Core Standby Cooling System
From kanterella
Revision as of 21:15, 18 April 2018 by
StriderTol
(
talk
|
contribs
)
(Created page with "{{System-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
System
Automatic Depressurization System
Auxiliary Building Gas Treatment System
Auxiliary Feedwater
Circulating Water System
Containment Spray
Control Rod
Control Room Emergency Air Temperature Control System
Control Room Emergency Filtration System
Control Room Emergency Ventilation
Control Room Emergency Ventilation Air Supply
Control Room Envelope
Core Spray
Core Standby Cooling System
Cresent Area Ventilation and Cooling
Critical Function Monitoring System
Decay Heat Removal
Drywell Continuous Atmospheric Monitor
Electrohydraulic Control
Emergency Cooling Tower
Emergency Core Cooling System
Emergency Diesel Generator
Emergency Equipment Cooling Water
Emergency Feedwater Actuation System
Emergency Feedwater Initiation and Control
Emergency Feedwater System
Emergency Gas Treatment System
Emergency Response Data System
Extraction steam
Feedwater
Fuel Pool Cooling and Cleanup
HVAC
High Pressure Coolant Injection
High Pressure Core Spray
Intermediate Range Monitor
Low Pressure Coolant Injection
Low Pressure Cooling Injection
Main Condenser
Main Steam
Main Steam Isolation Valve
Main Steam Line
Main Steam Safety Valve
Main Transformer
Main Turbine
Main Turbine Bypass System
Mechanical Pressure Regulator
Moisture Separator Reheater
Permanent Magnet Generator
Post Accident Monitoring
Primary Containment Isolation System
Primary containment
[ENS]
|
[LER]
|
[Findings]
Site
Start date
Title
Description
ML25290A006
Susquehanna
13 October 2025
Updated Final Safety Analysis Report, Rev. 72, Chapter 1, Section 1.6, Material Incorporated by Reference
ML25290A009
Susquehanna
13 October 2025
Updated Final Safety Analysis Report, Rev. 72, Chapter 1, Section 1.2, General Plant Description
ML25290A045
Susquehanna
13 October 2025
Updated Final Safety Analysis Report, Rev. 72, Chapter 5, Section 5.4, Component and Subsystem Design
ML25232A211
Dresden
20 August 2025
Re-submittal of Updated Final Safety Analysis Report, Revision 16, Chapter 1, Introduction and General Description of Plant
IR 05000373/2025002
LaSalle
11 August 2025
County Station Integrated Inspection Report 05000373/2025002 and 05000374/2025002
IR 05000373/2025010
LaSalle
27 June 2025
County Station Age-Related Degradation Inspection Report 05000373/2025010 and 05000374/2025010
IR 05000373/2025001
LaSalle
8 May 2025
County Station Integrated Inspection Report 05000373/2025001 and 05000374/2025001
ML25105A255
Monticello
10 April 2025
Rev. 42 to the Updated Final Safety Analysis Report, Chapter 7, Plant Instrumentation and Control Systems
ML25107A228
Monticello
10 April 2025
Rev. 42 to the Updated Final Safety Analysis Report, Chapter 7, Plant Instrumentation and Control Systems
ML25105A251
Monticello
10 April 2025
Rev. 42 to the Updated Final Safety Analysis Report, Chapter 3, Reactor
... further results
Category
:
System
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Refresh
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties