ML17056B314
| ML17056B314 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/31/1989 |
| From: | DAHLBERG K A NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML17056B295 | List: |
| References | |
| NUDOCS 9102200129 | |
| Download: ML17056B314 (2) | |
Text
OPERATINGSTATUSOPERATINGDATAREPORTDOCKETNO.:50-220DATE:1/31/91COMPLETEDBY:K.A.DahlbergTELEPHONE:(315)349-24431.UnitName:NineMilePointUnit//12.ReportingPeriod:5/1/89through5/31/893~LicensedThermalPower(MWt):18504.NameplateRating(GrossMWe):6405.DesignElectricalRating(NetMWe):6206.MaximumDependableCapacity(GrossMWe):6307.MaximumDependableCapacity(NetMWe):6108.IfChangesOccurinCapacityRatings(ItemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted,IfAny(NetMWe):10.ReasonsForRestrictions,IfAny:ThisMonthYr-to-DateCumulative11.HoursinReportingPeriod12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGeneratorOn-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated(MWH)17.GrossElectricalEnergyGenerated(MWH)18.NetElectricalEnergyGenerated(MWH)19.UnitServiceFactor20.UnitAvailabilityFactor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.ShutdownsScheduledOverNext6MonthsRefueloutaestartedonanunr22I744.00.00.00.00.00.00.00.00.00.00.00.0100.0(Type,DateandDurationofEach):88.3,623.00.00.00.00.00.00.00.00.00.00.00.0100.0172,752.2115,234.31,204.2112,117.220.4188,473,132.062)473p070060,524,382.064.964.957.456,520.826.UnitisTestStatus(PriortoCommercialOperation):ForecastAchievedIN1TIALCR1TICAL1TYINlTIALELECTRIC1TYCOMMERCIALOPERATION9102200129'50QQ22QpP10207pDR"ADOCKPDRR 4lgPyl