ML14295A333
Letter Sequence Supplement | |
---|---|
TAC:MF1199, Change in Technical Specifications End States - CE NPSD-1186, Change in Technical Specifications End States - BAW-2441 (Approved, Closed) | |
Initiation Administration | |
MONTHYEAR2CAN031303, License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-422, Revision 2 Change in Technical Specifications End States (CE NPSD-1186)2013-03-26026 March 2013
[Table View]License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-422, Revision 2 Change in Technical Specifications End States (CE NPSD-1186) Project stage: Request 1CAN031306, License Amendment Request, Adoption of Technical Specification Task Force (TSTF)-431, Revision 3 Change in Technical Specifications End States (BAW-2441)2013-03-26026 March 2013 License Amendment Request, Adoption of Technical Specification Task Force (TSTF)-431, Revision 3 Change in Technical Specifications End States (BAW-2441) Project stage: Request ML13182A3332013-07-0101 July 2013 Acceptance Review Email, License Amendment Request to Adopt Technical Specification Task Force (TSTF)-422, Revision 2 Change in Technical Specifications End States (CE NPSD-1186) Project stage: Acceptance Review 1CAN111302, Response to Request for Additional Information ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441)2013-11-14014 November 2013 Response to Request for Additional Information ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441) Project stage: Response to RAI ML13326A3452013-11-22022 November 2013 NRR E-mail Capture - RAI Related to the Adoption of (TSTF)-422, Revision 2 Project stage: RAI 2CAN121303, Response to Request for Additional Information Adoption of Technical Specification Task Force (TSTF)-4222013-12-12012 December 2013 Response to Request for Additional Information Adoption of Technical Specification Task Force (TSTF)-422 Project stage: Response to RAI ML14209A6272014-08-0404 August 2014 Request for Additional Information, Requests to Adopt Technical Specifications Task Force (TSTF)-431, Revision 3, for Unit 1 and TSTF-422, Revision 2 for Unit 2, Change in Technical Specifications End States. Project stage: RAI 0CAN081407, Response to Request for Additional Information Adoption of Technical Specification Task Force TSTF-431, Revision 3 and Adoption of TSTF-422, Revision 2 Regarding Technical Specifications End States2014-08-19019 August 2014 Response to Request for Additional Information Adoption of Technical Specification Task Force TSTF-431, Revision 3 and Adoption of TSTF-422, Revision 2 Regarding Technical Specifications End States Project stage: Response to RAI 2CAN101401, Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)2014-10-22022 October 2014 Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) Project stage: Supplement 2CAN121403, License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186).2014-12-0505 December 2014 License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186). Project stage: Supplement ML15068A3192015-03-31031 March 2015 Issuance of Amendment No. 301, Request to Adopt Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) Project stage: Approval 2013-07-01 |
ML14295A333 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 10/22/2014 |
From: | Browning J G Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
2CAN101401, CE NPSD-1186 | |
Download: ML14295A333 (7) | |
Similar Documents at Arkansas Nuclear | |
---|---|
Category:Letter
MONTHYEARML24295A1202024-10-21021 October 2024
[Table view]Relief Request ANO2-RR-24-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 71 ML24185A2602024-10-0404 October 2024 Issuance of Amendment No. 335 to Revise Typographical Errors in Technical Specifications IR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 IR 05000313/20244042024-08-29029 August 2024 Cybersecurity Inspection Report 05000313/2024404 and 05000368/2024404 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000313/LER-2024-001, Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications2024-07-0101 July 2024 Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) ML24099A1912024-04-0808 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000313/2024404 and 05000368/2024404) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 2024-09-09 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEARML23208A2112023-07-27027 July 2023
[Table view]Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement 1CAN102101, SAR Amendment 30, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2021-10-0606 October 2021 SAR Amendment 30, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report 1CAN092101, License Amendment Request Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2021-09-30030 September 2021 License Amendment Request Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections 1CAN052102, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2021-05-26026 May 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors 2CAN052102, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2021-05-26026 May 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors 1CAN022102, Supplement Related to License Amendment Request to Replace the Reactor Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate2021-02-22022 February 2021 Supplement Related to License Amendment Request to Replace the Reactor Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate 0CAN022102, Unit 2; License Amendment Request - One-Time Change to Support Proactive Upgrade of the Emergency - Cooling Pond Supply Piping2021-02-0808 February 2021 Unit 2; License Amendment