NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance Review for License Amendment Request Transition to Areva Extended Flow Window Methodology
ML15030A009
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/28/2015
From: Beltz T
Plant Licensing Branch III
To: George Adams
Northern States Power Co
References
TAC NF5002
Download: ML15030A009 (3)


Text

NRR-PMDAPEm Resource From: Beltz, Terry Sent: Wednesday, January 28, 2015 6:41 AM To: 'Adams, Glenn D.'

Cc: Eckholt, Gene F. (Eugene.Eckholt@xenuclear.com); Ward, Anne E.

(Anne.Ward@xenuclear.com); 'Loeffler, Richard A.'; Pelton, David

Subject:

Monticello Nuclear Generating Plant - Acceptance Review for License Amendment Request re: Transition to AREVA Extended Flow Window Methodology (TAC No. MF5002)

Dear Mr. Adams:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 3, 2014 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML14283A125), Northern States Power Company - Minnesota (NSPM, the licensee), doing business as Xcel Energy, Inc., submitted a license amendment request (LAR) for the Monticello Nuclear Generating Plant (MNGP). The application was supplemented by letter dated January 9, 2015 (ADAMS Accession Nos. ML15022A165 and ML15022A167).

NSPM proposes to revise the MNGP technical specifications and seeks approval of certain analytical methods that would support operation in the expanded power-flow operating domain described as the Extended Flow Window (EFW). The purpose of the requested amendment is to transition from the current Maximum Extended Load Line Limit Analysis Plus (MELLLA+) methodology to the AREVA EFW methodology.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The purpose of this e-mail is to provide the final results of the NRC staffs acceptance review of this request.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that there appears to be sufficient technical information, both in scope and depth, to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the LAR in terms of regulatory requirements and the protection of public health and safety and the environment.

If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

Should you have any questions regarding this review, please contact me at (301) 415-3049.

Sincerely, TERRY A. BELTZ, SENIOR PROJECT MANAGER U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mail Stop: O-8D15 Phone: (301) 415-3049 Terry.Beltz@nrc.gov 1

Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system.

2

Hearing Identifier: NRR_PMDA Email Number: 1843 Mail Envelope Properties (87B1F1BDFE5A554CA9DC5EAA75EB6D0D01B9C7F8EDD9)

Subject:

Monticello Nuclear Generating Plant - Acceptance Review for License Amendment Request re: Transition to AREVA Extended Flow Window Methodology (TAC No. MF5002)

Sent Date: 1/28/2015 6:41:10 AM Received Date: 1/28/2015 6:41:00 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:

"Eckholt, Gene F. (Eugene.Eckholt@xenuclear.com)" <Eugene.Eckholt@xenuclear.com>

Tracking Status: None "Ward, Anne E. (Anne.Ward@xenuclear.com)" <Anne.Ward@xenuclear.com>

Tracking Status: None

"'Loeffler, Richard A.'" <Richard.Loeffler@xenuclear.com>

Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov>

Tracking Status: None

"'Adams, Glenn D.'" <Glenn.Adams@xenuclear.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 3464 1/28/2015 6:41:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: