ML16257A158

From kanterella
Revision as of 23:29, 5 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 17, Quality Assurance
ML16257A158
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A158 (3)


Text

WSES-FSAR-UNIT-317-iCHAPTER 17QUALITY ASSURANCETABLE OF CONTENTSSectionTitlePage17.0QUALITY ASSURANCE17.1-1 17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION17.1-1 17.2QUALITY ASSURANCE DURING OPERATIONS17.2-1 WSES-FSAR-UNIT-317.1-117.0QUALITY ASSURANCE17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTIONThis section is not applicable to FSAR.

WSES-FSAR-UNIT-317.2-117.2QUALITY ASSURANCE DURING OPERATIONSThis section is covered in a separate Quality Assurance Program Manual which has beensubmitted to the NRC.