 & Rev 6 to FR-S.2 ML17264A5161996-05-22022 May 1996 Rev 2 to Technical Requirements Manual (TRM) ML17264A4581996-04-0808 April 1996 Rev 7 to ODCM for Ginna Station. ML17264A4371996-04-0101 April 1996 Rev 1 to Technical Requirements Manual (TRM) ML17264A4391996-04-0101 April 1996 Rev 1 to Updated Technical Requirements Manual (TRM) ML17264A4191996-02-24024 February 1996 Rev 0 to Technical Requirements Manual (Trm). ML17264A6901996-02-23023 February 1996 Rev 0 to Inservice Testing Program. 1999-05-12
[Table view] |
Text
ROCHESTER GASANDELECTRICCORPORATION GINNASTATIONCONTROLLED COPYNUMBERPROCEDURE NO.PT-47.11REV.NO.3CONTAINMENT POSTACCIDENTCHARCOALFILTERUNITEFFICIENCY TESTTECHNICAL REVIEWPORCREVIEWDATEPLANTSUPERINTENDENT EFFECTIVE DATECATEGORY1.0REVIEWEDBY:THISPROCEDURE CONTAINS11PAGES6INNASTATIONSTART:IllMECOMPLETED:
DATETIVE'9510260348 951018PDRADQCK05000244P..,PDR.
PT-47.11:1 PT-47.11CONTAINNENT POSTACCIDENTCHARCOALFILTERUNITEFF1CIENCY TEST1.0PURPOSE:Toprovideteststepsforsurveillance halideleaktestingoftheinstalled "CHARCOAL" adsorberbanktoensurethattherearenoleaksgreaterthanthatallowedbysystemacceptance criteria.
2.0 TESTREUIREMENTS
2~1Thistestshallbeperformed every18monthsorafter720hoursofcharcoaladsorbersystemoperation, sinceprevioustest,orfollowing
- painting, fire,orchemicalrelease,intheareacommunicating withtheairhandlingunitandshallhavethefollowing conditions demonstrated.
2.1.12~1.2~~Pressuredropacrossthe"CHARCOAL" adsorberbankshallbe<3"H20atdesignflowrate,(+104).In-place"HALIDE"(Freon)leaktesting,undernormaloperating conditions, shallshow>99%removalefficiency.
2.1.3Every12months,a"CHARCOAL" sampleshallberemovedfromanadsorbercell,randomlyselectedfromthosecellswiththelongestin-bankresidence timeor"TESTCANISTER(S)"
shallberemoved,andsenttoalaboratory foran"IODINEREMOVALEFFICIENCY TEST".Theefficiency shallbeatleast90%removalforiodine.2'2.3Aftereachreplacement ofa"CHARCOAL" adsorbercellorafteranystructural maintenance performed ontheadsorbermountingframesoftheunit,theefficiency specified instep2.1.2,shall'edemonstrated.
Visualinspection of"CHARCOAL" adsorbercellassemblies fordamageandlossofcharcoalshallbeperformed.
3.0F1
REFERENCES:
PlantTech.Specs.-Section4.5.2.3inclusive.
PT-47.11'2 3.23.33.43.5.63'3.8ANSI/ASME N510-1980 (TestingofNuclearCleaningSystems).
NUCON-Vendor.RGGEVentilation SystemFlowDiagramf33013-1863.
Previously procedure PT-29.3(1987).A-1102,Qualification ofTestPersonnel.
A-1603.1, WorkRequest/Trouble ReportInitiation.
PT-38.1,VisualInspection ofCharcoalFilterTrayAssemblies
.3.93:10A-1408,Independent Verification Procedure.
A-805,ControlofConsumable Materials at,GinnaStationProcedure.
4.0 INITIALCONDITIONS
NOTEIfpreparatory workwillbeperformed priortovendorarrival,markstep4.1N/A.4.1Vendordocumentation requiredbytheapplicable purchaseorderhasbeensubmitted toQCDept.andfoundacceptable priortostartofwork.QC4.2Plantshallbeatcoldshutdown.
4.3RGGEtestpersonnel arequalified inaccordance withA-1102.4'Visualinspection of"CHARCOAL" adsorbercellassemblies shallbecompleted perPT-38.1.4.5NotifyShiftSupervisor andHeadControlOperatoratstartanduponcompletion oftest.4.6Whenmassairflowthru"CHARCOAL" bankhasbeendetermined, logonapplicable vendor's"IN-TEST" datasheet.
PT-47.11:3 4.74.7~1Thisprocedure isdividedintothefollowing sections.
Initialwhichsection(s) applyandmar'kremainder N/A.Removalof"CHARCOAL" AdsorberCellorTestCanisterforIodineRemovalEfficiency Testing(Section6.2).4.7.2CharcoalAdsorberBankTesting-Halide(Section6.3).4.7.3FilterBankRemovalandReplacement (Section6.4).4.8Preparetesttagsforthefollowing:
POSITIONPRIORTOTESTPOSITIONREQUIREDFORTEST:4.8.14.8.24.8.34.8.44.91-AContmnt.Recirc.FanUnitSwitch:!'sRequired" 1-BContmnt.Recirc.FanUnitSwitch:"AsRequired" 1-CContmnt'.
Recirc.FanUnitSwitch:"AsRequired" 1-DContmnt.Recirc.FanUnitSwitch:"AsRequired" NotifyHPDept.thatsystemwillbeshutdowntofacilitate entryintounitforinspection andtestpreparation.
4.104'1SWPhasbeenissued.Ifadiscrepancy requiring maintenance isfound,submitaWR/TRtocorrecttheproblem.4.12The"A"and"C"Containment Recirculation Fansareavailable foroperation andtheirairflowpathsmaybealignedtotheirrespective postaccidentcharcoalfilterbankasdesired.4.13IfonlyoneunitistobetestedmarkotheroneN/A.
O~
PT-47.11:4 4.14Onlythefanunitbeingtestedmaybeinoperation withALLOTHERUNITSin"PULLSTOP"condition.
4.154.16NotifyQCDept.priortostartoftest.NotifyChemicalControltoensure"GinnaStationConsumable MaterialLabels"areavailable tobepostedonallchemicalcontainers usedforthistest.4.16.1ARestricted UsedPermithasbeenissuedforthelistedproducts:
4'6.1.1PRODUCTGERETRONHALIDER-11~PERMIT90:188P5.0PRECAUTIONS:
5.1Radiation protection practices willbeobservedatalltimes.5.25<<35.4Normalcompanyworksafetypractices willbeobserved.
NotifyHPSectionthatHalidewillbeusedtotestthecharcoalunitsandastrongorganicodormaybenoticedintheareasaffectedbythissystem.Propersequential implementation ofeachprocessinthisprocedure, asapproved, isnecessary toensureadherence toA-805,ControlofConsumable Materials atGinnaStation.6.0INSTRUCTIONS:
PA'NIT:"AflBII6.1Ensureassociated fanisshutdown("PULL-STOP" position) andtesttag(s)arehungonfanswitch(es),
beforeenteringplenumunit(MCB)."A"CVRecirc.Fan"PULL-STOP"
~NA<<C<<CVRecirc.Pan"PULL-STOP"
~NA 6.2PT-47.11:5 REMOVALOFCHARCOALADSORBERCELLORTESTCANISTERFORIODINEREMOVALEFFICIENCY TESTING:P.A.UNIT:"A"IIBII6.2.1Remove"CHARCOAL" adsorbercellor"TESTCANISTER(S)"
fromfilterbanktoobtaincharcoalsampleforlaboratory testingandreplacewithapprovedsame.Labelnewlyinstalled charcoal'cell/test canisterfaceplate, toreflectreplacement date.I6.2.2Adsorbercelllocation.
(N/Aifnon-applicable).
1-AP.A.Unit:1-BP.A.Unit:6.2.3Testcanister(s) location.
(N/Aifnon-applicable).
1-AP.A.Unit:1-BP.A.Unit:6.2.4Ensureadsorbercellortestcanister(s) replacedis/arerestoredtooperating condition.
6.3CHARCOALADSORBERBANKTESTING-HALIDE:NOTE:Ifstep4.1wasperformed, markstep6.3.1N/A.6.3.16.3.2Vendordocumentation requiredbytheapplicable purchaseorderhasbeensubmitted toQCDept.andfoundacceptable priortostartofwork.QCStartassociated containment recirc.fanunitforcharcoalbankundergoing test."A"Fanfor"A"P.A.Bank"C"Fanfor"B"P.A.Bank6.3.3Toproperlyaligndampersoffanunitbeingtestedinthe"POSTACCIDENT" mode,performthefollowing:
PT-47.11:6 P.A.UNIT:"At'tB6.3.3.1"A"P.A.unit("A"CVRecirc.Fan)-Pressinarmaturerelay"CF1A-L",
rackRA2,RelayRoom.6.3.3.2"B"P.A.Unit("C"CVRecirc.Fan)-Pressinarmaturerelay"CF1C-L",
rackRA3,RelayRoom.6.3.46.3.4.1Verifythefollowing fortheassociated fan:NormalLoopEntryDamperClosed(LED).6'.4.2CharcoalBankInletDamperOpen(CID).6.3.4.3CharcoalBankOutletDamperOpen(COD).6.3.56~3~5.16.3.5.26.3.5.3Ensurethefollowing equipment itemsareavailable:
HalideTracerGas,R-11.HalideDetector.
