Core Standby Cooling System
From kanterella
Revision as of 20:15, 18 April 2018 by
StriderTol
(
talk
|
contribs
)
(Created page with "{{System-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
System
Automatic Depressurization System
Auxiliary Building Gas Treatment System
Auxiliary Feedwater
Circulating Water System
Containment Spray
Control Rod
Control Room Emergency Filtration System
Control Room Emergency Ventilation
Control Room Emergency Ventilation Air Supply
Control Room Envelope
Core Spray
Core Standby Cooling System
Cresent Area Ventilation and Cooling
Critical Function Monitoring System
Decay Heat Removal
Drywell Continuous Atmospheric Monitor
Emergency Cooling Tower
Emergency Core Cooling System
Emergency Diesel Generator
Emergency Equipment Cooling Water
Emergency Feedwater Actuation System
Emergency Feedwater Initiation and Control
Emergency Feedwater System
Emergency Gas Treatment System
Emergency Response Data System
Extraction steam
Feedwater
Fuel Pool Cooling and Cleanup
HVAC
High Pressure Coolant Injection
High Pressure Core Spray
Intermediate Range Monitor
Low Pressure Coolant Injection
Low Pressure Cooling Injection
Main Condenser
Main Steam
Main Steam Isolation Valve
Main Steam Line
Main Steam Safety Valve
Main Transformer
Main Turbine
Main Turbine Bypass System
Mechanical Pressure Regulator
Moisture Separator Reheater
Permanent Magnet Generator
Post Accident Monitoring
Primary Containment Isolation System
Primary containment
Qualified Safety Parameter Display System
Reactor Building Closed Loop Cooling
[ENS]
|
[LER]
|
[Findings]
Site
Start date
Title
Description
ML24109A086
Monticello
17 April 2024
1 to the Updated Safety Analysis Report, Chapter 4, Reactor Coolant System
IR 05000373/2023004
LaSalle
24 January 2024
County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004
IR 05000373/2023012
LaSalle
18 January 2024
County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012
NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems
Hatch
6 December 2023
Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems
IR 05000373/2023003
LaSalle
9 November 2023
County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001
ML23291A373
Susquehanna
12 October 2023
1 to Updated Final Safety Analysis Report, Chapter 1, Section 1.6, Material Incorporated by Reference
ML23291A387
Susquehanna
12 October 2023
1 to Updated Final Safety Analysis Report, Chapter 1, Section 1.2, General Plant Description
IR 05000373/2023002
LaSalle
1 August 2023
County Station - Integrated Inspection Report 05000373/2023002 and 05000374/2023002
ML23180A032
Dresden
21 June 2023
5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML23129A269
Cooper
20 April 2023
1 to Updated Safety Analysis Report, Section I, Introduction and Summary
... further results
Category
:
System
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties