Monticello - License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions
ML15022A165
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/09/2015
From: Fili K D
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15022A162 List:
References
L-MT-14-103, TAC MF5002
Download: ML15022A165 (3)


Text

ENCLOSURES 1, 3,4, 5 CONTAIN PROPRIETARY INFORMATIONWITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390XcelEnergyMonticello Nuclear Generating Plant2807 W County Rd 75Monticello, MN 55362January 9, 2015L-MT-14-10310 CFR 50.90U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001Monticello Nuclear Generating PlantDocket 50-263Renewed License No. DPR-22License Amendment Request for AREVA Extended Flow WindowSupplement to Respond to NRC Staff Questions (TAC No. MF5002)References: 1) Letter from Karen D. Fili (NSPM), to Document Control Desk (NRC),"License Amendment Request for AREVA Extended Flow Window,"L-MT-14-044, dated October 3, 2014. (ADAMS Accession No.ML14283A125)2) Email T. Beltz (NRC) to G. Adams (NSPM), "Monticello NuclearGenerating Plant -Acceptance Review (Opportunity to Supplement)re: AREVA Extended Flow Window License Amendment Request(TAC No. MF5002)," dated December 10, 2014.In Reference 1, Northern States Power Company, a Minnesota corporation (NSPM),doing business as Xcel Energy, requested approval of an amendment to the MonticelloNuclear Generating Plant (MNGP) Renewed Operating License (OL) and TechnicalSpecifications (TS). The proposed change would revise TS and would approve certainanalytical methods that together would support operation in the expanded power-flowoperating domain described as the Extended Flow Window (EFW). The purpose of therequested amendment is to transition from the General Electric methodology calledMaximum Extended Load Line Limit Analysis Plus (MELLLA+) to-the AREVAmethodology called EFW.In Reference 2, NRC Staff identified further information that was required to supporttheir acceptance review. The correspondence stated that the submitted LAR could besupplemented to provide the required information. The purpose of this supplement is toprovide the required information.The general approach to this supplement was discussed with NRC Staff in a telephoneconference on December 2, 2014.I)A_(

Document Control DeskPage 2Enclosure 1 provides AREVA Report ANP-3376P, Revision 0, which provides reply tothe questions posed in Reference 2. Enclosure 1 is proprietary to AREVA.Enclosure 2 provides the non-proprietary AREVA Report ANP-3376NP, Revision 0.The nonproprietary report is being provided based on the NRC's expectation that thesubmitter of the proprietary information should provide, if.possible, a nonproprietaryversion of the document with brackets showing where the proprietary information hasbeen deleted.Enclosure 3 provides AREVA FS1 -0008928, FSQA-07-AISHA User and Programmer'sManual for BWR Transient Analysis Including Large Oscillations, Revision 2.0. Thismanual is proprietary in its entirety.Enclosure 4 provides AREVA FS1-0008916, FSQA-07-SINANO User's andProgrammer's Manual, Revision 2.0. This manual is proprietary in its entirety.Enclosure 5 provides AREVA Report EMF-2279(P), Revision 0, STAIF: A ComputerProgram for BWR Stability in the Frequency Domain -Theory Manual, datedSeptember 2001. This manual is proprietary in its entirety.Enclosure 6 provides affidavits executed to support withholding Enclosures 1, 3, 4, and5 from public disclosure. These Enclosures contain proprietary information as definedby 10 CFR 2.390. The affidavit sets forth the basis on which the information may bewithheld from public disclosure by the NRC and addresses with specificity theconsiderations listed in 10 CFR 2.390(b)(4). Accordingly, NSPM respectfully requeststhat the AREVA proprietary information in Enclosures 1, 3, 4, and 5 be withheld frompublic disclosure in accordance with 10 CFR 2.390(a)4, as authorized by 10 CFR9.17(a)4.Correspondence with respect to the copyright or proprietary aspects of the AREVAinformation in Enclosure 4 or the supporting AREVA affidavits in Enclosure 6 should beaddressed to Mr. Alan Meginnis, Manager- Product Licensing, AREVA Inc.,2101 Horn Rapids Road, Richland, Washington 99354.The information offered herein does not affect the conclusions of the SignificantHazards Consideration and the Environmental Consideration evaluations provided inthe Reference 1 LAR.In accordance with 10 CFR 50.91(b), a copy of this application supplement is beingprovided to the designated Minnesota Official without enclosures.If there are any questions or if additional information is needed, please contact GlennAdams at 612-330-6777.

Document Control DeskPage 3Summary of CommitmentsThis letter makes no new commitments and no revisions to existing commitments.I declare under penalty of perjury that the foregoing is true and correct.Executed on: January 9, 2015Kar4- D. FiliSite Vice-PresidentMonticello Nuclear Generating PlantNorthern States Power Company-MinnesotaEnclosures (6)cc: Administrator, Region III, USNRCProject Manager, Monticello Nuclear Generating Plant, USNRCResident Inspector, Monticello Nuclear Generating Plant, USNRCMinnesota Department of Commerce (w/o enclosures)