HalideGenerator.
6.3.6ConnectHalideDetectortopowersupplyandallowapproximately 15minuteswarmuptime.6.3'6.3.8Connectsamplelinestoupstreamanddownstream sampleports.Establish flowthroughsystem.6.3.9Recordpressuredropsacrossfiltersandtransfertoapplicable vendor's"HalideTest"datasheets.6.3.9.1(Max.Allowable (3"H20)H20H20NOTEIfpressuredropsarebeyondallowable limits,investigate andcorrectproblempriortotesting.6.3.10Establish upstreamanddownstream sampleflowsandsetupstreamdilutionairratiosifnecessary, toproduceanupstreamconcentration whichiswithinthelinearresponserangeofthedetector.
PT-47.117P.A.UNIT:"A"6.3.11Takeupstreamanddownstream background readings.
sampleNOTE:Ifthesereadingsshownobackground contaminants thatmightinterfere withtestresults,continuewiththetest.Ifinterference isindicated, purgesystemwithairflowuntilinterference isreducedtoanacceptable level.6.3.126.3.13Startinjection.
MonitorandrecordupstreamanddoWnstream tracergasconcentrations forfiveminutesusingapplicable vendor'sdatasheet.6.3.14Calculate percentefficiency andtransferdatatoappropriate vendor'sdatasheet.EFFICIENCY:
NOTEHalideconcentrations aredetermined byaveraging (4)stabilized readingspreviously recordedondatasheet.6.3.15Ifadiscrepancy requiring maintenance isfound,duetothepercentefficiency obtainedbeinglessthantheallowable limits,submitaWR/TRtocorrecttheproblemassoonaspractical andretest,otherwise markN/A.RETESTEFFICIENCY:
6.3.16'6.3.17Removeallsamplelinesfromports.Replace'll pipecapsorfittingsonunit.6.3.18Tore-aligndampersoffanunitbeingtested,performthefollowing:
6.3.18.1"A"CVRecirc.Fan-Press"RESET"buttonfor"CF1A-L",
RackRA2,RelayRoom.6.3.18.2"C"CVRecirc.Fan-Press"RESET"buttonfor"CF1C-L",
RACKRA3,RelayRoom.
PT-47.11:8 P.A.UNIT:'tAIIBII6.4FILTERBANKREMOVALANDREPLACEMENT:
6.4.1Ensureinstruction 6.1hasbeenperformed priortoenteringplenumunit.6.4.26.4.2.16.4.3Typefilterbankremoved:CHARCOALNumberoffiltercellsremoved:¹6.4.4Replacefiltercellsremovedwithapprovedtype,labelnewlyinstalled charcoalfilterfaceplate toreflectreplacement dateandensurethebankisrestoredtooperating condition.
6.4.5Testsystemutilizing appropriate testsectiontoretainsystemefficiency withinallowable limits.6.5Acopyofthevendor'stestdatashallbeattachedtothisprocedure.
6.6Vendortosubmit,atafuturedate,acomplete,.report oftestresults.6.7Ensurealltesttagshavebeenremovedandtesttaglogreflectsso.6.8NotifyHeadControlOperatorthatsystemtestingiscompleted andsystemmayberestoredtonormaloperating conditions.
~~COMMENTS"A"Unit:COMMENTSnBnUnit:COMPLETED BY(RG&E):(VENDOR):
DATECOMPLETED:
HEADCONTROLOPERATOR:
SHIFTSUPERVISOR:
RESULTS&TESTREVIEW:DATE "A"GVRECRC.FANI~~ISI"A"POSTACCDB4TCHARCOALFLTERSYSTEM"A"POSTACCDENT~~TRAVERSE+1KQ53gal!/ACONTAtAENT RECRC.FAN(POSTACCGENT),
.(NORMAQ5872COOTRAVERSEAlSAM!LEFOWT-FCRMASI!AllFLOWIWASLMSET4T AMIUMITMIMRIOIRIMA!'!MEREST.
VERSE+2-S~'LEPONTFOROOVmeTREAA'H20 AR++,TRAVE!SR3SAMFIEFOWTFCRMAESAMFLOWEASIFMMM j~/kh~y