MONTHYEARGO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-23-019, Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-012023-02-0808 February 2023 Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-01 GO2-22-131, Guarantee of Payment of Deferred Premium2022-12-19019 December 2022 Guarantee of Payment of Deferred Premium GO2-22-122, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-11-28028 November 2022 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-076, Status of License Renewal Commitments2022-10-31031 October 2022 Status of License Renewal Commitments GO2-22-110, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor2022-10-17017 October 2022 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor GO2-22-096, Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b 2024-09-24
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARGO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-22-122, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-11-28028 November 2022 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-096, Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-075, Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves2022-07-11011 July 2022 Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves GO2-21-101, Response to Request for Additional Information Related to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35)2021-08-24024 August 2021 Response to Request for Additional Information Related to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) GO2-21-108, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2021-08-20020 August 2021 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO GO2-21-084, Response to Request for Additional Information Related to On-Site Cooling System Sediment Disposal2021-06-23023 June 2021 Response to Request for Additional Information Related to On-Site Cooling System Sediment Disposal GO2-20-150, Response to Request for Additional Information Related to Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-On-Force Exercises, Due to COVID-192020-12-0303 December 2020 Response to Request for Additional Information Related to Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-On-Force Exercises, Due to COVID-19 GO2-20-127, Response to Request for Additional Information Related to Fourth Interval Inservice Inspection (ISI) Program Request 4ISI-092020-10-22022 October 2020 Response to Request for Additional Information Related to Fourth Interval Inservice Inspection (ISI) Program Request 4ISI-09 GO2-20-120, Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating2020-09-0101 September 2020 Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating ML20240A3452020-08-27027 August 2020 Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating GO2-20-118, Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating2020-08-24024 August 2020 Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating GO2-20-086, Response to Request for Additional Information Related to Reduction in Commitment to the Columbia Operational Quality Program Description2020-06-0101 June 2020 Response to Request for Additional Information Related to Reduction in Commitment to the Columbia Operational Quality Program Description GO2-20-071, Response to Request for Additional Information Related to Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution Systems2020-04-23023 April 2020 Response to Request for Additional Information Related to Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution Systems GO2-20-029, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance...2020-02-19019 February 2020 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance... GO2-19-124, Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating2019-08-20020 August 2019 Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating GO2-19-111, Response to Request for Additional Information Related to License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System2019-07-30030 July 2019 Response to Request for Additional Information Related to License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System GO2-18-102, Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Re-Renewed Facility Operating License and Technical Specification Clean-Up2018-08-0707 August 2018 Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Re-Renewed Facility Operating License and Technical Specification Clean-Up GO2-18-075, Response to Request for Additional Information for TSTF-542 License Amendment Request2018-06-27027 June 2018 Response to Request for Additional Information for TSTF-542 License Amendment Request ML18191A2052018-06-19019 June 2018 Forwards Response to NRC Comments of July 7, 1977 and February 23, 1978 on Caorso Test Plan GO2-17-186, Response to Request for Additional Information Related to License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies2018-01-0202 January 2018 Response to Request for Additional Information Related to License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies GO2-17-204, Energy Northwest Submittal of the Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 Crf 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review ...2017-12-28028 December 2017 Energy Northwest Submittal of the Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 Crf 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review ... GO2-17-175, Response to Request for Additional Information Related to License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System2017-11-20020 November 2017 Response to Request for Additional Information Related to License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System GO2-17-166, Response to Request for Additional Information for Relief Request 3ISI-192017-10-0303 October 2017 Response to Request for Additional Information for Relief Request 3ISI-19 GO2-17-107, Response to Request for Additional Information for Relief Request 3ISI-162017-06-26026 June 2017 Response to Request for Additional Information for Relief Request 3ISI-16 GO2-17-119, Supplement to Response to Request for Additional Information Related to License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01 Revision 62017-06-21021 June 2017 Supplement to Response to Request for Additional Information Related to License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01 Revision 6 GO2-17-093, Response to Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutro-Absorbing Materials in Spent Fuel Pools - Licensee-Reported Category 3 Plants2017-05-0202 May 2017 Response to Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutro-Absorbing Materials in Spent Fuel Pools - Licensee-Reported Category 3 Plants ML17066A4932017-03-0707 March 2017 Submittal of Additional Information in Response to Mur LAR: Primary Element Accuracy Calculation GO2-17-048, Response to Request for Additional Information Related to License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI-99-01 Revision 6 (MF8219)2017-02-23023 February 2017 Response to Request for Additional Information Related to License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI-99-01 Revision 6 (MF8219) GO2-17-049, Response to Request for Additional Information, Columbia Mur LAR Evib Rais, Enclosure 22017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais, Enclosure 2 GO2-17-014, Response to Request for Additional Information Human Performance2017-01-0909 January 2017 Response to Request for Additional Information Human Performance GO2-16-173, Supplement to Response to Request for Additional Information Related to Columbia LAR: Fire Protection RAI-12016-12-12012 December 2016 Supplement to Response to Request for Additional Information Related to Columbia LAR: Fire Protection RAI-1 GO2-16-161, Response to Request for Additional Information, Columbia Mur LAR: Esgb, Coating and FAC2016-12-0808 December 2016 Response to Request for Additional Information, Columbia Mur LAR: Esgb, Coating and FAC GO2-16-155, Response to Request for Additional Information for License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1, Reactor Core Sls from the Reactor Systems Branch2016-11-17017 November 2016 Response to Request for Additional Information for License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1, Reactor Core Sls from the Reactor Systems Branch GO2-16-153, Response to Request for Additional Information Regarding Mur License Amendment Request Fire Protection2016-11-10010 November 2016 Response to Request for Additional Information Regarding Mur License Amendment Request Fire Protection GO2-16-128, Response to Request for Additional Information Related to Relief Request 4ISI-06 Regarding Code Case N-666-12016-09-20020 September 2016 Response to Request for Additional Information Related to Relief Request 4ISI-06 Regarding Code Case N-666-1 GO2-16-107, Response to Request for Additional Information Related to Relief Request 4ISI-05 Regarding Reactor Pressure Vessel Flange Leak-Off Lines and Code Case N-8052016-08-0303 August 2016 Response to Request for Additional Information Related to Relief Request 4ISI-05 Regarding Reactor Pressure Vessel Flange Leak-Off Lines and Code Case N-805 GO2-16-090, Response to Request for Additional Information for Relief Request 4ISI-022016-07-14014 July 2016 Response to Request for Additional Information for Relief Request 4ISI-02 GO2-16-070, Response to Request for Additional Information Associated with Expedited Seismic Evaluation Process Submittal2016-05-17017 May 2016 Response to Request for Additional Information Associated with Expedited Seismic Evaluation Process Submittal GO2-16-057, Response to Second Request for Additional Information RAI) Related to an Amendment to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2016-04-0707 April 2016 Response to Second Request for Additional Information RAI) Related to an Amendment to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program GO2-15-173, Supplement to Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 32015-12-28028 December 2015 Supplement to Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 GO2-15-152, Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 32015-11-17017 November 2015 Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 GO2-15-145, Response to Request to Additional Information (RAI) 3 on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 