MONTHYEARML12207A2612012-08-0101 August 2012 Redacted, Request for Additional Information, License Amendment Request to Revise Technical Specification (TS) 2.1.1.2, TS 4.2.1, and TS 5.7.1.5, to Support Unrestricted Use of Areva Fuel Project stage: RAI ML12220A0492012-08-0707 August 2012 Request for Additional Information Email, Round 2, License Amendment Request to Revise Technical Specification (TS) 2.1.1.2, TS 4.2.1, and TS 5.7.1.5, to Support Unrestricted Use of Areva Fuel Project stage: RAI ML12237A0202012-09-0404 September 2012 Summary of Telephone Conference Issues Associated with License Amendment Request Related to Transition to Areva Fuel Project stage: Other ML12263A3002012-09-14014 September 2012 Response to Request for Additional Information Regarding License Amendment Request for Permanent Use of Areva Fuel and for Permanent Exemption to Use M5 Cladding Project stage: Response to RAI ML12275A4182012-09-27027 September 2012 Response to Request for Additional Information Question 11 Regarding License Amendment Request for Permanent Use of Areva Fuel and for Permanent Exemption to Use M5 Cladding Project stage: Response to RAI ML12272A0922012-09-28028 September 2012 License Amendment Request Areva Fuel Vqp; SCE-9801-P-A SER Pages of Interest Project stage: Request ML12283A2302012-10-0909 October 2012 Request for Additional Information Email, Round 3 W/Corrected Due Date, Request to Revise Technical Specification (TS) 2.1.1.2, TS 4.2.1, and TS 5.7.1.5, to Support Unrestricted Use of Areva Fuel Project stage: RAI ML12283A2252012-10-0909 October 2012 Request for Additional Information Email, Round 3, Request to Revise Technical Specification (TS) 2.1.1.2, TS 4.2.1, and TS 5.7.1.5, to Support Unrestricted Use of Areva Fuel Project stage: RAI ML12310A4082012-11-0505 November 2012 Response to Request for Additional Information Regarding License Amendment Request for Permanent Use of Areva Fuel and for Permanent Exemption to Use M5 Cladding Project stage: Response to RAI ML12320A2772012-11-30030 November 2012 Regulatory Audit Request for Amendment Request to Revise Technical Specifications (Tss) 2.1.1, 4.2.1, and 5.7.1.5; Exemption Request for Permanent Unrestricted Use of Areva Fuel Project stage: Other ML13051A4512013-02-15015 February 2013 Response to Request for Additional Information Regarding License Amendment Request for Permanent Use of Areva Fuel and for Permanent Exemption to Use M5 Cladding Project stage: Response to RAI ML13081A0192013-03-19019 March 2013 Response to Request for Additional Information Regarding License Amendment Request for Permanent Use of Areva Fuel and for Permanent Exemption to Use M5 Cladding Project stage: Response to RAI ML13105A1992013-04-11011 April 2013 Response to Request for Additional Information Regarding License Amendment Request for Permanent Use of Areva Fuel and for Permanent Exemption to Use M5 Cladding Project stage: Response to RAI ML13183A4122013-07-0101 July 2013 Withdrawal of Amendment Applications 261 and 249 Proposed Change Number (PCN) 600, Unrestricted Use of Areva Fuel Project stage: Withdrawal ML13177A2872013-07-0808 July 2013 Letter, Notice of Withdrawal of Application for Amendment to Revise Technical Specification (TS) 2.1.1, TS 4.2.1, and TS 5.7.1.5; Exemption Request for Permanent Unrestricted Use of Areva Fuel (TAC ME6820-ME6823) Project stage: Withdrawal NRC-2013-0155, FRN, Notice of Withdrawal of Application for Amendment to Revise Technical Specification (TS) 2.1.1, TS 4.2.1, and TS 5.7.1.5; Exemption Request for Permanent Unrestricted Use of Areva Fuel (TAC Nos. ME6820-ME6823)2013-07-0808 July 2013 FRN, Notice of Withdrawal of Application for Amendment to Revise Technical Specification (TS) 2.1.1, TS 4.2.1, and TS 5.7.1.5; Exemption Request for Permanent Unrestricted Use of Areva Fuel (TAC Nos. ME6820-ME6823) Project stage: Withdrawal ML13177A2902013-07-0808 July 2013 FRN, Notice of Withdrawal of Application for Amendment to Revise Technical Specification (TS) 2.1.1, TS 4.2.1, and TS 5.7.1.5; Exemption Request for Permanent Unrestricted Use of Areva Fuel (TAC Nos. ME6820-ME6823) Project stage: Withdrawal ML13150A2202013-11-27027 November 2013 Withdrawn_San Onofre, Units 2 and 3 - Request for Withholding Information from Public Disclosure - 3/19/13 Affidavit Executed by V. Nazareth, Nuclear Fuel Management, SONGS, Response to Request for Additional Information Project stage: RAI 2012-09-28
