ML13267A332
From kanterella
Revision as of 16:58, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML13267A332 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 09/12/2013 |
From: | Stoeva N Stevenson & Associates |
To: | American Electric Power, Indiana Michigan Power Co, Office of Nuclear Reactor Regulation |
Shared Package | |
ML13267A279 | List:
|
References | |
AEP-NRC-2013-074 SD-121023-001, Rev 1 | |
Download: ML13267A332 (50) | |
Similar Documents at Cook | |
---|---|
Category:Report
MONTHYEARML24183A0162024-07-25025 July 2024
[Table view]Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1762022-11-30030 November 2022 Commitment Change Summary October 2020 to May 2022 ML22340A1992022-11-30030 November 2022 Report of Changes, Tests, Experiments Pursuant to 10 CFR 50.59(d)(2) ML22340A2132022-11-30030 November 2022 R1900-0024-001, Revision 13, NFPA 805 Nuclear Safety Capability Assessment AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2021-44, Form OAR-1, Owner'S Activity Report2021-08-12012 August 2021 Form OAR-1, Owner'S Activity Report ML21125A5582021-04-19019 April 2021 Report 2019, Commitment Change Summary, May 2019 to October 2020 ML21125A5392021-04-19019 April 2021 Report of Changes, Tests, Experiments Pursuant to 10 CFR 50.59(d)(2), Boration System Functionality Requirement Change in Mode 4 EA-21-024, Notice of Enforcement Discretion2021-03-0404 March 2021 Notice of Enforcement Discretion for Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2021-07, Supplement to Report Per Technical Specification 5.6.6, Lnoperability of Unit 1, Post Accident Monitoring, Containment Water Level2021-01-28028 January 2021 Supplement to Report Per Technical Specification 5.6.6, Lnoperability of Unit 1, Post Accident Monitoring, Containment Water Level AEP-NRC-2020-28, CFR 72.48(d)(2) Summary Report of Completed Changes, Tests, and Experiments 1O CFR 72.48 Evaluations2020-05-0606 May 2020 CFR 72.48(d)(2) Summary Report of Completed Changes, Tests, and Experiments 1O CFR 72.48 Evaluations AEP-NRC-2020-23, Request for Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2020-04-30030 April 2020 Request for Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML20108E9992020-03-0505 March 2020 Enclosure 7 - LTR-SCS-19-50, Revision 0, D.C. Cook Unit 1 Low Temperature Overpressure Protection System (Ltops) Analysis for 48 EFPY, Dated March 5, 2020, Attachment 2 Only (Non-Proprietary) ML20108F0002020-02-28028 February 2020 Enclosure 5 - WCAP-18455-NP, Revision 1, D.C. Cook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation, Westinghouse Electric Company, February 2020. (Non-Proprietary) ML18334A2712018-09-30030 September 2018 WCAP-18394-NP, Revision 1, Fatigue Crack Growth Evaluations of D.C. Cook, Units 1 and 2 RHR, Accumulator, and Safety Injection Lines Supporting Expanded Scope Leak-Before-Break. ML18274A0952018-09-30030 September 2018 WCAP-18394-NP, Revision 1, Fatigue Crack Growth Evaluations of D. C. Cook Units 1 and 2 RHR, Accumulator, and Safety Injection Lines Supporting Expanded Scope Leak-Before-Break, September 2018 (Non-Proprietary) AEP-NRC-2018-36, Notification of Initial Renewable Operating Permit2018-05-0909 May 2018 Notification of Initial Renewable Operating Permit AEP-NRC-2018-21, 30-Day Report of Changes to or Errors in an Evaluation Model2018-05-0404 May 2018 30-Day Report of Changes to or Errors in an Evaluation Model ML18026A8822018-02-0505 February 2018 Staff Assessment of Flooding Focused Evaluation ML18334A2692018-01-31031 January 2018 WCAP-18302-NP, Revision 0, Technical Justification for Eliminating Residual Heat Removal Line Rupture as the Structural Design Basis for D.C. Cook Units 1 and 2, Using Leak-Before-Break Methodology. ML18334A2682018-01-31031 January 2018 WCAP-18295-NP, Revision 0, Technical Justification for Eliminating Accumulator Line Rupture as the Structural Design Basis for D.C. Cook Units 1 and 2, Using Leak-Before-Break Methodology (Non-Proprietary) ML18334A2702018-01-31031 January 2018 WCAP-18309-NP, Revision 0, Technical Justification for Eliminating Safety Injection Line Rupture as the Structural Design Basis for D.C. Cook, Units 1 and 2, Using Leak-Before-Break Methodology. ML17151A9672017-06-14014 June 2017 Flood Hazard Mitigation Strategies Assessment ML16313A1172016-10-10010 October 2016 1BTl1V001-RPT-01, Donald C. Cook Focused Scope Peer Review - Pre-Initiator Human Reliability Analysis. ML16127A3352016-05-0606 May 2016 Reactor Oversight Process Task Force FAQ Log-April 13, 2016 ML16113A1982016-04-20020 April 2016 Precursor Screening Analysis- Reject ML16169A1182016-03-31031 March 2016 RWA-1313-015, Rev. 1, AST Radiological