Letter Sequence Request |
|---|
CAC:MF8060, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
|
MONTHYEARGO2-16-096, License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate2016-06-28028 June 2016 License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate Project stage: Request ML16218A3902016-08-0808 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Request for Measurement Uncertainty Recapture (MUR) Power Uprate (from 3486 Mwt to 3544 Mwt) Project stage: Acceptance Review GO2-16-124, Response to License Amendment Request, Opportunity to Supplement2016-08-18018 August 2016 Response to License Amendment Request, Opportunity to Supplement Project stage: Supplement ML16243A3662016-09-0101 September 2016 Acceptance of Requested Licensing Action Measurement Uncertainty Recapture Project stage: Acceptance Review ML16207A0332016-09-14014 September 2016 Request for Withholding from Public Disclosure - 5/18/16 Affidavit Executed by E. Hauser, Caldon Ultrasonics Technology Center, Cameron Engineering Report ER-1049, Revision 3 Project stage: Other ML16207A0162016-09-14014 September 2016 Request for Withholding from Public Disclosure - 5/18/16 Affidavit Executed by E. Hauser, Caldon Ultrasonics Technology Center, Cameron Engineering Report ER-1074, Revision 0 Project stage: Other ML16246A2812016-09-14014 September 2016 Request for Withholding Information from Public Disclosure, 6/9/16 Affidavit Executed by J. Harrison, GE-Hitachi and 6/14/16 Affidavit Executed by N. Wilmshurst, EPRI, Related to NEDC-33853P, Revision 0 Project stage: Withholding Request Acceptance ML16265A1512016-09-21021 September 2016 NRR E-mail Capture - FW: Request for Non Proprietary Version of Tpo Lic Topical Rept - NEDC-32938P-A_Rev_2 Project stage: Request ML16302A0392016-10-27027 October 2016 NRR E-mail Capture - Request for Additional Information, Columbia MUR LAR: Fire Protection Project stage: RAI ML16306A2942016-11-0101 November 2016 NRR E-mail Capture - Request for Additional Information, Columbia MUR LAR: Esgb, Coating and FAC, CAC MF8060 Project stage: RAI GO2-16-153, Response to Request for Additional Information Regarding MUR License Amendment Request Fire Protection2016-11-10010 November 2016 Response to Request for Additional Information Regarding MUR License Amendment Request Fire Protection Project stage: Response to RAI ML16323A1192016-11-16016 November 2016 NRR E-mail Capture - Eicb RAIs for Columbia MUR Project stage: RAI ML16327A1842016-11-22022 November 2016 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia MUR Power Uprate Project stage: RAI GO2-16-161, Response to Request for Additional Information, Columbia MUR LAR: Esgb, Coating and FAC2016-12-0808 December 2016 Response to Request for Additional Information, Columbia MUR LAR: Esgb, Coating and FAC Project stage: Response to RAI GO2-16-173, Supplement to Response to Request for Additional Information Related to Columbia LAR: Fire Protection RAI-12016-12-12012 December 2016 Supplement to Response to Request for Additional Information Related to Columbia LAR: Fire Protection RAI-1 Project stage: Supplement ML17006A0902017-01-0404 January 2017 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia MUR Power Uprate Project stage: RAI ML17006A0922017-01-0404 January 2017 NRR E-mail Capture - Eicb RAIs for Columbia MUR Project stage: RAI GO2-17-014, Response to Request for Additional Information Human Performance2017-01-0909 January 2017 Response to Request for Additional Information Human Performance Project stage: Response to RAI GO2-17-015, Energy Northwest - Transmittal of Response to Request for Additional Information, Columbia MUR LAR: Electrical Instrument and Controls Branch (Eicb) and Reactor Systems Branch (Srxb)2017-01-12012 January 2017 Energy Northwest - Transmittal of Response to Request for Additional Information, Columbia MUR LAR: Electrical Instrument and Controls Branch (Eicb) and Reactor Systems Branch (Srxb) Project stage: Response to RAI 05000397/LER-2016-003, Regarding Failure of Fan to Start Results in Momentary Increase in Secondary Containment Pressure2017-01-12012 