Request - One-Time Change to Support Proactive Upgrade of the Emergency - Cooling Pond Supply Piping 2CAN112004, License Amendment Request - Application to Adopt a Safety Function Determination Program (SFDP)2020-11-17017 November 2020 License Amendment Request - Application to Adopt a Safety Function Determination Program (SFDP) 2CAN092003, License Amendment Request, Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2020-09-24024 September 2020 License Amendment Request, Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions 1CAN072001, Supplemental Information Related to License Amendment Request to Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate2020-07-21021 July 2020 Supplemental Information Related to License Amendment Request to Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate 1CAN022001, License Amendment Request: Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate2020-02-24024 February 2020 License Amendment Request: Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate 1CAN012002, License Amendment Request: Revise Loss of Voltage Relay Allowable Values2020-01-24024 January 2020 License Amendment Request: Revise Loss of Voltage Relay Allowable Values 2CAN121903, License Amendment Request, Revise Control Element Assembly Drop Time2019-12-18018 December 2019 License Amendment Request, Revise Control Element Assembly Drop Time 2CAN121901, License Amendment Request Technical Specification Deletions, Additions, and Relocations2019-12-16016 December 2019 License Amendment Request Technical Specification Deletions, Additions, and Relocations 1CAN101903, Supplement to License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2019-10-23023 October 2019 Supplement to License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO 0CAN091901, Unit 2: License Amendment Request - Change in Implementation Date for Amendments 263 and 3142019-09-0505 September 2019 Unit 2: License Amendment Request - Change in Implementation Date for Amendments 263 and 314 2CAN081903, License Amendment Request Technical Specification (TS) Change Related to Revised Fuel Handling Accident Analysis and Adoption of TS Improvements Consistent with NUREG-14322019-08-29029 August 2019 License Amendment Request Technical Specification (TS) Change Related to Revised Fuel Handling Accident Analysis and Adoption of TS Improvements Consistent with NUREG-1432 1CAN051901, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2019-05-29029 May 2019 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. 0CAN041904, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into the Licensing Basis2019-04-29029 April 2019 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into the Licensing Basis 1CAN031901, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2019-03-25025 March 2019 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 1CAN121801, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2018-12-19019 December 2018 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues 2CAN121801, License Amendment Request, Add Actions to Address Inoperability of the Containment Building Sump2018-12-19019 December 2018 License Amendment Request, Add Actions to Address Inoperability of the Containment Building Sump 2CAN051801, License Renewal Pressurizer Surge Line and Safety Injection Nozzle Inspection2018-05-24024 May 2018 License Renewal Pressurizer Surge Line and Safety Injection Nozzle Inspection ML18094A1552018-03-29029 March 2018 Enclosures 2 - 6: Proposed EAL Technical Basis Document, NEI 99-01. Rev. 6., Proposed EAL Matrix Chart/Review Table and Supporting Referenced Document Pages 0CAN031801, Unit 2 - License Amendment Request - Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 62018-03-29029 March 2018 Unit 2 - License Amendment Request - Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 1CAN031801, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-03-12012 March 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) 2CAN121702, License Amendment Request Post-Accident Instrumentation Technical Specification Revision2017-12-14014 December 2017 License Amendment Request Post-Accident Instrumentation Technical Specification Revision 2CAN111702, License Amendment Request - Updating the Reactor Coolant System Pressure-Temperature Limits2017-11-20020 November 2017 License Amendment Request - Updating the Reactor Coolant System Pressure-Temperature Limits 1CAN101701, License Amendment Request Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves2017-10-0202 October 2017 License Amendment Request Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments 1CAN081701, Application to Revise Technical Specifications to Adopt TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability.2017-08-14014 August 2017 Application to Revise Technical Specifications to Adopt TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability. 2CAN081701, Application to Revise Technical Specifications to Adopt TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability.2017-08-14014 August 2017 Application to Revise Technical Specifications to Adopt TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability. 