Analysis Technical Report. ML15308A0932015-10-15015 October 2015 Pressurized Water Reactor Owners Group (Pwrog), 15066-NP, Revision 1, Responses to Follow-Up NRC RAI 2 on the D.C. Cook, Units 1 and 2, Reactor Internals Aging Management Program. AEP-NRC-2015-83, Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-10-0101 October 2015 Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML15233A0242015-08-19019 August 2015 Transmittal of Annual Report of Loss-of-Coolant Accident Evaluation Model Changes ML14253A3172014-09-0404 September 2014 Enclosure 2: I&M CAP Document AR 2010-1804-10, Root Cause Evaluation Attachment, Rx Vessel Core Support Lug Bolting Anomalies ML14147A3292014-06-18018 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14181A5382014-06-0505 June 2014 Enclosure 5 to AEP-NRC-2014-42, Attachment #2 (NP-Attachment) of Westinghouse Letter, LTR-PL-14-22, Westinghouse Responses to NRC, Request for Additional Information on the Application for Amendment to Restore.. ML14073A7592014-03-31031 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14092A3302014-03-17017 March 2014 Document No. 13Q3208-RPT-003, Revion 1, Seismic Hazard and Screening Report for the Cook Nuclear Plant (Cnp), Enclosure 2 to AEP-NRC-2014-25 AEP-NRC-2014-15, 30 Day Report of Changes to or Errors in an Evaluation Model2014-02-27027 February 2014 30 Day Report of Changes to or Errors in an Evaluation Model ML13337A3252014-01-24024 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) AEP-NRC-2014-08, SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-322 Through Page D-4042014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-322 Through Page D-404 ML14035A3642014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-1 Through Page D-91 ML14035A3682014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-241 Through Page D-321 ML14035A3672014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-170 Through Page D-240 ML14035A3662014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-92 Through Page D-169 ML14035A3522014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Cover Through Page B-312 ML14035A3532014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-1 Through Page C-114 ML14035A3552014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-405 Through End ML14035A3562014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-115 Through Page C-231 ML14035A3572014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-232 Through Page C-353 2024-07-25 Category:Technical MONTHYEARAEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022
[Table view]Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring ML22340A2132022-11-30030 November 2022 R1900-0024-001, Revision 13, NFPA 805 Nuclear Safety Capability Assessment ML22340A1992022-11-30030 November 2022 Report of Changes, Tests, Experiments Pursuant to 10 CFR 50.59(d)(2) ML22340A1762022-11-30030 November 2022 Commitment Change Summary October 2020 to May 2022 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2021-07, Supplement to Report Per Technical Specification 5.6.6, Lnoperability of Unit 1, Post Accident Monitoring, Containment Water Level2021-01-28028 January 2021 Supplement to Report Per Technical Specification 5.6.6, Lnoperability of Unit 1, Post Accident Monitoring, Containment Water Level AEP-NRC-2020-23, Request for Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2020-04-30030 April 2020 Request for Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML20108E9992020-03-0505 March 2020 Enclosure 7 - LTR-SCS-19-50, Revision 0, D.C. Cook Unit 1 Low Temperature Overpressure Protection System (Ltops) Analysis for 48 EFPY, Dated March 5, 2020, Attachment 2 Only (Non-Proprietary) ML20108F0002020-02-28028 February 2020 Enclosure 5 - WCAP-18455-NP, Revision 1, D.C. Cook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation, Westinghouse Electric Company, February 2020. (Non-Proprietary) ML18334A2712018-09-30030 September 2018 WCAP-18394-NP, Revision 1, Fatigue Crack Growth Evaluations of D.C. Cook, Units 1 and 2 RHR, Accumulator, and Safety Injection Lines Supporting Expanded Scope Leak-Before-Break. ML18274A0952018-09-30030 September 2018 WCAP-18394-NP, Revision 1, Fatigue Crack Growth Evaluations of D. C. Cook Units 1 and 2 RHR, Accumulator, and Safety Injection Lines Supporting Expanded Scope Leak-Before-Break, September 2018 (Non-Proprietary) ML18334A2692018-01-31031 January 2018 WCAP-18302-NP, Revision 0, Technical Justification for Eliminating Residual Heat Removal Line Rupture as the Structural Design Basis for D.C. Cook Units 1 and 2, Using Leak-Before-Break Methodology. ML18334A2682018-01-31031 January 2018 