ML13339A736
From kanterella
Revision as of 15:53, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML13339A736 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 01/29/2014 |
From: | Bowen J S NRC/NRR/DPR/MSD/MSPB |
To: | Koehl D L South Texas |
Lent S M, NRR/DPR, 415-1365 | |
Shared Package | |
ML13339A727 | List: |
References | |
EA-12-049, Job Code J4672, NRC-HQ-13-C-03-0039, TAC MF0825, TAC MF0826 | |
Download: ML13339A736 (90) | |
Similar Documents at South Texas | |
---|---|
Category:Audit Report
MONTHYEARML21236A3082021-09-10010 September 2021
[Table view]Regulatory Audit Summary Regarding License Amendment Request to Revise Moderator Temperature Coefficient Surveillance Requirements ML20142A2792020-05-27027 May 2020 Regulatory Audit Summary Regarding Exigent License Amendment Request to Revise the Safety Injection Accumulators Pressures ML17107A3192017-05-16016 May 2017 Aluminum Bronze Selective Leaching Aging Management Program Audit Report Regarding the South Texas Project, Units 1 and 2, License Renewal Application (CAC Nos. ME4936 and ME4937) ML16218A2562016-08-30030 August 2016 Aluminum Bronze Selective Leaching Aging Management Program and PWR Reactor Internals Program Inspection Plan Audit Report Regarding the South Texas Project, Units 1 and 2 ML16214A2912016-08-26026 August 2016 Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, MD, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16141B0812016-05-31031 May 2016 Audit Summary, Risk Audit on April 12-13, 2016, at Alumni Center at the University of Texas, Austin, Tx; Pilot Generic Safety Issue 191 Submittal and Exemption Request, and Draft Request for Additional Information ML16127A4002016-05-11011 May 2016 Audit Summary, Thermal-Hydraulic Review on February 23-25, 2016 at Texas A&M University; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue 191 (CAC MF2400-MF2409) ML16103A3442016-04-26026 April 2016 Summary of February 24-26, 2016 Audit, Debris Transport Review at Alion Science and Technology Corporation, Albuquerque, Nm; Pilot Submittal and Exemption Request, Risk-Informed Approach to Resolve GSI 191 ML16095A0102016-04-13013 April 2016 Summary of November 17-19, 2015 Thermal-Hydraulic Review at Texas A&M University; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC MF2400-MF2409) ML16096A0652016-04-13013 April 2016 Summary of February 4 and 16, 2016, Regulatory Audit at Westinghouse in Rockville, MD, Boric Acid Precipitation, Exemption and License Amendment Request, Risk-Informed Approach to Resolve Generic Safety Issue 191 ML16029A2722016-03-15015 March 2016 12/7-8/2015 Audit Summary, Audit Conducted to Support License Amendment Request to Revise TS 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) ML15175A0242015-07-29029 July 2015 Audit Summary for May 12-14, 2015 Audit of Roverd Methodology Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (TAC Nos. MF2400 Through MF2409) ML15183A0072015-07-15015 July 2015 Audit Summary, 3/31 to 4/2/15 Audit of Systems, Structures and Equipment at STP Facility; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 ML15131A1452015-06-0404 June 2015 Audit Report for the 2015 Supplemental Audit STP License Renewal ML15111A4652015-05-0606 May 2015 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML15183A0092015-04-0202 April 2015 Photos, Audit Summary, 3/31 to 4/2/15 Audit of Systems, Structures and Equipment at STP Facility; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 ML14321A6772015-01-15015 January 2015 Audit Report for 9/16-17/2014 Audit at University of New Mexico Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (TAC MF2400 Through and MF2409) ML13339A7362014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML12165A2392012-06-15015 June 2012 Report Regarding the Follow-up Audit of the Selective Leaching of Aluminum Bronze Aging Management Program for the South Texas Project, Units 1 and 2, License Renewal Application (TAC ME4936 and ME4937) ML11224A2652011-09-22022 September 2011 Aging Management Programs Audit Report Regarding the South Texas Project, Units 1 and 2, Station License Renewal Application (TAC Nos. ME4936 and ME4937) ML1122106582011-09-0707 September 2011 Audit of the Licensee Regulatory Commitment Management Program, Audit Performed July 19-20, 2011 ML11230A0032011-09-0606 September 2011 Scoping and Screening Audit Report Regarding the South Texas Project, Units 1 and 2 (TAC Nos. ME4936 and ME4937) ML11173A3042011-07-18018 July 2011 Audit Report Regarding South Texas Project License Renewal Application - Cultural Resource ML11145A0642011-06-21021 June 2011 Plan for the Environmental Related Regulatory Audit Regarding the South Texas Project, Units 1 and 2, License Renewal Application Review (TAC Nos. ME4938 and ME4939) ML0834501622008-12-24024 December 2008 Audit Report of Licensee Regulatory Commitment Management Program for Audit Performed August 19, 2008 ML0721101192007-08-16016 August 2007 Us NRC Audit Report for South Texas Project Combined License Application Review ML0426702502004-09-22022 September 2004 Audit of the Licensees Management of Regulatory Commitments NOC-AE-04001712, Appendix a Cameco Corporation 2003 Consolidated Audited Financial Statements2004-02-27027 February 2004 Appendix a Cameco Corporation 2003 Consolidated Audited Financial Statements 2021-09-10 Category:Letter MONTHYEARML24029A2752024-01-29029 January 2024
