Letter Sequence Other |
---|
TAC:MF2407, Control Room Habitability (Open) TAC:MF2409, Control Room Habitability (Open) TAC:MF2406, Control Room Habitability (Open) TAC:MF2408, Control Room Habitability (Open) TAC:MF2405, Control Room Habitability (Open) TAC:MF2404, Control Room Habitability (Open) TAC:MF2403, Control Room Habitability (Open) TAC:MF2402, Control Room Habitability (Open) TAC:MF2401, Control Room Habitability (Open) TAC:MF2400, Control Room Habitability (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML13323A186, ML13323A189, ML13323A190, ML13323A191, ML14052A053, ML14321A438, ML14321A677, ML15175A024, ML15183A007, ML15183A009, ML15246A128, ML15246A129, NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI), NOC-AE-14003104, Revised Affidavit for Withholding for Casa Grande Analyses for Risk-Informed GSI-191 Licensing Application, NOC-AE-14003106, Second Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI- 191 Licensing Application, NOC-AE-14003111, Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing Application, NOC-AE-15003220, Description of Revised Risk-Informed Methodology and Responses to Round 2 Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application, NOC-AE-15003232, Submittal of Updated Casa Grande Input for Stp'S Risk-Informed GSI-191 Licensing Application, NOC-AE-15003241, Attachment 3-4 - UFSAR Markups (Information Only) Through Definitions and Acronyms, NOC-AE-16003357, Revision to Proposed Exemption to 10CFR50.46 Described in Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond To..
|
MONTHYEARML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results. Project stage: Other ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. Project stage: Other NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. Project stage: Other ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations. Project stage: Other ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. Project stage: Other ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 Project stage: Other ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End Project stage: Other ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. Project stage: Other ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. Project stage: Other ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects. Project stage: Other NOC-AE-13002954, Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-1912013-01-31031 January 2013 Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: Request ML13214A0312013-08-13013 August 2013 Acceptance Review, Exemption Requests and License Amendment Request to Revise UFSAR for Resolution of Generic Safety Issue 191, Assessment of Debris Accumulation on PWR Sump Performance (TAC MF0613-MF0614; MF2400-09) Project stage: Acceptance Review ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. Project stage: Other ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) Project stage: Other NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)2013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). Project stage: Other ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis Project stage: Other ML13323B1872013-10-31031 October 2013 Project, Units 1 & 2, Submittal of GSI-191 Chemical Effects Test Reports (TAC Nos. MF2400 and MF2401) Project stage: Other ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 Project stage: Other ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 Project stage: Other ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 Project stage: Other ML13323A1832013-11-13013 November 2013 Project Units 1 and 2 - Supplement 1 to Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 Project stage: Supplement NOC-AE-13003043, Enclosure 5 - Response to NRC Supplemental Information Items2013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13323A1852013-11-13013 November 2013 Enclosure 3 - License Amendment Request for STP Piloted Risk-Informed Approach to Closure for GSI-191 Project stage: Request NOC-AE-13003054, Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal2013-11-21021 November 2013 Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Supplement ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 Project stage: Meeting NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request NOC-AE-13003065, Response to STP-GSI-191-EMCB-RAI-12013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting NOC-AE-13003057, Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application2014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14009A3072014-01-0909 January 2014 NRR E-mail Capture - Request for Additional Information - TACs MF2400 Through MF2409 Project stage: RAI ML13358A0622014-01-14014 January 2014 Summary of 12/16/13 Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14015A0452014-01-14014 January 2014 NRR E-mail Capture - Rai'S Regarding South Texas Project'S Submittal for Risk-Informed Resolution of GS-191 Project stage: Other ML14052A0532014-02-13013 February 2014 Project Units 1 & 2, Submittal of Casa Grande Code & Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Other NOC-AE-14003081, STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT42014-02-13013 February 2014 STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT4 Project stage: Request ML14149A4352014-02-14014 February 2014 Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 Project stage: Other ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 Project stage: Request ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 Project stage: Request ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 Project stage: Request ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 Project stage: Request ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 Project stage: Request ML14072A0762014-02-27027 February 2014 Project, Units 1 and 2, Submittal of GSI-191 Chemical Effects Test Reports (TAC Nos. MF2400 and MF2401) Project stage: Other ML14072A2112014-03-0606 March 2014 NRR E-mail Capture - STP Sensitivity Report and Presentation for Proposed Meeting Project stage: Request NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 32014-03-11011 March 2014 Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 Project stage: Other ML14086A3862014-03-17017 March 2014 STP Risk-Informed GSI-191 Aadb RAI 3 Response, Attachment 2 Project stage: Other ML14086A3852014-03-17017 March 2014 Project, Units 1 & 2 - Response to NRC Accident Dose Branch Request for Additional Information Regarding STP Risk-Informed GSI-191 Application Project stage: Request NOC-AE-14003111, Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing Application2014-03-18018 March 2014 Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing Application Project stage: Other NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. Project stage: Request ML14091A4522014-04-0808 April 2014 Request for Withholding Information from Public Disclosure - 12/9/13 G. Powell, STPNOC Affidavit Enclosing RELAP5 Digital Media Related to GSI-191 License Amendment and Exemption Requests Project stage: Withholding Request Acceptance ML14087A0752014-04-15015 April 2014 Request for Additional Information, Request for Exemptions and Revised Pilot License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: RAI 2013-12-05
[Table View] |
South Texas Project, Units 1 and 2 - Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing ApplicationML14087A126 |
Person / Time |
---|
Site: |
South Texas |
---|
Issue date: |
03/18/2014 |
---|
From: |
Powell G T South Texas |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
GSI-191, NOC-AE-14003111, STI: 33843525, TAC MF2400, TAC MF2401, TAC MF2402, TAC MF2403, TAC MF2404, TAC MF2405, TAC MF2406, TAC MF2407, TAC MF2408, TAC MF2409 |
Download: ML14087A126 (7) |
|
|
---|
Category:Legal-Affidavit
[Table view] Category:Letter
MONTHYEARML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance NOC-AE-240040, Nuclear Liability Certificates of Insurance2024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) 2024-09-30
[Table view] |
Text
Nuclear Operating CompanySouth Texas Project Electric Generaitn Stat'on P10 &. 289 Wadsworth, Te-as 77483 -March 18, 2014NOC-AE-14003 11110 CFR 2.390Attention: Document Control DeskU. S. Nuclear Regulatory CommissionWashington, DC 20555-0001South Texas ProjectUnits 1 and 2Docket Nos. STN 50-498 and 50-499Submittal of CASA Grande Source Codefor STP's Risk-Informed GSI- 191 Licensing Application(TAC NOS. MF2400, MF2401, MF2402, MF2403,MF2404, MF2405, MF2406, MF2407, MF2408, AND MF2409)
References:
- 1. Letter, G. T. Powell, STPNOC, to NRC Document Control Desk, "Supplement 1to Revised STP Pilot Submittal and Requests for Exemptions and LicenseAmendment for a Risk-Informed Approach to Resolving Generic Safety Issue(GSI)-191", November 13, 2013, NOC-AE-13003043, ML13323A1832. Los Alamos National Laboratory (LANL) inter-agency transfer of CASA Grandesource code to Southwest Research (SWRI): SWRI (Center for Nuclear WasteRegulatory Analyses) -License Tracking Number 14-N03333This submittal documents the transmittal of the CASA Grande source code used inReference 1.The CASA Grande source code is being transmitted separately by LANL to SWRI inReference 2 via an interagency transfer.The source code is protected under an exclusive commercialization agreement betweenLos Alamos National Security (operations manager of LANL) and Alion Science &Technology. Therefore, the information and analyses embodied in the code areconsidered to be proprietary to Alion and are accompanied by a formal request towithhold the documents from public disclosure in accordance with 1 OCFR2.390(Attachment 1). The source code is considered to be proprietary in its entirety, so noredacted non-proprietary version is provided.There are no regulatory commitments in this submittal.STI: 33843525 i-i £_.....
NOC-AE-14003111Page 2 of 3If there are any questions regarding this request, please contact Wayne Harrison at(361) 972-4745 or me at (361) 972-7566.I declare under penalty of perjury that the foregoing is true and correct.Executed on: Morck Ig. Zol+G. T. PowellSite Vice Presidentawh
Attachment:
Alion Affidavit for Withholding NOC-AE-14003111Page 3 of 3cc:(paper copy)(electronic copy)Regional Administrator, Region IVU. S. Nuclear Regulatory Commission1600 East Lamar BoulevardArlington, TX 76011-4511Balwant K. SingalSenior Project ManagerU.S. Nuclear Regulatory CommissionOne White Flint North (MS 8 B 1)11555 Rockville PikeRockville, MD 20852NRC Resident InspectorU. S. Nuclear Regulatory ConmnissionP. 0. Box 289, Mail Code: MN1 16Wadsworth, TX 77483Jim CollinsCity of AustinElectric Utility Department721 Barton Springs RoadAustin, TX 78704A. H. Gutternan, EsquireMorgan, Lewis & Bockius LLPBalwant K. SingalMichael MarkleyJohn StangU. S. Nuclear Regulatory CommissionJohn RaganChris O'HaraJim von SuskilNRG South Texas LPKevin PolloRichard PenaL.D. BlaylockCity Public ServicePeter NemethCrain Caton & James, P.C.C. MeleCity of AustinRichard A. RatliffTexas Department of State Health ServicesRobert FreeTexas Department of State Health Services AttaclunentNOC-AE-14003111Alion Application for Withholding 0 10 N ALION Science & TechnologySCIENCE AND TECHNOLOGYAFFIDAVITI, Megan A. Stachowiak, state as follows:(1) 1 am Division Manager, Nuclear Services, ALION Science & Technology ("Alion") andhave been delegated the function of reviewing the information described in paragraph(2) which is sought to be withheld, and have been authorized to apply for itswithholding.(2) The information sought to be withheld is CASA Grande v1.6 Source Code in itsentirety. This code was used to support the South Texas Project licensing submittal andis being submitted for Southwest Research Institute (SwRI) review. The source code isprotected by an exclusive commercialization agreement between Alion and Los AlamosNational Security (LANS), LLC.