32015-10-29029 October 2015 Response to Request to Additional Information (RAI) 3 on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 GO2-16-021, R02 15-5462, Revision a, Expedited Seismic Evaluation Process (ESEP) Report2015-10-27027 October 2015 R02 15-5462, Revision a, Expedited Seismic Evaluation Process (ESEP) Report GO2-15-137, Response to the Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations2015-09-24024 September 2015 Response to the Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations GO2-15-128, Response to Request for Additional Information Regarding License Amendment Request for Adopt Technical Specification Task Force (TSTF)-425, Revision 32015-09-17017 September 2015 Response to Request for Additional Information Regarding License Amendment Request for Adopt Technical Specification Task Force (TSTF)-425, Revision 3 ML18191A2031978-06-30030 June 1978 Response to NRC Request for Additional Information (Round 3 Questions) ML18191A2381977-12-16016 December 1977 Advising of Intention to Complete Evaluation Regarding BWR Relief Valve Control System & Associated Containment Loads for Wppss Nuclear Project No. 2 Is Scheduled During 2nd Quarter of 1978 2024-09-24
[Table view] |
Text
Alex L. Javorik Columbia Generating Station P.O. Box 968, PE04 Richland, WA 99352-0968 Ph. 509-377-8555 l F. 509-377-2354 aljavorik@energy-northwest.com January 9, 2017 GO2-17-014 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION, COLUMBIA MUR LAR RAIS: HUMAN PERFORMANCE
References:
- 1. Letter GO2-16-096 from A. L. Javorik (Energy Northwest) to NRC:
"License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture (MUR) Power Uprate," dated June 28, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16183A365)
- 2. Letter GO2-16-124 from A. L. Javorik (Energy Northwest) to NRC:
"Response to License Amendment Request - Opportunity to Supplement,"
dated August 18, 2016 (ADAMS ML16231A511)
- 3. E-mail from J. Klos (NRC) to R. M. Garcia (Energy Northwest)
"Columbia MUR LAR RAIs: Human performance," dated December 7, 2016 (CAC No. MF8060)
Dear Sir or Madam:
By Reference 1, Energy Northwest submitted a license amendment for Columbia Generating Station (Columbia) to recapture certain measurement uncertainty as a power uprate. By Reference 2, Energy Northwest supplemented the original request. In Reference 3, the NRC requested additional information related to Reference 1. The enclosure to this letter contains the information requested in Reference 3. A clarification call was held on December 7, 2016 and during that call Energy Northwest agreed to submit the response to the RAIs by Monday January 9, 2017.
The No Significant Hazards Consideration Determination (NSHCD) provided in the original submittal is not altered by this submittal. This letter contains no regulatory commitments.
If you have any questions or require additional information, please contact Mr. R. M.
Garcia at (509) 377-8463.
G02-17-014 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct.
er t'"- -
Executed this I day of Jilf u a'J, 2017.
Respectfully, A. L. Jav i Vice President, Engineering
Enclosure:
As stated cc: NRC RIV Regional Administrator CD Sonoda - BPA/1399 (email)
NRC NRA Project Manager WA Horin -Winston & Strawn NRC Senior Resident lnspector/988C RR Cowley -WDOH (email)
EFSECutc.wa.gov-- EFSEC (email}
GO2-17-014 Enclosure Page 1 of 3 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION: HUMAN PERFORMANCE By letter dated June 28, 2016, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16183A365), as supplemented by letter dated August 18, 2016 (ADAMS Accession No. ML16231A511), Energy Northwest submitted a license amendment for Columbia Generating Station (CGS)[Columbia]. The proposed amendment would revise the operating license and technical specifications (TS) to implement an increase in rated thermal power from the current licensed thermal power of 3486 megawatts thermal (MWt) to a measurement uncertainty recapture (MUR) thermal power of 3544 MWt.
The NRC Regulatory Issue Summary (RIS) 2002-003: Guidance on the Content of Measurement Uncertainty Recapture Power Uprate Applications was developed by the U.S. Nuclear Regulatory Commission (NRC) staff to provide guidance to licensees on the scope and detail of the information that should be provided to the NRC for reviewing measurement uncertainty recapture power uprate applications. Specifically, Attachment 1,Section VII, Other, of the RIS contains a standard set of questions for human performance reviews.
NRC RAI - 1:
RIS 2002-03, Attachment 1,Section VII.1, states that the licensee should provide a statement confirming that operator actions that are sensitive to the power uprate, including any effects on the time available for operator actions, have been identified and evaluated.
Please describe any changes in timing to the operator actions for the proposed amendment.
ENERGY NORTHWEST RESPONSE TO RAI - 1:
As stated in Section 3.4.6 of the submittal, the operator responses to plant transients or accidents are not sensitive to the proposed power uprate changes. The time-critical operator actions identified by plant procedures were reviewed and are unaffected.
Changes to the setpoints proposed to support the power uprate only change the trigger point for an existing action, not the action or it's timing. The only new actions being proposed are those associated with the proposed Licensee Controlled Specification provided in Enclosure 3 of the submittal. Those actions although similar to other existing actions required by the station's technical specifications are only followed when the LEFMs become degraded and are not associated with the Final Safety Analysis Report or TS accident or transient.
NRC RAI - 2:
RIS 2002-03, Attachment 1,Section VII.2.B, states that the licensee should provide a statement confirming that they have identified all modifications associated with the proposed power uprate, with respect to the control room controls, displays (including the safety parameter display system) and alarms to ensure that changes in operator actions do not adversely affect defense in depth or safety margins.
GO2-17-014 Enclosure Page 2 of 3 The licensee stated in Enclosure 1, Section 3.4.3, Plant modifications, of the MUR LAR, ADAMS Accession No. ML16183A365 that the evaluations performed to support the MUR power uprate identified that no physical modifications are required to plant systems. However, software changes to [Plant Process Computer] PPC are required to support the interface with the [Leading Edge Flow Meter] LEFM system for operation above the [Current License Thermal Power]
CLTP limit of 3486 [Megawatts thermal] MWt.
The licensee has identified non-safety related systems affected by the proposed LAR
[License Amendment Request], but there is no specific mention of the Safety Parameter Display System (SPDS).
Please describe the effects of the proposed amendment on the SPDS, if any.
ENERGY NORTHWEST RESPONSE TO RAI - 2:
As stated in Enclosure 1, Section 3.4.3, of the submittal, software changes to the PPC are required to support the interface with LEFM. The PPC display is being updated as part of the software changes to support the proposed licensee controlled specifications.
However, the installation of MUR at Columbia has no impact on the SPDS and no changes to SPDS are being made.
NRC RAI - 3:
RIS 2002-03, Attachment 1,Section VII.2.C, states that the licensee should provide a statement confirming that they have identified all modifications associated with the proposed power uprate, with respect to the control room plant reference simulator to ensure that changes in operator actions do not adversely affect defense in depth or safety margins.
The licensee stated in the MUR LAR, Enclosure 9, Safety Analysis Report for Columbia Generating Station Thermal Power Optimization, Section 10.5, Operator Training and Human Factors, ADAMS Accession No. ML16183A365 that; Simulator changes and validation for the TPO [Thermal Power Optimization] will be performed in accordance with established CGS [Columbia] plant simulator certification testing procedures.
Please describe the established CGS plant simulator certification testing procedures. In your response, describe whether the simulator certification testing procedures meet the guidance of Regulatory Guide 1.149, Nuclear Power Plant Simulation Facilities for Use in Operator Training, License Examinations, and Applicant Experience Requirements Rev. 4, which endorses ANSI/ANS-3.5-1998, Nuclear Power Plant Simulators for Use in Operator Training and Examination or describe another method that meets the applicable regulations.
ENERGY NORTHWEST RESPONSE TO RAI - 3:
As part of the Columbia plant modification program, the engineering change associated with the proposed power uprate was reviewed and initiated the required simulator change report to change the control room plant reference simulator. As stated in Commentment 3 of Enclosure 6 of the submittal, the plant simulator will be modified for
GO2-17-014 Enclosure Page 3 of 3 the uprated conditions and the changes will be validated in accordance with plant configuration control processes prior to use above 3486 MWt.
The Columbia simulator management procedure controls plant simulator certification testing and satisfies the guidelines for simulator testing, performance, fidelity, and configuration control specified by ANSI/ANS-3.5-2009, Nuclear Power Plant Simulators for Use in Operator Training and Examination, and 10 CFR 55.46, Simulation Facilities.
This standard is endorsed by the NRC in Regulatory Guide 1.149 Revision 4. The procedure also:
Defines the formal process used to maintain, correct, and improve the simulator software and hardware configuration.
Ensures all known simulator discrepancies and differences are formally resolved.
Ensures user comments and feedback relative to the physical and functional fidelity of the simulator are formally evaluated and changes to the simulator are made when appropriate.
Ensures the simulator meets the requirements of the site accredited training programs.