Category:Technical Specification
MONTHYEAR2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications2024-04-0404 April 2024 Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications ML23324A0172023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement 1CAN102101, SAR Amendment 30, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2021-10-0606 October 2021 SAR Amendment 30, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections 1CAN012002, License Amendment Request: Revise Loss of Voltage Relay Allowable Values2020-01-24024 January 2020 License Amendment Request: Revise Loss of Voltage Relay Allowable Values 2CAN121901, License Amendment Request Technical Specification Deletions, Additions, and Relocations2019-12-16016 December 2019 License Amendment Request Technical Specification Deletions, Additions, and Relocations 1CAN061902, Supplemental Change Related to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2019-06-18018 June 2019 Supplemental Change Related to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues 1CAN031901, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2019-03-25025 March 2019 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. 1CAN111802, ANO Unit 1 SAR Amendment 28, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2018-11-12012 November 2018 ANO Unit 1 SAR Amendment 28, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report 2CAN121705, Exigent License Amendment Request Allowance to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 262017-12-28028 December 2017 Exigent License Amendment Request Allowance to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 26 2CAN111702, License Amendment Request - Updating the Reactor Coolant System Pressure-Temperature Limits2017-11-20020 November 2017 License Amendment Request - Updating the Reactor Coolant System Pressure-Temperature Limits 1CAN031604, Arkansas, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Co2016-03-25025 March 2016 Arkansas, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code 2CAN031602, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme..2016-03-25025 March 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme.. 2CAN121502, Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2015-12-22022 December 2015 Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process 1CAN121403, License Amendment Request Supplemental ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441).2014-12-0505 December 2014 License Amendment Request Supplemental ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441). 2CAN101401, Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)2014-10-22022 October 2014 Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) 1CAN011406, Amendment 25 of the ANO Unit 1 Safety Analysis Report2014-01-29029 January 2014 Amendment 25 of the ANO Unit 1 Safety Analysis Report 1CAN121301, Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits2013-12-11011 December 2013 Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits 2CAN061302, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712013-06-18018 June 2013 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 1CAN031306, License Amendment Request, Adoption of Technical Specification Task Force (TSTF)-431, Revision 3 Change in Technical Specifications End States (BAW-2441)2013-03-26026 March 2013 License Amendment Request, Adoption of Technical Specification Task Force (TSTF)-431, Revision 3 Change in Technical Specifications End States (BAW-2441) 2CAN071201, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-07-0909 July 2012 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 2CAN041201, License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-04-0404 April 2012 License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 1CAN041102, License Amendment Request, Adoption of Technical Specification Task Force (TSTF)513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-29029 April 2011 License Amendment Request, Adoption of Technical Specification Task Force (TSTF)513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. 1CAN081001, License Amendment Request, Technical Specification Change Associated with Main Feedwater Isolation Valves2010-08-24024 August 2010 License Amendment Request, Technical Specification Change Associated with Main Feedwater Isolation Valves 2CAN081009, Emergency License Amendment Request Extension of ANO-2 Emergency Diesel Generator Allowed Outage Time2010-08-19019 August 2010 Emergency License Amendment Request Extension of ANO-2 Emergency Diesel Generator Allowed Outage Time 1CAN081002, License Amendment Request, Changes to Technical Specification 3.9.3, Technical Change Traveler - TSTF-312, Rev. 12010-08-10010 August 2010 License Amendment Request, Changes to Technical Specification 3.9.3, Technical Change Traveler - TSTF-312, Rev. 1 2CAN061003, Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years2010-06-17017 June 2010 Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years ML1016803802010-06-17017 June 2010 License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years 1CAN021004, Response to Request for Additional Information, Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2010-02-28028 February 2010 Response to Request for Additional Information, Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. 