L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Letter Sequence Request | |
---|---|
EPID:L-2019-LRL-0004, Post-Shutdown Decommissioning Activities Report (Approved, Closed) | |
MONTHYEARDCL-19-091, Letter to Inform the NRC of the Submittal Date for the Post-Shutdown Decommissioning Activities Report, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan2019-10-31031 October 2019
[Table View]Letter to Inform the NRC of the Submittal Date for the Post-Shutdown Decommissioning Activities Report, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan Project stage: Request DCL-19-077, Post-Shutdown Decommissioning Activities Report2019-12-0404 December 2019 Post-Shutdown Decommissioning Activities Report Project stage: Request ML20041E6012020-02-10010 February 2020 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Request for Additional Information for Post -Shutdown Decommissioning Activities Report (PSDAR) Project stage: RAI ML20034E1482020-02-13013 February 2020 Letter, Notice of Receipt, Public Meeting and Request for Comment on Post-Shutdown Decommissioning Activities Report Project stage: Meeting ML20055E0632020-02-18018 February 2020 Pacific Gas and Electric Company - Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Federal Register Notice Project stage: Other ML20072L8482020-03-12012 March 2020 FRN Notification of the Availability of the Post-Shutdown Decommissioning Activities Report in the Federal Register (EPID L-2019-LRL-0004)-Cancellation of Public Meeting Project stage: Meeting ML20072M0362020-03-12012 March 2020 Letter Notification of the Availability of the Post-Shutdown Decommissioning Activities Report in the Federal Register Project stage: Other DCL-21-073, Notification of Changes to Post-Shutdown Decommissioning Activities Report, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan for Diablo Canyon Power Plant, Units 1 and 22021-10-19019 October 2021 Notification of Changes to Post-Shutdown Decommissioning Activities Report, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Request L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation Project stage: Request DCL-22-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22022-03-30030 March 2022 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Request ML22053A2612022-06-17017 June 2022 FRN - Post-Shutdown Decommissioning Activities Report (PSDAR) Public Meeting (EPIDs L-2019-LRL-0004, L-2019-LRL-0005, and L-2019-LRL-0006) Project stage: Meeting ML22053A2412022-06-17017 June 2022 Letter - Post-Shutdown Decommissioning Activities Report (PSDAR) Public Meeting (EPIDs L-2019-LRL-0004, L-2019-LRL-0005, and L-2019-LRL-0006) Project stage: Meeting PMNS20220679, Post-Shutdown Decommissioning Activities Report Public Meeting2022-06-27027 June 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Project stage: Meeting ML22238A3462022-07-21021 July 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Transcript, Pages 1-132, July 21, 2022 Project stage: Meeting DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 Project stage: Request DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 Project stage: Request DCL-22-039, Irradiated Fuel Management Plan, Revision 12022-10-12012 October 2022 Irradiated Fuel Management Plan, Revision 1 Project stage: Request DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Request ML23122A2362023-06-20020 June 2023 Review of the Post-Shutdown Decommissioning Activities Report Project stage: Approval 2022-10-12 |
ML22068A189 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 03/09/2022 |
From: | Zawalick M Pacific Gas & Electric Co |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
References | |
DIL-22-003 | |
Download: ML22068A189 (330) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Letter type:L
MONTHYEARL-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024
[Table view]Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) L-23-011, Independent Spent Fuel Storage Installation Biennial Submittal of Updated Final Safety Analysis Report2023-12-14014 December 2023 Independent Spent Fuel Storage Installation Biennial Submittal of Updated Final Safety Analysis Report L-23-008, Independent Spent Fuel Storage Installation - Responses to NRC Request for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid Nos. 001028/L-2022-RNW-0007)2023-09-21021 September 2023 Independent Spent Fuel Storage Installation - Responses to NRC Request for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid Nos. 001028/L-2022-RNW-0007) L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007)2023-08-10010 August 2023 Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007) L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation L-22-005, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report for 20212022-03-0101 March 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report for 2021 L-22-004, Independent Spent Fuel Storage Installation, Biennial Submittal of Changes to Diablo Canyon Independent Spent Fuel Storage Installation Technical Specification Bases2022-02-16016 February 2022 Independent Spent Fuel Storage Installation, Biennial Submittal of Changes to Diablo Canyon Independent Spent Fuel Storage Installation Technical Specification Bases L-21-010, Independent Spent Fuel Storage Installation, Decommissioning Funding Plan2021-12-14014 December 2021 Independent Spent Fuel Storage Installation, Decommissioning Funding Plan L-21-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20202021-03-0101 March 2021 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2020 L-20-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20192020-03-0202 March 2020 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2019 L-18-013, Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Implementing Procedure Update2018-10-0404 October 2018 Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Implementing Procedure Update L-17-014, Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update2017-12-21021 December 2017 Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update L-17-008, ISFSI - Emergency Plan Implementing Procedure Update2017-09-0707 September 2017 ISFSI - Emergency Plan Implementing Procedure Update L-13-009, Response to NRC Letter Dated May 20. 2013, Diablo Canyon Power Plant Independent Spent Fuel Installation Storage Inspection Report 05000275-13-008, 05000323-13-008, 07200026-13-001 of Notice of Violation2013-06-17017 June 2013 Response to NRC Letter Dated May 20. 2013, Diablo Canyon Power Plant Independent Spent Fuel Installation Storage Inspection Report 05000275-13-008, 05000323-13-008, 07200026-13-001 of Notice of Violation L-2011-512, Diablo Canyon, Submittal of 2010 Annual Discharge Monitoring Report2011-02-28028 February 2011 Diablo Canyon, Submittal of 2010 Annual Discharge Monitoring Report L-09-009, Response to NRC Request for Information Pertaining to Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) License Amendment Request 08-0012009-11-23023 November 2009 Response to NRC Request for Information Pertaining to Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) License Amendment Request 08-001 L-2009-517, Diablo Canyon - Receiving Water Monitoring Program 2008 Annual Report2009-04-30030 April 2009 Diablo Canyon - Receiving Water Monitoring Program 2008 Annual Report L-09-001, Independent Spent Fuel Storage Installation, Notification in Accordance with 10 CFR 72.80, Other Records and Reports, Prior to First Storage of Spent Fuel2009-01-30030 January 2009 Independent Spent Fuel Storage Installation, Notification in Accordance with 10 CFR 72.80, Other Records and Reports, Prior to First Storage of Spent Fuel L-03-008, Additional Questions Related to Supplemental Blasts & Explosions Responses to Additional NRC Questions for Diablo Canyon Independent Spent Fuel Storage Installation Application2003-06-13013 June 2003 Additional Questions Related to Supplemental Blasts & Explosions Responses to Additional NRC Questions for Diablo Canyon Independent Spent Fuel Storage Installation Application L-03-007, Supplemental Slope Stability Design Mitigation Features Information to Additional NRC Questions for Diablo Canyon Independent Spent Fuel Storage Installation Application2003-05-0606 May 2003 Supplemental Slope Stability Design Mitigation Features Information to Additional NRC Questions for Diablo Canyon Independent Spent Fuel Storage Installation Application L-02-010, Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1 (TAC L23399)2002-10-15015 October 2002 Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1 (TAC L23399) L-02-008, Independent Spent Fuel Storage Installation Supplemental General & Financial Information2002-06-0707 June 2002 Independent Spent Fuel Storage Installation Supplemental General & Financial Information L-02-006, Part 1 of 2, Diablo Canyon Independent Spent Fuel Storage Installation - Submittal of Diablo Independent Spent Fuel Storage Installation Safety Analysis Report Reference Documents2002-05-23023 May 2002 Part 1 of 2, Diablo Canyon Independent Spent Fuel Storage Installation - Submittal of Diablo Independent Spent Fuel Storage Installation Safety Analysis Report Reference Documents L-2002-528, (DCPP) Submittal - Receiving Water Monitoring Program 2001 Annual Report2002-04-30030 April 2002 (DCPP) Submittal - Receiving Water Monitoring Program 2001 Annual Report L-2002-526, Pacific Gas and Electric Company First Quarter 2002 Report on Discharge Monitoring at Diablo Canyon Power Plant2002-04-20020 April 2002 Pacific Gas and Electric Company First Quarter 2002 Report on Discharge Monitoring at Diablo Canyon Power Plant L-2002-514, 2001 Annual Report on Discharge Monitoring2002-02-28028 February 2002 2001 Annual Report on Discharge Monitoring L-2002-504, Third Quarter 2001 Report on Discharge Monitoring at Diablo Canyon Power Plant2002-01-17017 January 2002 Third Quarter 2001 Report on Discharge Monitoring at Diablo Canyon Power Plant 2024-04-30 Category:License-Application for (Amend/Renewal/New) for DKT 30 MONTHYEARDCL-23-118, License Renewal Application2023-11-0707 November 2023