January 2017 Regarding Failure of Fan to Start Results in Momentary Increase in Secondary Containment Pressure Project stage: Request ML17047A7492017-02-16016 February 2017 Response to Request for Additional Information, Columbia MUR LAR Evib Rais Project stage: Response to RAI GO2-17-049, Response to Request for Additional Information, Columbia MUR LAR Evib Rais, Enclosure 22017-02-16016 February 2017 Response to Request for Additional Information, Columbia MUR LAR Evib Rais, Enclosure 2 Project stage: Response to RAI ML17066A4932017-03-0707 March 2017 Submittal of Additional Information in Response to MUR LAR: Primary Element Accuracy Calculation Project stage: Other ML17087A5692017-04-12012 April 2017 Request for Withholding Information from Public Disclosure for Columbia Generating Station Project stage: Withholding Request Acceptance ML17095A1172017-05-11011 May 2017 Issuance of Amendment No. 241 Measurement Uncertainty Recapture Project stage: Approval 2016-08-08
[Table View] |
LER-2016-003, Regarding Failure of Fan to Start Results in Momentary Increase in Secondary Containment Pressure |
| Event date: |
|
|---|
| Report date: |
|
|---|
| Reporting criterion: |
10 CFR 50.73(a)(2)(v), Loss of Safety Function
10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded
10 CFR 50.73(a)(2)(viii)(A)
10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition
10 CFR 50.73(a)(2)(viii)(B)
10 CFR 50.73(a)(2)(ix)(A)
10 CFR 50.73(a)(2)(iv)(A), System Actuation
10 CFR 50.73(a)(2)(x)
10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor
10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat
10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown
10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
10 CFR 50.73(a)(2)(vii), Common Cause Inoperability |
|---|
| 3972016003R00 - NRC Website |
|
text
ENERGY NORTHWEST G02-17-016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Alex L. Javorik Columbia Generating Station P.O. Box 968, PE04 Richland, WA 99352-0968 Ph. 509.377.8555 I F. 509.377.4150 aljavorik@energy-northwest.com 10 CFR 50.73
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LICENSEE EVENT REPORT NO. 2016-003-00
Dear Sir or Madam:
Transmitted herewith is Licensee Event Report No. 2016-003-00 for Columbia Generating Station. This report is submitted pursuant to 10 CFR 50.73(a)(2)(v)(C) and 10 CFR 50.73(a)(2)(v)(D).
There are no commitments being made to the NRC by this letter. If you have any questions or require additional information, please contact Ms. D.M. Wolfgramm, Regulatory Compliance Supervisor, at (509) 377-4792.
Executed on I.. / z - I 7 Respectfully, A. L. J vorik Vice President, Engineering
Enclosure:
Licensee Event Report 2016-003-00 cc: NRC Region IV Administrator NRC NRA Project Manager NRC Senior Resident lnspector/988C CD Sonoda - BPA/1399 WA Horin -Winston & Strawn January 12, 2017
NRC FORM366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 10/31/2018 (06-2016)
Estimated burden per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />.
.,,...... ~~
Reported lessons learned are incorporated into the licensing process and fed back to industry.
~¥.\\
LICENSEE EVENT REPORT (LER)
Send comments regarding burden estimate to the FOIA, Privacy and Information Collections Ii Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail
\\, l (See Page 2 for required number of digits/characters for each block) to lnfocoilects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. If a (See NUREG-1022, R.3 for instruction and guidance for completing this form means used to impose an information collection does not display a currently valid OMB control bUQ * [fwww nrc gQvLreadiog-[!Il[dog-coll!agtiQClSlntm~gslstafflsr:J 022Lr3L) number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 3. PAGE Columbia Generating Station 05000 397 1 OF 3
- 4. TITLE Failure of Fan to Sta11 Results in Momentary Increase in Secondary Containment Pressure
- 5. EVENT DATE
- 6. LER NUMBER
- 7. REPORT DATE
- 8. OTHER FACILITIES INVOLVED I
SEQUENTIAL I REV FACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR MONTH DAY YEAR NUMBER NO.