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 ML24191A2472024-07-0202 July 2024 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24141A0802024-05-15015 May 2024 (Songs), Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Operating Report IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 ML24094A0642024-03-27027 March 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Status Report 2023 ML24065A0152024-02-28028 February 2024 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation 2023 ML24044A0812024-02-14014 February 2024 LTR-24-0008: NRC Response to Paul Blanch Email Safety of Spent Nuclear Fuel at SONGS ISFSI IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) ML24037A0542024-01-30030 January 2024 (Songs), Units 2 and 3, Submittal of Annual Corporate Financial Reports ML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan ML24017A2432024-01-15015 January 2024 LTR-24-0008 Paul Blanch, E-mails Request for Formal Response to Requests for Meeting to Discuss Safety Issues with NRC Staff IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 and Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Service'S December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commission'S Analysis of Southern California Edison'S Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 ML22136A0842022-05-12012 May 2022 Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report 2024-09-18
[Table view] |
Text
SOUTHERNCALIFORNIAEDISONRichardJ.St.OngeDirector,NuclearRegulatoryAffairsand.EmergencyPlanningAnEDISONINTERNATlONALCompanyU.S.NuclearRegulatoryCommissionATTN:DocumentControlDeskWashington,DC20555-0001November5,2012Subject:DocketNos.50-361and50-362ResponsetoRequestforAdditionalInformationRegardingLicenseAmendmentRequestforPermanentUseofAREVAFuelandforPermanentExemptiontoUseM5Cladding(TACNos.ME6820,ME6821,ME6822,ANDME6823)SanOnofreNuclearGeneratingStation,Units2and3References:1.LetterfromN.Kalyanam(NRC)toP.T.Dietrich(SCE)datedAugust1,2012;Subject:SanOnofreNuclearGeneratinqStation,Units2and3LicenseAmendmentRequestRE:UseofAREVAFuel(TACNos.ME6820,ME6821,ME6822,ANDME6823)2.LetterfromD.Bauder(SCE)toJ.Sebrosky(NRC)datedJuly29,2011;Subject:SanOnofreNuclearGeneratingStation,Units2and3ProposedPermanentExemptionRequestandProposedChange,Number(PCN)600,AmendmentApplicationNumbers261and249,RequestforUnrestrictedUseofAREVAFuel.DearSirorMadam:ByrequestdatedOctober9,2012,theNuclearRegulatoryCommissionissuedaRequestforAdditionalInformation(RAI)regardingunrestricteduseofAREVAfuelandpermanentexemptiontouseM5cladding.TheRAIrequestedaresponseonOctober15,2012.NRCstaffagreedbyphonethatSCEmaysubmittheresponsebyNovember8,2012.Theenclosureofthissubmittalcontainstheresponsetotherequestforadditionalinformation.Therearenonewregulatorycommitmentscontainedinthisletter.Ifyouhaveanyquestionsorrequireadditionalinformation,pleasecontactMs.LindaT.Conklin,LicensingManager,at(949)368-9443.Sincerely,P.O.Box128SanClemente,CA92672 DocumentControlDesk-2-November5,2012Enclosure:ResponsetoRequestforAdditionalInformation(RAI)regardingunrestricteduseofAREVAfuelandpermanentexemptiontouseM5claddingcc:E.E.Collins,RegionalAdministrator,NRCRegionIVR.Hall,NRCProjectManager,SanOnofreUnits2and3G.G.Warnick,NRCSeniorResidentInspector,SanOnofreUnits2and3
ENCLOSURE 1 Response to Request for Additional Information (RAI) regarding unrestricted use of AREVA fuel and permanent exemption to use M5 cladding The NRC staff has determined that the following information is required to complete its review.
1. Has the licensee identified any impact to operator interfaces associated with the proposed LAR, such as: a. Changes, additions, or deletions of operator actions?
SCE Response: No.
- b. Changes to the timing of actions or the time available for actions? SCE Response: Yes. As identified in PCN-600 Attachment D, item D.56, the existing operator action to trip the Reactor Coolant Pumps on loss of net positive suction head now has a 7 minute time requirement associated with its performance. This 7 minute time requirement is being added to a new procedure, SO123-0-A9, "Time Critical Action Program." This program will validate and document the actual timing of the operator actions.
c. Changes, additions, or deletions to emergency or abnormal operating procedures?
SCE Response: Yes. As identified in PCN-600 Attachment D, item D.56 the Emergency Operating Instructions will be updated as needed to incorporate the 7 minute time requirement.
d. Changes, additions, or deletions control room controls, displays (including the safety parameter display system) or alarms? SCE Response: No. e. Changes, additions, or deletions to the control room plant reference simulator? SCE Response: No
- f. Changes, additions, or deletions to the operator training program? SCE Response: Yes. As identified in PCN-600 Attachment D, item D.56 the operator training to support the 7 minute time requirement is being tracked as a requirement for implementation of this PCN. Operator training will incorporate SO123-0-A9, "Time Critical Action Program", to ensure the 7 minute time requirement will be met during simulator scenario exercises and dynamic tests.
If yes to any of the above, describe and justify acceptability. If no to all, stop here and respond to this question only.
2. Does the licensee intend to resolve the issues identified in Item 1. above (including the training of operators, if required), prior to operation using AREVA fuel? If no, justify why this is acceptable. SCE Response: Yes. A formal training request is in place to train on the new time requirement to secure the Reactor Coolant Pumps (RCPs) within 7 minutes of losing RCP net positive suction head during a Small Break LOCA. This training will be completed prior to use of AREVA fuel per this PCN