2CAN071701, License Amendment Request, Application for Technical Specification Improvement to Provide Actions for Emergency Feedwater Pump Inoperability Consistent with NUREG-14322017-07-17017 July 2017 License Amendment Request, Application for Technical Specification Improvement to Provide Actions for Emergency Feedwater Pump Inoperability Consistent with NUREG-1432 1CAN071701, License Amendment Request, Application for Technical Specification Improvement to Revise Actions for Inoperable Using the Consolidated Line Item Improvement Process2017-07-17017 July 2017 License Amendment Request, Application for Technical Specification Improvement to Revise Actions for Inoperable Using the Consolidated Line Item Improvement Process 1CAN061701, Amendment 27 of the SAR, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2017-06-0707 June 2017 Amendment 27 of the SAR, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report 1CAN041702, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line.2017-04-24024 April 2017 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line. 2CAN041702, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.2017-04-24024 April 2017 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. 2CAN101601, License Amendment Request to Revise the National Fire Protection Association (NFPA) Standard 805 Modifications2016-10-27027 October 2016 License Amendment Request to Revise the National Fire Protection Association (NFPA) Standard 805 Modifications 1CAN051602, Update to Tables S-1 and S-2 - Adoption of National Fire Protection Association Standard NFPA-8052016-05-19019 May 2016 Update to Tables S-1 and S-2 - Adoption of National Fire Protection Association Standard NFPA-805 2CAN031602, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme..2016-03-25025 March 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme.. 2023-07-27 Category:Technical Specification MONTHYEAR2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications2024-04-0404 April 2024
[Table view]Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement 1CAN102101, SAR Amendment 30, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2021-10-0606 October 2021 SAR Amendment 30, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections 1CAN012002, License Amendment Request: Revise Loss of Voltage Relay Allowable Values2020-01-24024 January 2020 License Amendment Request: Revise Loss of Voltage Relay Allowable Values 2CAN121901, License Amendment Request Technical Specification Deletions, Additions, and Relocations2019-12-16016 December 2019 License Amendment Request Technical Specification Deletions, Additions, and Relocations 1CAN061902, Supplemental Change Related to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2019-06-18018 June 2019 Supplemental Change Related to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues 1CAN031901, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2019-03-25025 March 2019 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. 1CAN111802, ANO Unit 1 SAR Amendment 28, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2018-11-12012 November 2018 ANO Unit 1 SAR Amendment 28, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report 2CAN121705, Exigent License Amendment Request Allowance to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 262017-12-28028 December 2017 Exigent License Amendment Request Allowance to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 26 2CAN111702, License Amendment Request - Updating the Reactor Coolant System Pressure-Temperature Limits2017-11-20020 November 2017 License Amendment Request - Updating the Reactor Coolant System Pressure-Temperature Limits 1CAN031604, Arkansas, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Co2016-03-25025 March 2016 Arkansas, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code 2CAN031602, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme..2016-03-25025 March 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme.. 2CAN121502, Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2015-12-22022 December 2015 Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process 1CAN121403, License Amendment Request Supplemental ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441).2014-12-0505 December 2014 License Amendment Request Supplemental ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441). 2CAN101401, Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)2014-10-22022 October 2014 Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) 1CAN011406, Amendment 25 of the ANO Unit 1 Safety Analysis Report2014-01-29029 January 2014 Amendment 25 of the ANO Unit 1 Safety Analysis Report 1CAN121301, Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits2013-12-11011 December 2013 Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits 2CAN061302, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712013-06-18018 June 2013 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 1CAN031306, License Amendment Request, Adoption of Technical Specification Task Force (TSTF)-431, Revision 3 Change in Technical Specifications End States (BAW-2441)2013-03-26026 March 2013 License Amendment Request, Adoption of Technical Specification Task Force (TSTF)-431, Revision 3 Change in Technical Specifications End States (BAW-2441) 2CAN071201, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-07-0909 July 2012 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 2CAN041201, License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-04-0404 April 2012 License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 1CAN041102, License Amendment Request, Adoption of Technical Specification Task Force (TSTF)513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-29029 April 2011 License Amendment Request, Adoption of Technical Specification Task Force (TSTF)513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. 