2CAN060903, License Amendment Request, Technical Specification Changes to Relocate Pressurizer Heater Requirements to Technical Requirements Manual2009-06-18018 June 2009 License Amendment Request, Technical Specification Changes to Relocate Pressurizer Heater Requirements to Technical Requirements Manual 2CAN050902, License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report2009-05-15015 May 2009 License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report 2CAN050901, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit2009-05-13013 May 2009 License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions 2CAN030902, License Amendment Request, Technical Specification Change to Delete COLR References2009-03-10010 March 2009 License Amendment Request, Technical Specification Change to Delete COLR References 1CAN030901, License Amendment Request on Technical Specification Change to Delete Low Pressurizer Level Limit2009-03-10010 March 2009 License Amendment Request on Technical Specification Change to Delete Low Pressurizer Level Limit 2CAN120801, License Amendment Request Supplemental Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM2008-12-11011 December 2008 License Amendment Request Supplemental Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM 2CAN070801, Supplement to License Amendment Request Regarding Technical Specification Changes Associated with Adoption of TSTF-3592008-07-0808 July 2008 Supplement to License Amendment Request Regarding Technical Specification Changes Associated with Adoption of TSTF-359 2CAN030806, Supplemental to License Amendment Request, Technical Specification 3.1.1.4, Moderator Temperature Coefficient2008-03-27027 March 2008 Supplemental to License Amendment Request, Technical Specification 3.1.1.4, Moderator Temperature Coefficient 2CAN100701, License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process2007-10-22022 October 2007 License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process 1CAN100703, License Amendment Request - Technical Specification Changes and Analyses Relating to Use of Alternate Source Term2007-10-22022 October 2007 License Amendment Request - Technical Specification Changes and Analyses Relating to Use of Alternate Source Term 2CAN100703, Unit 2 License Amendment Request for Technical Specification Change Associated with Replacement of Containment Sump Buffer2007-10-0505 October 2007 Unit 2 License Amendment Request for Technical Specification Change Associated with Replacement of Containment Sump Buffer ML0726300862007-09-28028 September 2007 License and Technical Specification Pages - Amendment No. 273 Revisions to TS to Support Partial Re-Rack and Revised Loading Patterns in the Spent Fuel Pool 2024-04-04
[Table view] Category:Amendment
MONTHYEAR2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications2024-04-0404 April 2024 Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections 1CAN012002, License Amendment Request: Revise Loss of Voltage Relay Allowable Values2020-01-24024 January 2020 License Amendment Request: Revise Loss of Voltage Relay Allowable Values 1CAN061902, Supplemental Change Related to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2019-06-18018 June 2019 Supplemental Change Related to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues 2CAN121705, Exigent License Amendment Request Allowance to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 262017-12-28028 December 2017 Exigent License Amendment Request Allowance to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 26 2CAN101401, Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)2014-10-22022 October 2014 Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) 1CAN121301, Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits2013-12-11011 December 2013 Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits 2CAN071201, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-07-0909 July 2012 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 2CAN041201, License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-04-0404 April 2012 License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 ML1016803802010-06-17017 June 2010 License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years 2CAN061003, Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years2010-06-17017 June 2010 Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years 2CAN050902, License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report2009-05-15015 