2CAN051403, License Amendment Request Supplemental, Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)

From kanterella
(Redirected from 2CAN051403)
Jump to navigation Jump to search

License Amendment Request Supplemental, Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)
ML14132A344
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/12/2014
From: Jeremy G. Browning
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2CAN051403, CE NPSD-1186, TAC ME8348, TSTF-422, Rev 2
Download: ML14132A344 (14)


Text

2CAN051403 May 12, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2 Change in Technical Specifications End States (CE NPSD-1186)

Docket No. 50-368 License No. NPF-6

REFERENCES:

1.

Entergy letter dated March 26, 2013, License Amendment Request -

Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)

(2CAN031303) (ML13085A283)

2.

Entergy letter dated April 23, 2014, License Amendment Request -

Withdrawal - Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 (2CAN041401) (TAC No. ME8348)

(ML14113A604)

Dear Sir or Madam:

By letter dated March 26, 2013 (Reference 1), Entergy requested adoption of Technical Specification Task Force (TSTF)-422, Revision 2, for Arkansas Nuclear One, Unit 2 (ANO-2). of the request, Page 3, Items 6 and 7, and Page 4, Item 16, stated that the Technical Specification (TS) markup and revised pages for TS 3.3.3.1 (Table 3.3-6), 3.4.1.3, and 3.7.6.1, along with the associated TS Bases, were based on Entergy letter dated July 9, 2012, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471.

By letter dated April 23, 2014 (Reference 2), Entergy requested the aforementioned July 9, 2012, letter (Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 - ML12192A089) be withdrawn from further NRC review. Subsequently, new markup and revised TS and TS Bases pages are being provided in continued support of TSTF-422 adoption, having changes removed that were applicable to the July 9, 2012, letter.

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-3110 Jeremy G. Browning Site Vice President Arkansas Nuclear One

2CAN051403 Page 2 of 2 The new pages have no impact on the acceptability of TSTF-422 adoption for ANO-2 and have no impact on the no significant hazards consideration included in the Reference 1 letter. The new pages included in the attachment to this letter supersede those previously submitted in the Reference 1 submittal.

In accordance with 10 CFR 50.91(b)(1), a copy of this response is being provided to the designated Arkansas state official.

No new commitments have been identified in this letter.

If you have any questions or require additional information, please contact Stephenie Pyle at 479-858-4704.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on May 12, 2014.

Sincerely, ORIGINAL SIGNED BY JEREMY G. BROWNING JGB/dbb

Attachment:

New Markup and Revised Technical Specification Pages for ANO-2 TSs 3.3.3.1 (Table 3.3-6), 3.4.1.3, and 3.7.6.1, and Associated Bases cc:

Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Peter Bamford MS O-8B3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205

Attachment to 2CAN051403 New Markup and Revised Technical Specification Pages for ANO-2 TSs 3.3.3.1 (Table 3.3-6), 3.4.1.3, and 3.7.6.1, and Associated Bases

ARKANSAS - UNIT 2 3/4 3-26 Amendment No. 63,130,145,206,231,

255, TABLE 3.3-6 (Continued)

TABLE NOTATION ACTION 13 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, perform area surveys of the monitored area with portable monitoring instrumentation at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

ACTION 16 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, complete the following:

a. If performing CORE ALTERATIONS or moving irradiated fuel within the reactor building, secure the containment purge system or suspend CORE ALTERATIONS and movement of irradiated fuel within the reactor building.
b. If a containment PURGE is in progress, secure the containment purge system.
c. If continuously ventilating, verify the SPING monitor operable or perform the ACTIONS of the Offsite Dose Calculation Manual, Appendix 2, Table 2.2-1, or secure the containment purge system.