[Table view]Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23360A1692023-12-26026 December 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the South Texas Project Medical Services Drill Evaluated on August 31, 2023 NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23324A0102023-11-16016 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23298A0002023-11-0101 November 2023 the Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23303A0782023-10-30030 October 2023 Submittal of Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) ML23317A1262023-10-12012 October 2023 South. Texas Project Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 26 ML23279A1382023-10-0505 October 2023 Responses to Requests for Additional Information Related to Application for Order Approving Indirect Transfer of Control of Licenses ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information ML23270B2592023-09-27027 September 2023 Update Foreign Ownership, Control, or Influence ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23236A6042023-08-24024 August 2023 Annual Dose Report for 2022 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23229A5892023-08-17017 August 2023 Voluntary Response to Regulatory Issue Summary (RIS) 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23228A2102023-08-15015 August 2023 Closure of Investigation (OI 4-22-19) ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23222A2792023-08-0909 August 2023 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20230022023-07-28028 July 2023 Integrated Inspection Report 05000498/2023002 and 05000499/2023002 ML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML23188A1612023-07-14014 July 2023 the Associated ISFSI - Notice of Consideration of Approval of Indirect Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing (EPID L-2023-LLM-0004) - Letter ML23193A9932023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23180A2822023-06-29029 June 2023 Operator Licensing Examination Schedule ML23177A2522023-06-26026 June 2023 Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary ML23166B0802023-06-14014 June 2023 Update Foreign Ownership, Control, or Influence (FOCI) ML23163A1762023-06-12012 June 2023 Application for Order Approving Indirect Transfer of Control of Licenses 2024-01-29 Category:Report MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023
[Table view]Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) ML21266A4262021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report ML21182A2412021-06-30030 June 2021 Commitment Change Summary Report ML17019A0032017-07-11011 July 2017 Attachment 2 to Safety Evaluation - In-Vessel Thermal-Hydraulic Analysis, Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 NOC-AE-17003468, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2017-05-10010 May 2017 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML16302A0152016-10-20020 October 2016 South Texas Project, Units 1 & 2 - Supplement 3 to Revised Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond to Generic Letter (GL) 2004-02 NOC-AE-16003345, LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2016-03-31031 March 2016 LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. NOC-AE-15003249, Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report2015-06-0909 June 2015 Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report ML14357A1362015-01-22022 January 2015 Review of Analysis of Capsule Withdrawal Schedule from Reactor Vessel Radiation Surveillance Program NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application2014-10-30030 October 2014 Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application ML14344A5462014-10-30030 October 2014 Attachment 1 to NOC-AE-14003190 - Alion REP-STP-8998-13, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application Executive Summary NOC-AE-14003178, Update Foreign Ownership, Control, or Influence (FOCI)2014-09-17017 September 2014 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-14003161, Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2.2014-08-31031 August 2014 Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2. ML14260A4382014-08-31031 August 2014 Engineering Report ER-1059, Rev. 1, Bounding Uncertainty Analysis for Thermal Power Determination at South Texas Project Units 1 & 2 Using LEFM System. NOC-AE-14003101, Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application2014-06-25025 June 2014 Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application ML14168A2682014-05-0101 May 2014 Texas Pollutant Discharge Elimination System Major Amendment with Renewal Application for a Major Facility Tpdes Permit No. WQ000190800 NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 12014-04-18018 April 2014 University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1 ML14087A0782014-04-15015 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0178 & MF0179) NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 32014-03-11011 March 2014 Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 NOC-AE-13003067, Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible2014-02-27027 February 2014 Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 ML14072A0872014-02-24024 February 2014 CHLE-016, Calculated Material Release to Estimate Chemical Effects, Revision 3 ML14072A0862014-02-24024 February 2014 CHLE-015, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal, Revision 4 ML14072A0802014-02-24024 February 2014 CHLE-006, STP Material Calculations, Revision 2 ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 ML14072A0882014-02-22022 February 2014 CHLE-018, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions, Revision 3 ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 ML14072A0772014-02-18018 February 2014 CHLE-005, Determination of the Initial Pool Chemistry for the Chle Test, Revision 2 ML14149A4352014-02-14014 February 2014 Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 ML14072A0812014-02-13013 February 2014 CHLE-007, Debris Bed Requirements & Preparation Procedures, Revision 4 ML13339A7362014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13354B8332014-01-23023 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for South Texas Project, Units 1 and 2, TAC Nos.: MF0825 and MF0826 NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. NOC-AE-13003019, Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 20132013-07-18018 July 2013 Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 2013 ML13175A2122013-06-18018 June 2013 Project, Units 1 and 2, Enclosure 4-1 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 1 Project Summary NOC-AE-13002986, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End2013-06-0606 June 2013 Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End 2023-08-31 Category:Technical MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023
[Table view]Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) ML21266A4262021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) ML16302A0152016-10-20020 October 2016 South Texas Project, Units 1 & 2 - Supplement 3 to Revised Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond to Generic Letter (GL) 2004-02 NOC-AE-16003345, LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2016-03-31031 March 2016 LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. NOC-AE-14003161, Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2.2014-08-31031 August 2014 Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2. ML14260A4382014-08-31031 August 2014 Engineering Report ER-1059, Rev. 1, Bounding Uncertainty Analysis for Thermal Power Determination at South Texas Project Units 1 & 2 Using LEFM System. NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 32014-03-11011 March 2014 Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 ML14072A0872014-02-24024 February 2014 CHLE-016, Calculated Material Release to Estimate Chemical Effects, Revision 3 ML14072A0862014-02-24024 February 2014 CHLE-015, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal, Revision 4 ML14072A0802014-02-24024 February 2014 CHLE-006, STP Material Calculations, Revision 2 ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 ML14072A0882014-02-22022 February 2014 CHLE-018, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions, Revision 3 ML14072A0772014-02-18018 February 2014 CHLE-005, Determination of the Initial Pool Chemistry for the Chle Test, Revision 2 ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 ML14149A4352014-02-14014 February 2014 Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 ML14072A0812014-02-13013 February 2014 CHLE-007, Debris Bed Requirements & Preparation Procedures, Revision 4 ML13339A7362014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13354B8332014-01-23023 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for South Texas Project, Units 1 and 2, TAC Nos.: MF0825 and MF0826 NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. ML13175A2122013-06-18018 June 2013 Project, Units 1 and 2, Enclosure 4-1 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 1 Project Summary ML13175A2402013-06-0606 June 2013 Project, Units 1 and 2, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 1 of 260 Through Page 160 of 260 NOC-AE-13002986, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End2013-06-0606 June 2013 Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End NOC-AE-13002975, Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.2-462013-03-31031 March 2013 Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.2-46 ML13079A8082013-03-11011 March 2013 Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.3-1 Through End ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects. ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 ML12335A1842012-11-26026 November 2012 Licensee Documents for December 12, 2012 Public Meeting ML12335A1902012-11-26026 November 2012 Licensee Documents for December 12, 2012 Public Meeting ML13025A1382012-10-31031 October 2012 STP GSI-191 Bypass Sensitivity Report - Water Conductivity Added ML12243A4742012-08-30030 August 2012 Email - Risk-Informed Approach to GSI-191, STP Cfd Data Analysis Report - Bypass Test Protocol ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations. NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. ML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results. ML1206100682012-02-28028 February 2012 Southtexas Project, Units 1 and 2 - Test Plan for STP High Temperature Vertical Loops Testing ML1205408162012-02-23023 February 2012 Experimental Setup for Chle Test Equipment ML1205406672012-02-22022 February 2012 Casa Grande Summary ML1205407272012-02-0909 February 2012 Actions Taken to Resolved Pirt Items 2023-08-17 |
Retrieved from "https://kanterella.com/w/index.php?title=ML13339A736&oldid=414079"