05000 FACILITY NAME DOCKET NUMBER 11 20 2016 2016. 003. 00 01 12 2017 05000
- 9. OPERA TING MODE
- 11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply)
D 20.2201(b)
D 20.2203(a)(3)(i>
D 50.73(a)(2)(ii)(A)
D 50.73(a)(2)(viii)(A) 1 D 20.2201 (d)
D 20.2203(a)(3)(ii)
D 50.73(a)(2)(ii)(B)
D 50.73(a)(2)(viii)(B)
D 20.2203(a)(1 >
D 20.2203(a)(4)
D so. 13<a><2><iii)
D 50.73(a)(2)(ix)(A)
D 20.2203(a)(2)(i)
D 50.36(c)(1 )(i)(A)
D 50.73(a)(2)(iv)(A)
D 50.73(a)(2)(x)
- 10. POWER LEVEL D 20.2203<a><2><ii)
D 50.36(c)(1 )(ii)(A)
D 50.73(a)(2)(v)(A)
D 13.11ca><4>
D 20.2203ca>c2>cm>
D so.3scc>c2>
D 50.73(a)(2)(v)(B)
D 13.11<a>
D 20.2203(a)(2)(iv)
D so.4sca><3)(ii)
[{] 50.73(a)(2)(v)(C)
D 13.11<a>c1 >
97 D 20.2203(a)(2)(v)
D 50.73(a)(2)(i)(A)
[{] 50.73(a)(2)(v)(D)
D 13.11ca><2>
D 20.2203(a)(2)(vi)
D 50.73(a)(2)(i)(B)
D 50.73(a)(2)(vii)
D 13. 11<a>c2><ii)
D 50. 73(a)(2)(i)(C)
OorHER Specify in Abstract below or in
Similar Events
A loss of the ability to maintain Secondary Containment pressure greater than required by Technical Specifications has occurred at, and was reported by, Columbia Generating Station (Columbia) twice in the past two years. The first incident was the result of an incorrectly sized lug installed in the fuse block during initial construction and the second incident occurred when an exhaust air valve unexpectedly closed. Prior to this two year time period, Columbia has experienced losses of Secondary Containment due to weather-related conditions, as well as human performance errors. Columbia has implemented corrective actions for these previous events.
Further Corrective Actions Causal evaluation determined that the failure of the fan was a result of a faulty control switch; corrective actions are to replace the control switch for fan REA-FN-1 B. Additionally, the control switches for the System A exhaust air fan and both Reactor Building supply air fans will be replaced as well, as they are the same make, model, and age as the control switch in fan REA-FN-1 B.
Energy Industry Identification System (EllS) Information codes from IEEE Standards 805-1984 and 803-1983 are represented in brackets as [XX] and [XXX] throughout the body of the narrative. Page 3
of 3
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000397/LER-2016-001, Regarding Manual Reactor Scram Following Loss of Reactor Closed Cooling | Regarding Manual Reactor Scram Following Loss of Reactor Closed Cooling | 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(iv)(B)(1) 10 CFR 50.73(a)(2)(viii)(B) | | 05000397/LER-2016-002, Regarding Valve Closure Results in Momentary Increase in Secondary Containment Differential Pressure | Regarding Valve Closure Results in Momentary Increase in Secondary Containment Differential Pressure | 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System 10 CFR 50.73(a)(2)(viii)(A) | | 05000397/LER-2016-003, Regarding Failure of Fan to Start Results in Momentary Increase in Secondary Containment Pressure | Regarding Failure of Fan to Start Results in Momentary Increase in Secondary Containment Pressure | 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) | | 05000397/LER-2016-004, Regarding Automatic Scram Due to Off-Site Load Reject | Regarding Automatic Scram Due to Off-Site Load Reject | 10 CFR 50.73(a)(2)(iv)(A), System Actuation | | 05000397/LER-2016-005, Regarding Leak in Minimum Flow Line Makes HPCS and Primary Containment Inoperable | Regarding Leak in Minimum Flow Line Makes HPCS and Primary Containment Inoperable | 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
|