ACTION 17 - In MODE 1, 2, 3, or 4, with no channels OPERABLE, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> initiate and maintain operation of the control room emergency ventilation system (CREVS) in the recirculation mode of operation or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and HOTCOLD SHUTDOWN in the following 630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

ACTION 18 - With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, (1) either restore the inoperable channel to OPERABLE status within 7 days or (2) prepare and submit a Special Report to the NRC within 30 days following the event, outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the system to OPERABLE status. With both channels inoperable, initiate alternate methods of monitoring the containment radiation level within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in addition to the actions described above.

ACTION 19 - With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirements, initiate the preplanned alternate method of monitoring the appropriate parameter(s), within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and:

1) either restore the inoperable Channel(s) to OPERABLE status within 7 days of the event, or
2) prepare and submit a Special Report to the NRC within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.

ARKANSAS - UNIT 2 3/4 3-26 Amendment No. 63,130,145,206,231,

255, ACTION 20 - In MODE 1, 2, 3, or 4 with the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, within 7 days restore the inoperable channel to OPERABLE status or initiate and maintain the CREVS in the recirculation mode of operation. Otherwise, be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and HOTCOLD SHUTDOWN in the following 630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />.

LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

ACTION 21 - During handling of irradiated fuel with one or two channels inoperable, immediately place one OPERABLE CREVS train in the emergency recirculation mode or immediately suspend handling of irradiated fuel.

Moved to new page 3/4 3-26a

ARKANSAS - UNIT 2 3/4 3-26a Amendment No.

TABLE 3.3-6 (Continued)

TABLE NOTATION ACTION 20 - In MODE 1, 2, 3, or 4 with the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, within 7 days restore the inoperable channel to OPERABLE status or initiate and maintain the CREVS in the recirculation mode of operation. Otherwise, be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and HOTCOLD SHUTDOWN in the following 630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />.

LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

ACTION 21 - During handling of irradiated fuel with one or two channels inoperable, immediately place one OPERABLE CREVS train in the emergency recirculation mode or immediately suspend handling of irradiated fuel.

Moved from previous page

ARKANSAS - UNIT 2 3/4 4-2a Amendment No. 24,29,233, REACTOR COOLANT SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.1.3

a.

At least two of the coolant loops listed below shall be OPERABLE:

1.

Reactor Coolant Loop (A) and its associated steam generator and at least one associated reactor coolant pump.

2.

Reactor Coolant Loop (B) and its associated steam generator and at least one associated reactor coolant pump.

3.

Shutdown Cooling Loop (A) #.

4.

Shutdown Cooling Loop (B) #.

b.

At least one of the above coolant loops shall be in operation.*

APPLICABILITY:

Modes 4 and 5.

ACTION:

a.

With less than the above required coolant loops OPERABLE, immediately initiate corrective action to return the required coolant loops to OPERABLE status as soon as possible; and initiate action to make at least one steam generator available for decay heat removal via natural circulationbe in COLD SHUTDOWN within 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

b.

With no coolant loop in operation, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and immediately initiate corrective action to return the required coolant loop to operation.

SURVEILLANCE REQUIREMENTS 4.4.1.3.1 The required shutdown cooling loop(s) shall be determined OPERABLE per the Inservice Testing Program.

4.4.1.3.2 The required reactor coolant pump(s), if not in operation, shall be determined to be OPERABLE once per 7 days by verifying correct breaker alignments and indicated power availability.

4.4.1.3.3 The required steam generator(s) shall be determined OPERABLE by verifying the secondary side water level to be 23% indicated level at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.1.3.4 At least one coolant loop shall be verified to be in operation and circulating reactor coolant at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

  • All reactor coolant pumps and decay heat removal pumps may be de-energized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided (1) no operations are permitted that would cause dilution of the reactor coolant system boron concentration, and (2) core outlet temperature is maintained at least 10°F below saturation temperature.
  1. The normal or emergency power source may be inoperable in Mode 5.

ARKANSAS - UNIT 2 3/4 7-17 Amendment No. 206,219,255,288, PLANT SYSTEMS 3/4.7.6 CONTROL ROOM EMERGENCY VENTILATION AND AIR CONDITIONING SYSTEM LIMITING CONDITION FOR OPERATION 3.7.6.1 Two independent control room emergency ventilation and air conditioning systems shall be OPERABLE. (Note 1)

APPLICABILITY:

MODES 1, 2, 3, 4, or during handling of irradiated fuel.

ACTION:

MODES 1, 2, 3, and 4

a.

With one control room emergency air conditioning system (CREACS) inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOTCOLD SHUTDOWN within the following 630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

b.

With one control room emergency ventilation system (CREVS) inoperable for reasons other than ACTION d, restore the inoperable system to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOTCOLD SHUTDOWN within the following 630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

c.

With one CREVS inoperable for reasons other than ACTION d and one CREACS inoperable, restore the inoperable CREVS to OPERABLE status within 7 days and restore the inoperable CREACS to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOTCOLD SHUTDOWN within the following 630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

d.

With one or more CREVS inoperable due to an inoperable CRE boundary:

1.

Immediately initiate action to implement mitigating actions, and

2.

Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and

3.

Restore the CRE boundary to OPERABLE status within 90 days Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOTCOLD SHUTDOWN within the following 630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

e.

With two CREVS inoperable for reasons other than ACTION d or with two CREACS inoperable, enter Specification 3.0.3.

Note 1: The control room envelope (CRE) boundary may be open intermittently under administrative controls.

ARKANSAS - UNIT 2 B 3/4 4-1 Amendment No. 24,29,149,199 Rev. 1,10,33,46, 3/4.4 REACTOR COOLANT SYSTEM BASES 3/4.4.1 REACTOR COOLANT LOOPS AND COOLANT CIRCULATION The plant is designed to operate with both reactor coolant loops and associated reactor coolant pumps in operation, and maintain DNBR above the limits specified by Specification 3.2.4 during all normal operations and anticipated transients.

In MODE 3, a single reactor coolant loop provides sufficient heat removal capability for removing decay heat; however, single failure considerations require that two loops be OPERABLE.

In MODES 4 and 5, a single reactor coolant loop or shutdown cooling (SDC) loop provides sufficient heat removal capability for removing decay heat; but single failure considerations require that at least two loops be OPERABLE. Thus, if the reactor coolant loops are not OPERABLE, this specification requires two SDCshutdown cooling loops to be OPERABLE.

The operation of one Reactor Coolant Pump or one SDCshutdown cooling pump provides adequate flow to ensure mixing, prevent stratification and produce gradual reactivity changes during boron concentration reductions in the Reactor Coolant System (RCS). The reactivity change rate associated with boron reductions will, therefore, be within the capability of operator recognition and control.

If only one required SDC train is OPERABLE and in operation and no required RCS loops are OPERABLE, redundancy for heat removal is lost and the plant must be placed in a configuration that minimizes overall plant risk. This redundancy is obtained by making at least one SG available for decay heat removal via natural circulation because:

1.

MODE 4 operation poses overall lower risk of core damage and large early radiation release than does MODE 5 (reference CE NPSD-1186-A, Technical Justification for the Risk Informed Modification to Selected Required Action End States for CEOG PWRs, October, 2001). This is particularly true with SDC impaired.

2.

In MODE 4, RCS and steam generator conditions may be maintained such that failure of the operating SDC train may be mitigated by natural circulation heat removal through one or more steam generators.

Remaining within the Applicability of the LCO is acceptable because the plant risk in MODE 4 is similar to or lower than MODE 5. However, voluntary entry into MODE 5 may be made as it is also an acceptable low-risk state. These Actions are modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 4. This Note prohibits the use of LCO 3.0.4.a to enter MODE 4 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 4, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

ARKANSAS - UNIT 2 B 3/4 8-1 Amendment No. 141,146,215,227,237 Rev. 33, 3/4.8 ELECTRICAL POWER SYSTEMS BASES The OPERABILITY of the AC and DC power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety-related equipment required for 1) the safe shutdown of the facility and 2) the mitigation and control of accident conditions within the facility. The minimum specified independent and redundant AC and DC power sources and distribution systems satisfy the requirements of General Design Criteria 17 of Appendix "A" to 10 CFR 50.