WCAP-18295-NP, Revision 0, Technical Justification for Eliminating Accumulator Line Rupture as the Structural Design Basis for D.C. Cook Units 1 and 2, Using Leak-Before-Break Methodology (Non-Proprietary) ML18334A2702018-01-31031 January 2018 WCAP-18309-NP, Revision 0, Technical Justification for Eliminating Safety Injection Line Rupture as the Structural Design Basis for D.C. Cook, Units 1 and 2, Using Leak-Before-Break Methodology. ML16313A1172016-10-10010 October 2016 1BTl1V001-RPT-01, Donald C. Cook Focused Scope Peer Review - Pre-Initiator Human Reliability Analysis. ML16169A1182016-03-31031 March 2016 RWA-1313-015, Rev. 1, AST Radiological Analysis Technical Report. ML15308A0932015-10-15015 October 2015 Pressurized Water Reactor Owners Group (Pwrog), 15066-NP, Revision 1, Responses to Follow-Up NRC RAI 2 on the D.C. Cook, Units 1 and 2, Reactor Internals Aging Management Program. ML14253A3172014-09-0404 September 2014 Enclosure 2: I&M CAP Document AR 2010-1804-10, Root Cause Evaluation Attachment, Rx Vessel Core Support Lug Bolting Anomalies ML14147A3292014-06-18018 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14092A3302014-03-17017 March 2014 Document No. 13Q3208-RPT-003, Revion 1, Seismic Hazard and Screening Report for the Cook Nuclear Plant (Cnp), Enclosure 2 to AEP-NRC-2014-25 ML13337A3252014-01-24024 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14035A3642014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-1 Through Page D-91 AEP-NRC-2014-08, SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-322 Through Page D-4042014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-322 Through Page D-404 ML14035A3682014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-241 Through Page D-321 ML14035A3672014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-170 Through Page D-240 ML14035A3522014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Cover Through Page B-312 ML14035A3532014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-1 Through Page C-114 ML14035A3662014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-92 Through Page D-169 ML14035A3632014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-845 Through Page C-962 ML14035A3622014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-723 Through Page C-844 ML14035A3612014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-584 Through Page C-722 ML14035A3552014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-405 Through End ML14035A3602014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-469 Through Page C-583 ML14035A3592014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-354 Through Page C-468 ML14035A3572014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-232 Through Page C-353 ML14035A3562014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-115 Through Page C-231 ML13357A3252014-01-10010 January 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Donald C. Cook Nuclear Plant, Units 1 and 2, TAC Nos.: MF0766 and MF0767 ML14253A3182013-12-31031 December 2013 Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 1 of 3 AEP-NRC-2014-59, Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 3 of 32013-12-31031 December 2013 Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 3 of 3 ML14253A3192013-12-31031 December 2013 Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 2 of 3 ML13267A3272013-09-12012 September 2013 SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-1 Through Page D-48 AEP-NRC-2013-07, SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-405 Through End2013-09-12012 September 2013 SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-405 Through End ML13267A3352013-09-12012 September 2013 SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-339 Through Page D-404 ML13267A3342013-09-12012 September 2013 SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-271 Through Page D-338 ML13267A3322013-09-12012 September 2013 SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-221 Through Page D-270 ML13267A3292013-09-12012 September 2013 SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-115 Through Page D-160 ML13267A3282013-09-12012 September 2013 SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-49 Through Page D-114 ML13267A3252013-09-12012 September 2013 SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-801 Through Page C-884 ML13267A3162013-09-12012 September 2013 SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-312 ML13267A3172013-09-12012 September 2013 SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-1 Through Page C-98 2022-12-15 |
Retrieved from "https://kanterella.com/w/index.php?title=ML13267A332&oldid=416167"