May 2009 License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report 2CAN050901, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit2009-05-13013 May 2009 License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions 2CAN030806, Supplemental to License Amendment Request, Technical Specification 3.1.1.4, Moderator Temperature Coefficient2008-03-27027 March 2008 Supplemental to License Amendment Request, Technical Specification 3.1.1.4, Moderator Temperature Coefficient 2CAN100701, License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process2007-10-22022 October 2007 License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process 2CAN100703, Unit 2 License Amendment Request for Technical Specification Change Associated with Replacement of Containment Sump Buffer2007-10-0505 October 2007 Unit 2 License Amendment Request for Technical Specification Change Associated with Replacement of Containment Sump Buffer ML0726300862007-09-28028 September 2007 License and Technical Specification Pages - Amendment No. 273 Revisions to TS to Support Partial Re-Rack and Revised Loading Patterns in the Spent Fuel Pool 2CAN050702, License Amendment Requesting, Technical Specification 3.1.1.4, Moderator Temperature Coefficient2007-05-0808 May 2007 License Amendment Requesting, Technical Specification 3.1.1.4, Moderator Temperature Coefficient ML0704400422007-02-26026 February 2007 Corrected Tech Spec Pgs - Correction to Amendment No. 228 for the Use of Metamic Poison Insert Assemblies in the Spent Fuel Pool 1CAN080601, License Amendment Request Regarding the Relocation of Inverter Y-28 and Panel C-540 Requirements from TSs to TRM2006-08-31031 August 2006 License Amendment Request Regarding the Relocation of Inverter Y-28 and Panel C-540 Requirements from TSs to TRM 1CAN070603, License Amendment Request to Support the Use of Metamic@ Polson Insert Assembles in the Spent Fuel Pool2006-07-27027 July 2006 License Amendment Request to Support the Use of Metamic@ Polson Insert Assembles in the Spent Fuel Pool 2CAN020601, License Amendment Request to Modify Technical Specification Surveillance Requirement 4.6.1.1.a2006-02-14014 February 2006 License Amendment Request to Modify Technical Specification Surveillance Requirement 4.6.1.1.a 2CAN090504, Arkansas, Unit 2 - License Amendment Request to Modify Technical Specification 3.1.1.5, Minimum Temperature for Criticality2005-09-19019 September 2005 Arkansas, Unit 2 - License Amendment Request to Modify Technical Specification 3.1.1.5, Minimum Temperature for Criticality 2CAN090502, Arkansas, Unit 2 - License Amendment Request to Allow One-Time Extension of Containment Spray System Allowable Outage Time2005-09-19019 September 2005 Arkansas, Unit 2 - License Amendment Request to Allow One-Time Extension of Containment Spray System Allowable Outage Time 2CAN070503, Arkansas, Unit 2 - License Amendment Request to Add Cask Loading Restrictions2005-07-21021 July 2005 Arkansas, Unit 2 - License Amendment Request to Add Cask Loading Restrictions ML0513700652005-05-13013 May 2005 ANO, Unit 2 -Technical Specification Pages Elimination of Requirements to Provide Monthly Operating Reports ML0509000042005-03-23023 March 2005 ANO Unit 2, Technical Specification.Pages Request to Support Cycle 18 Core Reload ML0414105232004-05-12012 May 2004 Arkansas, Unit 2, License Amendment Request to Support Cycle 18 Core Reload 1CAN120301, ANO, Unit 1 - Supplement to Amendment Request to Add a New Control Room Emergency Ventilation System Surveillance Requirement2003-12-16016 December 2003 ANO, Unit 1 - Supplement to Amendment Request to Add a New Control Room Emergency Ventilation System Surveillance Requirement ML0325906772003-09-11011 September 2003 Amendment 251 to License Re. Emergency Core Cooling Systems Technical Specification Pages ML0323104992003-08-12012 August 2003 Supplement to Amendment Request to Revise the Spent Fuel Pool Loading Pattern ML0322304332003-08-0808 August 2003 Amendment No. 249, Technical Specifications, Re. Emergency Diesel Generator Allowable Outage Time ML0318907712003-06-30030 June 2003 License Amendment Request, to Revise Spent Fuel Pool Loading Pattern 2CAN050304, Arkansas, Unit 2, License Amendment Request to Change Containment Spray System Surveillance2003-05-0101 May 2003 Arkansas, Unit 2, License Amendment Request to Change Containment Spray System Surveillance 2CAN090202, Arkansas Unit 2, Application for Amendment to License NPF-6 to Amend Technical Specifications to Extend Allowable Outage Time (AOT) for Emergency Diesel Generators (Edgs) from 72 Hours to Maximum of 14 Days2002-09-19019 September 2002 Arkansas Unit 2, Application for Amendment to License NPF-6 to Amend Technical Specifications to Extend Allowable Outage Time (AOT) for Emergency Diesel Generators (Edgs) from 72 Hours to Maximum of 14 Days 2024-04-04
[Table view] |