(3) In making this application for withholding of proprietary information of which it is theowner, Alion relies upon the exemption from disclosure set forth in the Freedom ofInformation Act ("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USCSec. 1905, and NRC regulations 10 CFR 9.17(a)(4), and 2.390(a)(4) for "trade secrets"(Exemption 4). The material for which exemption from disclosure is here sought alsoqualify under the narrower definition of "trade secret", within the meanings assigned tothose terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass EnergyProject v. Nuclear Regulatory Commission, 975F2d871 (DC Cir. 1992), and PublicCitizen Health Research Group v. FDA, 704F2d1280 (DC Cir. 1983).(4) Some examples of categories of information which fit into the definition of proprietaryinformation are:a. Information that discloses a process, method, or apparatus, including supportingdata and analyses, where prevention of its use by Alion's competitors withoutlicense from Alion constitutes a competitive economic advantage over othercompanies;b. Information which, if used by a competitor, would reduce his expenditure ofresources or improve his competitive position in the design, manufacture,shipment, installation, assurance of quality, or licensing of a similar product;c. Information which reveals aspects of past, present, or future Alion customer-funded development plans and programs, resulting in potential products to Alion;d. Information which discloses patentable subject matter for which it may bedesirable to obtain patent protection.The information sought to be withheld is considered to be proprietary for the reasons setPage I of 3MIAS Affidavit 0A LIONSCIENCE AND TECHNOLOGYforth in paragraphs (4) a, and (4) b, above.(5) To address 10 CFR 2.390 (b) (4), the information sought to be withheld is beingsubmitted to NRC in confidence. The information is of a sort customarily held inconfidence by Alion, and is in fact so held. The information sought to be withheld has,to the best of my knowledge and belief, consistently been held in confidence by Alion,no public disclosure has been made, and it is not available in public sources. Alldisclosures to third parties including any required transmittals to NRC, have been made,or must be made, pursuant to regulatory provisions or proprietary agreements whichprovide for maintenance of the information in confidence. Its initial designation asproprietary information, and the subsequent steps taken to prevent its unauthorizeddisclosure, are as set forth in paragraphs (6) and (7) following.(6) Initial approval of proprietary treatment of a document is made by the manager of theoriginating component, the person most likely to be acquainted with the value andsensitivity of the information in relation to industry knowledge. Access to suchdocuments within Alion is limited on a "need to know" basis.(7) The procedure for approval of external release of such a document typically requiresreview by the staff manager, project manager, principal scientist or other equivalentauthority, by the manager of the cognizant marketing function (or their delegate), andby the Legal Operation, for technical content, competitive effect, and determination ofthe accuracy of the proprietary designation. Disclosures outside Alion are limited toregulatory bodies, customers, and potential customers, and their agents, suppliers, andlicensees, and others with a legitimate need for the information, and then only inaccordance with appropriate regulatory provisions or proprietary agreements.(8) The document identified in paragraph (2), above, is classified as proprietary because itcontains "know-how" and "unique data" developed by Alion within our research anddevelopment programs. The development of this document, supporting methods anddata constitutes a major Alion asset in this current market.(9) Public disclosure of the information sought to be withheld is likely to cause substantialharm to Alion's competitive position and foreclose or reduce the availability of profit-making opportunities. The information is part of Alion's comprehensive BWR/PWRGSI-191 analysis base, and its commercial value extends beyond the originaldevelopment cost. The value of the technology base goes beyond the extensivephysical database and experimental methodology and includes development of theexpertise to determine and apply the appropriate evaluation process.The research, development, engineering, analytical and experimental costs comprise asubstantial investment of time and money by Alion.The precise value of the expertise to devise an evaluation process and apply the correctanalytical methodology is difficult to quantify, but it clearly is substantial.Page 2 of 3oMAS Affidavit A/LIONSCIENCE AND TECHNOLOGYAlion's competitive advantage will be lost if its competitors are able to use the results ofthe Alion experience to normalize or verify their own process or if they are able toclaim an equivalent understanding by demonstrating that they can arrive at the same orsimilar conclusions.The value of this information to Alion would be lost if the information were disclosedto the public. Making such information available to competitors without their havingbeen required to undertake a similar expenditure of resources would unfairly providecompetitors with a windfall, and deprive Alion of the opportunity to exercise itscompetitive advantage to seek an adequate return on its large investment in developingthese very valuable analytical tools.I declare under penalty of perjury that the foregoing affidavit and the matters stated thereinare true and correct to the best of my knowledge, information, and belief.Executed on this 13th day of March 2014.Meg/A. StachowiakDivision Manager, Nuclear ServicesALION Science & TechnologyPage 3 of 3PAAS Affidavit