The OPERABILITY of the minimum specified AC and DC power sources and associated distribution systems during shutdown and refueling ensures that 1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability is available for monitoring and maintaining the unit status.

Upon loss of a required power source, suspension of CORE ALTERATIONS, the handling of irradiated fuel, and activities involving positive reactivity additions act to minimize the probability of the occurrence of postulated events. Suspension of these activities shall not preclude placing fuel assemblies in a safe position.

If the inoperable AC electrical power sources or an inoperable DC electrical power subsystem cannot be restored to an OPERABLE status within the allowable outage times, the plant must be brought to a MODE in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and to MODE 4 within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Remaining within the Applicability of the LCO is acceptable because the plant risk in MODE 4 is similar to or lower than MODE 5 (reference CE NPSD-1186-A, Technical Justification for the Risk Informed Modification to Selected Required Action End States for CEOG PWRs, October, 2001). In MODE 4 there are more accident mitigation systems available and there is more redundancy and diversity in core heat removal mechanisms than in MODE 5. However, voluntary entry into MODE 5 may be made as it is also an acceptable low-risk state. These Actions are modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 4. This Note prohibits the use of LCO 3.0.4.a to enter MODE 4 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 4, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

AC TS 3.8.1.1 ACTION a includes an allowance for extending the allowable outage time for Startup Transformer No. 2 only, for up to 30 days. The 30-day allowance is permitted not more than once in any 10-year period, which is considered sufficient for proper maintenance of the transformer. The 30-day window should permit extensive preplanned preventative maintenance without placing either unit in an action statement of short duration and would allow both units to be operating during such maintenance. Because this allowance assumes parts are prestaged, appropriate personnel are available, and proper contingencies have been established, it is not intended to be used for an unexpected loss of the transformer. Pre-established contingencies will consider the projected stability of the offsite electrical grid, the atmospheric stability projected for the maintenance window, the ability to adequately control other ongoing plant maintenance activities that coincide with the window, projected flood levels, and the availability of all other power sources. Since a station blackout is the most affected event that could occur when power sources are inoperable, the steam driven emergency feedwater (EFW) pump will also be maintained available during the evolution.

ARKANSAS - UNIT 2 3/4 3-26 Amendment No. 63,130,145,206,231,

255, TABLE 3.3-6 (Continued)

TABLE NOTATION ACTION 13 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, perform area surveys of the monitored area with portable monitoring instrumentation at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

ACTION 16 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, complete the following:

a. If performing CORE ALTERATIONS or moving irradiated fuel within the reactor building, secure the containment purge system or suspend CORE ALTERATIONS and movement of irradiated fuel within the reactor building.
b. If a containment PURGE is in progress, secure the containment purge system.
c. If continuously ventilating, verify the SPING monitor operable or perform the ACTIONS of the Offsite Dose Calculation Manual, Appendix 2, Table 2.2-1, or secure the containment purge system.

ACTION 17 - In MODE 1, 2, 3, or 4, with no channels OPERABLE, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> initiate and maintain operation of the control room emergency ventilation system (CREVS) in the recirculation mode of operation or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and HOT SHUTDOWN in the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

ACTION 18 - With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, (1) either restore the inoperable channel to OPERABLE status within 7 days or (2) prepare and submit a Special Report to the NRC within 30 days following the event, outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the system to OPERABLE status. With both channels inoperable, initiate alternate methods of monitoring the containment radiation level within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in addition to the actions described above.

ACTION 19 - With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirements, initiate the preplanned alternate method of monitoring the appropriate parameter(s), within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and:

1) either restore the inoperable Channel(s) to OPERABLE status within 7 days of the event, or
2) prepare and submit a Special Report to the NRC within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.