1CAN081001, License Amendment Request, Technical Specification Change Associated with Main Feedwater Isolation Valves2010-08-24024 August 2010 License Amendment Request, Technical Specification Change Associated with Main Feedwater Isolation Valves 2CAN081009, Emergency License Amendment Request Extension of ANO-2 Emergency Diesel Generator Allowed Outage Time2010-08-19019 August 2010 Emergency License Amendment Request Extension of ANO-2 Emergency Diesel Generator Allowed Outage Time 1CAN081002, License Amendment Request, Changes to Technical Specification 3.9.3, Technical Change Traveler - TSTF-312, Rev. 12010-08-10010 August 2010 License Amendment Request, Changes to Technical Specification 3.9.3, Technical Change Traveler - TSTF-312, Rev. 1 2CAN061003, Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years2010-06-17017 June 2010 Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years ML1016803802010-06-17017 June 2010 License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years 1CAN021004, Response to Request for Additional Information, Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2010-02-28028 February 2010 Response to Request for Additional Information, Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. 2CAN060903, License Amendment Request, Technical Specification Changes to Relocate Pressurizer Heater Requirements to Technical Requirements Manual2009-06-18018 June 2009 License Amendment Request, Technical Specification Changes to Relocate Pressurizer Heater Requirements to Technical Requirements Manual 2CAN050902, License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report2009-05-15015 May 2009 License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report 2CAN050901, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit2009-05-13013 May 2009 License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions 2CAN030902, License Amendment Request, Technical Specification Change to Delete COLR References2009-03-10010 March 2009 License Amendment Request, Technical Specification Change to Delete COLR References 1CAN030901, License Amendment Request on Technical Specification Change to Delete Low Pressurizer Level Limit2009-03-10010 March 2009 License Amendment Request on Technical Specification Change to Delete Low Pressurizer Level Limit 2CAN120801, License Amendment Request Supplemental Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM2008-12-11011 December 2008 License Amendment Request Supplemental Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM 2CAN070801, Supplement to License Amendment Request Regarding Technical Specification Changes Associated with Adoption of TSTF-3592008-07-0808 July 2008 Supplement to License Amendment Request Regarding Technical Specification Changes Associated with Adoption of TSTF-359 2CAN030806, Supplemental to License Amendment Request, Technical Specification 3.1.1.4, Moderator Temperature Coefficient2008-03-27027 March 2008 Supplemental to License Amendment Request, Technical Specification 3.1.1.4, Moderator Temperature Coefficient 2CAN100701, License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process2007-10-22022 October 2007 License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process 1CAN100703, License Amendment Request - Technical Specification Changes and Analyses Relating to Use of Alternate Source Term2007-10-22022 October 2007 License Amendment Request - Technical Specification Changes and Analyses Relating to Use of Alternate Source Term 2CAN100703, Unit 2 License Amendment Request for Technical Specification Change Associated with Replacement of Containment Sump Buffer2007-10-0505 October 2007 Unit 2 License Amendment Request for Technical Specification Change Associated with Replacement of Containment Sump Buffer ML0726300862007-09-28028 September 2007 License and Technical Specification Pages - Amendment No. 273 Revisions to TS to Support Partial Re-Rack and Revised Loading Patterns in the Spent Fuel Pool 2024-04-04 Category:Amendment MONTHYEAR2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications2024-04-0404 April 2024
[Table view]Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections 1CAN012002, License Amendment Request: Revise Loss of Voltage Relay Allowable Values2020-01-24024 January 2020 License Amendment Request: Revise Loss of Voltage Relay Allowable Values 1CAN061902, Supplemental Change Related to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2019-06-18018 June 2019 Supplemental Change Related to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues 2CAN121705, Exigent License Amendment Request Allowance to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 262017-12-28028 December 2017 Exigent License Amendment Request Allowance to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 26 2CAN101401, Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)2014-10-22022 October 2014 Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) 1CAN121301, Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits2013-12-11011 December 2013 Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits 2CAN071201, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-07-0909 July 2012 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 2CAN041201, License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-04-0404 April 2012 License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 ML1016803802010-06-17017 June 2010 License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years 2CAN061003, Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years2010-06-17017 June 2010 Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years 2CAN050902, License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report2009-05-15015 May 2009 License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report 2CAN050901, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit2009-05-13013 May 2009 License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions 2CAN030806, Supplemental to License Amendment Request, Technical Specification 3.1.1.4, Moderator Temperature Coefficient2008-03-27027 March 2008 Supplemental to License Amendment Request, Technical Specification 3.1.1.4, Moderator Temperature Coefficient 2CAN100701, License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process2007-10-22022 October 2007 License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process 2CAN100703, Unit 2 License Amendment Request for Technical Specification Change Associated with Replacement of Containment Sump Buffer2007-10-0505 October 2007 Unit 2 License Amendment Request for Technical Specification Change Associated with Replacement of Containment Sump Buffer ML0726300862007-09-28028 September 2007 License and Technical Specification Pages - Amendment No. 273 Revisions to TS to Support Partial Re-Rack and Revised Loading Patterns in the Spent Fuel Pool 2CAN050702, License Amendment Requesting, Technical Specification 3.1.1.4, Moderator Temperature Coefficient2007-05-0808 May 2007 License Amendment Requesting, Technical Specification 3.1.1.4, Moderator Temperature Coefficient ML0704400422007-02-26026 February 2007 Corrected Tech Spec Pgs - Correction to Amendment No. 228 for the Use of Metamic Poison Insert Assemblies in the Spent Fuel Pool 1CAN080601, License Amendment Request Regarding the Relocation of Inverter Y-28 and Panel C-540 Requirements from TSs to TRM2006-08-31031 August 2006 License Amendment Request Regarding the Relocation of Inverter Y-28 and Panel C-540 Requirements from TSs to TRM 1CAN070603, License Amendment Request to Support the Use of Metamic@ Polson Insert Assembles in the Spent Fuel Pool2006-07-27027 July 2006 License Amendment Request to Support the Use of Metamic@ Polson Insert Assembles in the Spent Fuel Pool 2CAN020601, License Amendment Request to Modify Technical Specification Surveillance Requirement 4.6.1.1.a2006-02-14014 February 2006 License Amendment Request to Modify Technical Specification Surveillance Requirement 4.6.1.1.a 2CAN090504, Arkansas, Unit 2 - License Amendment Request to Modify Technical Specification 3.1.1.5, Minimum Temperature for Criticality2005-09-19019 September 2005 Arkansas, Unit 2 - License Amendment Request to Modify Technical Specification 3.1.1.5, Minimum Temperature for Criticality 2CAN090502, Arkansas, Unit 2 - License Amendment Request to Allow One-Time Extension of Containment Spray System Allowable Outage Time2005-09-19019 September 2005 Arkansas, Unit 2 - License Amendment Request to Allow One-Time Extension of Containment Spray System Allowable Outage Time 2CAN070503, Arkansas, Unit 2 - License Amendment Request to Add Cask Loading Restrictions2005-07-21021 July 2005 Arkansas, Unit 2 - License Amendment Request to Add Cask Loading Restrictions ML0513700652005-05-13013 May 2005 ANO, Unit 2 -Technical Specification Pages Elimination of Requirements to Provide Monthly Operating Reports ML0509000042005-03-23023 March 2005 ANO Unit 2, Technical Specification.Pages Request to Support Cycle 18 Core Reload ML0414105232004-05-12012 May 2004 Arkansas, Unit 2, License Amendment Request to Support Cycle 18 Core Reload 1CAN120301, ANO, Unit 1 - Supplement to Amendment Request to Add a New Control Room Emergency Ventilation System Surveillance Requirement2003-12-16016 December 2003 ANO, Unit 1 - Supplement to Amendment Request to Add a New Control Room Emergency Ventilation System Surveillance Requirement ML0325906772003-09-11011 September 2003 Amendment 251 to License Re. Emergency Core Cooling Systems Technical Specification Pages ML0323104992003-08-12012 August 2003 Supplement to Amendment Request to Revise the Spent Fuel Pool Loading Pattern ML0322304332003-08-0808 August 2003 Amendment No. 249, Technical Specifications, Re. Emergency Diesel Generator Allowable Outage Time ML0318907712003-06-30030 June 2003 License Amendment Request, to Revise Spent Fuel Pool Loading Pattern 2CAN050304, Arkansas, Unit 2, License Amendment Request to Change Containment Spray System Surveillance2003-05-0101 May 2003 Arkansas, Unit 2, License Amendment Request to Change Containment Spray System Surveillance 2CAN090202, Arkansas Unit 2, Application for Amendment to License NPF-6 to Amend Technical Specifications to Extend Allowable Outage Time (AOT) for Emergency Diesel Generators (Edgs) from 72 Hours to Maximum of 14 Days2002-09-19019 September 2002 Arkansas Unit 2, Application for Amendment to License NPF-6 to Amend Technical Specifications to Extend Allowable Outage Time (AOT) for Emergency Diesel Generators (Edgs) from 72 Hours to Maximum of 14 Days 2024-04-04 |
Text
2CAN101401 October 22, 2014
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2
Change in Technical Specifications End States (CE NPSD-1186)" Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6
Dear Sir or Madam:
By letter dated March 26, 2013 (Reference 1), Entergy requested adoption of Technical Specification Task Force (TSTF)-422, Revision 2, for Arkansas Nuclear One, Unit 2 (ANO-2).
The marked-up and revised TS pages submitted in support of TSTF-422 adoption included proposed TS changes supporting adoption of TSTF-500, Revision 2, "DC Electrical Rewrite - Update to TSTF-360," which had been previously submitted for NRC review.
