San Onofre, Units 2 and 3 - Response to Request for Additional Information Regarding License Amendment Request for Permanent Use of Areva Fuel and for Permanent Exemption to Use M5 Cladding
ML12310A408
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/05/2012
From: St.Onge R J
Southern California Edison Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
TAC ME6820, TAC ME6821, TAC ME6822, TAC ME6823
Download: ML12310A408 (5)


Text

SOUTHERNCALIFORNIAEDISONRichardJ.St.OngeDirector,NuclearRegulatoryAffairsand.EmergencyPlanningAnEDISONINTERNATlONALCompanyU.S.NuclearRegulatoryCommissionATTN:DocumentControlDeskWashington,DC20555-0001November5,2012Subject:DocketNos.50-361and50-362ResponsetoRequestforAdditionalInformationRegardingLicenseAmendmentRequestforPermanentUseofAREVAFuelandforPermanentExemptiontoUseM5Cladding(TACNos.ME6820,ME6821,ME6822,ANDME6823)SanOnofreNuclearGeneratingStation,Units2and3References:1.LetterfromN.Kalyanam(NRC)toP.T.Dietrich(SCE)datedAugust1,2012;Subject:SanOnofreNuclearGeneratinqStation,Units2and3LicenseAmendmentRequestRE:UseofAREVAFuel(TACNos.ME6820,ME6821,ME6822,ANDME6823)2.LetterfromD.Bauder(SCE)toJ.Sebrosky(NRC)datedJuly29,2011;Subject:SanOnofreNuclearGeneratingStation,Units2and3ProposedPermanentExemptionRequestandProposedChange,Number(PCN)600,AmendmentApplicationNumbers261and249,RequestforUnrestrictedUseofAREVAFuel.DearSirorMadam:ByrequestdatedOctober9,2012,theNuclearRegulatoryCommissionissuedaRequestforAdditionalInformation(RAI)regardingunrestricteduseofAREVAfuelandpermanentexemptiontouseM5cladding.TheRAIrequestedaresponseonOctober15,2012.NRCstaffagreedbyphonethatSCEmaysubmittheresponsebyNovember8,2012.Theenclosureofthissubmittalcontainstheresponsetotherequestforadditionalinformation.Therearenonewregulatorycommitmentscontainedinthisletter.Ifyouhaveanyquestionsorrequireadditionalinformation,pleasecontactMs.LindaT.Conklin,LicensingManager,at(949)368-9443.Sincerely,P.O.Box128SanClemente,CA92672 DocumentControlDesk-2-November5,2012Enclosure:ResponsetoRequestforAdditionalInformation(RAI)regardingunrestricteduseofAREVAfuelandpermanentexemptiontouseM5claddingcc:E.E.Collins,RegionalAdministrator,NRCRegionIVR.Hall,NRCProjectManager,SanOnofreUnits2and3G.G.Warnick,NRCSeniorResidentInspector,SanOnofreUnits2and3

ENCLOSURE 1 Response to Request for Additional Information (RAI) regarding unrestricted use of AREVA fuel and permanent exemption to use M5 cladding The NRC staff has determined that the following information is required to complete its review.

1. Has the licensee identified any impact to operator interfaces associated with the proposed LAR, such as: a. Changes, additions, or deletions of operator actions?

SCE Response: No.

b. Changes to the timing of actions or the time available for actions? SCE Response: Yes. As identified in PCN-600 Attachment D, item D.56, the existing operator action to trip the Reactor Coolant Pumps on loss of net positive suction head now has a 7 minute time requirement associated with its performance. This 7 minute time requirement is being added to a new procedure, SO123-0-A9, "Time Critical Action Program." This program will validate and document the actual timing of the operator actions.

c. Changes, additions, or deletions to emergency or abnormal operating procedures?

SCE Response: Yes. As identified in PCN-600 Attachment D, item D.56 the Emergency Operating Instructions will be updated as needed to incorporate the 7 minute time requirement.

d. Changes, additions, or deletions control room controls, displays (including the safety parameter display system) or alarms? SCE Response: No. e. Changes, additions, or deletions to the control room plant reference simulator? SCE Response: No

f. Changes, additions, or deletions to the operator training program? SCE Response: Yes. As identified in PCN-600 Attachment D, item D.56 the operator training to support the 7 minute time requirement is being tracked as a requirement for implementation of this PCN. Operator training will incorporate SO123-0-A9, "Time Critical Action Program", to ensure the 7 minute time requirement will be met during simulator scenario exercises and dynamic tests.

If yes to any of the above, describe and justify acceptability. If no to all, stop here and respond to this question only.

2. Does the licensee intend to resolve the issues identified in Item 1. above (including the training of operators, if required), prior to operation using AREVA fuel? If no, justify why this is acceptable. SCE Response: Yes. A formal training request is in place to train on the new time requirement to secure the Reactor Coolant Pumps (RCPs) within 7 minutes of losing RCP net positive suction head during a Small Break LOCA. This training will be completed prior to use of AREVA fuel per this PCN