ARKANSAS - UNIT 2 3/4 3-26a Amendment No.

TABLE 3.3-6 (Continued)

TABLE NOTATION ACTION 20 - In MODE 1, 2, 3, or 4 with the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, within 7 days restore the inoperable channel to OPERABLE status or initiate and maintain the CREVS in the recirculation mode of operation. Otherwise, be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and HOT SHUTDOWN in the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

ACTION 21 - During handling of irradiated fuel with one or two channels inoperable, immediately place one OPERABLE CREVS train in the emergency recirculation mode or immediately suspend handling of irradiated fuel.

ARKANSAS - UNIT 2 3/4 7-17 Amendment No. 206,219,255,288, REACTOR COOLANT SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.1.3

a.

At least two of the coolant loops listed below shall be OPERABLE:

1.

Reactor Coolant Loop (A) and its associated steam generator and at least one associated reactor coolant pump.

2.

Reactor Coolant Loop (B) and its associated steam generator and at least one associated reactor coolant pump.

3.

Shutdown Cooling Loop (A) #.

4.

Shutdown Cooling Loop (B) #.

b.

At least one of the above coolant loops shall be in operation.*

APPLICABILITY:

Modes 4 and 5.

ACTION:

a.

With less than the above required coolant loops OPERABLE, immediately initiate corrective action to return the required coolant loops to OPERABLE status as soon as possible and initiate action to make at least one steam generator available for decay heat removal via natural circulation. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

b.

With no coolant loop in operation, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and immediately initiate corrective action to return the required coolant loop to operation.

SURVEILLANCE REQUIREMENTS 4.4.1.3.1 The required shutdown cooling loop(s) shall be determined OPERABLE per the Inservice Testing Program.

4.4.1.3.2 The required reactor coolant pump(s), if not in operation, shall be determined to be OPERABLE once per 7 days by verifying correct breaker alignments and indicated power availability.

4.4.1.3.3 The required steam generator(s) shall be determined OPERABLE by verifying the secondary side water level to be 23% indicated level at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.1.3.4 At least one coolant loop shall be verified to be in operation and circulating reactor coolant at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

  • All reactor coolant pumps and decay heat removal pumps may be de-energized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided (1) no operations are permitted that would cause dilution of the reactor coolant system boron concentration, and (2) core outlet temperature is maintained at least 10°F below saturation temperature.
  1. The normal or emergency power source may be inoperable in Mode 5.

ARKANSAS - UNIT 2 3/4 7-17 Amendment No. 206,219,255,288, PLANT SYSTEMS 3/4.7.6 CONTROL ROOM EMERGENCY VENTILATION AND AIR CONDITIONING SYSTEM LIMITING CONDITION FOR OPERATION 3.7.6.1 Two independent control room emergency ventilation and air conditioning systems shall be OPERABLE. (Note 1)

APPLICABILITY:

MODES 1, 2, 3, 4, or during handling of irradiated fuel.

ACTION:

MODES 1, 2, 3, and 4

a.

With one control room emergency air conditioning system (CREACS) inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

b.

With one control room emergency ventilation system (CREVS) inoperable for reasons other than ACTION d, restore the inoperable system to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

c.

With one CREVS inoperable for reasons other than ACTION d and one CREACS inoperable, restore the inoperable CREVS to OPERABLE status within 7 days and restore the inoperable CREACS to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

d.

With one or more CREVS inoperable due to an inoperable CRE boundary:

1.

Immediately initiate action to implement mitigating actions, and

2.

Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and

3.

Restore the CRE boundary to OPERABLE status within 90 days Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.

e.

With two CREVS inoperable for reasons other than ACTION d or with two CREACS inoperable, enter Specification 3.0.3.

Note 1: The control room envelope (CRE) boundary may be open intermittently under administrative controls.