An Entergy response to an NRC Request for Additional Information (RAI) associated with adoption of TSTF-500 (Reference 7) resulted in a change to a TS page common to both the TSTF-500 and TSTF-422 amendment requests. Therefore, TSTF-422 related ANO-2 TS Page 3/4 8-8 mark-up and revised (clean) replacement pages are included in Attachments 1 and 2 of this letter, respectively, which incorporate the changes to this page made in response to Question 2 of the subject TSTF-500 RAI (Reference 7).
With respect to the original Entergy request (Reference 1), changes included in this letter have been evaluated and Entergy has determined that the changes do not invalidate the assessment of the no significant hazards consideration included in the reference letter, nor affect the applicability and acceptability of ANO-2 adoption of TSTF-422.
In accordance with 10 CFR 50.91(b)(1), a copy of this response is being provided to the designated Arkansas state official. No new commitments have been identified in this letter.
Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Tel 479-858-3110 Jeremy G. Browning Site Vice President Arkansas Nuclear One 2CAN101401 Page 2 of 3 If you have any questions or require additional information, please contact Stephenie Pyle at 479-858-4704.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on October 22, 2014. Sincerely,
ORIGINAL SIGNED BY JEREMY G. BROWNING JGB/dbb
REFERENCES:
- 1. Entergy letter dated March 26, 2013, License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)" (2CAN031303) (ML13085A283) 2. NRC email dated November 22, 2013, Arkansas Nuclear One, Unit 2 - RAI related to the adoption of TSTF-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)" (TAC No. MF1199) (ML13326A345) 3. Entergy letter dated December 12, 2013, Response to RAI related to the adoption of TSTF-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)" (2CAN121303) (ML13347B235) 4. Entergy letter dated May 12, 2014, License Amendment Request Supplemental - Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)" (2CAN051403) (ML14132A344) 5. NRC letter dated August 4, 2014, Request for Additional Information Regarding License Amendment Requests Proposing Adoption of Technical Specification Task Force Traveler TSTF-500" (2CNA081401) (ML14210A521) 6. NRC letter dated August 4, 2014, Request for Additional Information Regarding License Amendment Requests to Adopt Changes to Technical Specification End States" (0CNA081401) (ML14209A627) 7. Entergy letter dated August 12, 2014, Response to Request for Additional Information Regarding Adoption of Technical Specification Task Force (TSTF)-500, Revision 2, "DC Electrical Rewrite - Update to TSTF-360" (2CAN081402) (ML14224A645) 8. Entergy letter dated August 19, 2014, Response to Request for Additional Information Regarding License Amendment Requests to Adopt Changes to Technical Specification End States" (0CAN081407) (ML14231A370) 2CAN101401 Page 3 of 3 Attachments: 1. Replacement Markup of Technical Specification Page
- 2. Replacement Clean (Revised) Technical Specification Page cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Ms. Andrea E. George MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205 Attachment 1 to 2CAN101401 Replacement Markup of Technical Specification Page ARKANSAS - UNIT 2 3/4 8-8 Amendment No. 54,75,94,xxx, ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.3 The Train A and Train B DC electrical power subsystems shall be OPERABLE.
APPLICABILITY: MODES 1, 2, 3 and 4. ACTION: a. With one of the required full capacity chargers inoperable: i. Restore the battery terminal voltage to greater than or equal to the minimum established float voltage within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and ii. Verify battery float current 2 amps once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. b. With one DC electrical power subsystem inoperable for reasons other than ACTION 'a' above, restore the inoperable DC electrical power subsystem to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOTCOLD SHUTDOWN within the following 630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN. SURVEILLANCE REQUIREMENTS 4.8.2.3.1 At least once per 7 days by verifying that the battery terminal voltage is greater than or equal to the minimum established float voltage.
Attachment 2 to 2CAN101401 Replacement Clean (Revised) Technical Specification Page ARKANSAS - UNIT 2 3/4 8-8 Amendment No. 54,75,94,xxx, ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.3 The Train A and Train B DC electrical power subsystems shall be OPERABLE.
APPLICABILITY: MODES 1, 2, 3 and 4. ACTION: a. With one of the required full capacity chargers inoperable: i. Restore the battery terminal voltage to greater than or equal to the minimum established float voltage within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and ii. Verify battery float current 2 amps once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. b. With one DC electrical power subsystem inoperable for reasons other than ACTION 'a' above, restore the inoperable DC electrical power subsystem to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN. SURVEILLANCE REQUIREMENTS 4.8.2.3.1 At least once per 7 days by verifying that the battery terminal voltage is greater than or equal to the minimum established float voltage.