[Table view]License Renewal Application DCL-22-011, License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-03-10010 March 2022 License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation DCL-15-107, License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits.2015-09-16016 September 2015 License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits. 2023-11-07 Category:40 MONTHYEARDCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024
[Table view]Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 DCL-22-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22022-03-30030 March 2022 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-22-011, License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-03-10010 March 2022 License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation L-21-010, Independent Spent Fuel Storage Installation, Decommissioning Funding Plan2021-12-14014 December 2021 Independent Spent Fuel Storage Installation, Decommissioning Funding Plan DCL-21-026, Decommissioning Funding Report2021-03-31031 March 2021 Decommissioning Funding Report DCL-20-014, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 & 22020-03-30030 March 2020 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 & 2 ML19345D3452019-12-0404 December 2019 Site-Specific Decommissioning Cost Estimate DCL-19-055, Revised Enclosure for the Decommissioning Funding Report2019-07-0101 July 2019 Revised Enclosure for the Decommissioning Funding Report DCL-17-022, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22017-03-31031 March 2017 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-15-107, License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits.2015-09-16016 September 2015 License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits. DCL-15-044, Decommissioning Funding Report for Diablo Canyon, Units 1 and 22015-03-31031 March 2015 Decommissioning Funding Report for Diablo Canyon, Units 1 and 2 DCL-13-033, Decommissioning Funding Report2013-04-0101 April 2013 Decommissioning Funding Report DCL-11-039, Diablo Canyon Power Plant, Units 1 & 2, Decommissioning Funding Report for 20102011-03-31031 March 2011 Diablo Canyon Power Plant, Units 1 & 2, Decommissioning Funding Report for 2010 DCL-11-039, Submittal of Decommissioning Funding Report2011-03-31031 March 2011 Submittal of Decommissioning Funding Report ML1109006722011-03-31031 March 2011 Decommissioning Funding Report for 2010 DCL-09-021, Submittal of Decommissioning Funding Report2009-03-31031 March 2009 Submittal of Decommissioning Funding Report DCL-07-028, Supplemental to Decommissioning Funding Report2007-06-13013 June 2007 Supplemental to Decommissioning Funding Report DCL-05-026, Decommissioning Funding Report2005-03-31031 March 2005 Decommissioning Funding Report DCL-03-035, Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 4 - 72003-03-27027 March 2003 Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 4 - 7 ML0309902892003-03-27027 March 2003 Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 1 - 4, Appendix C ML0509605442002-02-12012 February 2002 P01-1421-003, Rev. 0, Decommissioning Cost Study for Diablo Canyon Power Plant Units 1 and 2. 2024-08-28 Category:70 MONTHYEARDCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024
[Table view]Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 DCL-22-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22022-03-30030 March 2022 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-22-011, License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-03-10010 March 2022 License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation L-21-010, Independent Spent Fuel Storage Installation, Decommissioning Funding Plan2021-12-14014 December 2021 Independent Spent Fuel Storage Installation, Decommissioning Funding Plan DCL-21-026, Decommissioning Funding Report2021-03-31031 March 2021 Decommissioning Funding Report DCL-20-014, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 & 22020-03-30030 March 2020 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 & 2 ML19345D3452019-12-0404 December 2019 Site-Specific Decommissioning Cost Estimate DCL-19-055, Revised Enclosure for the Decommissioning Funding Report2019-07-0101 July 2019 Revised Enclosure for the Decommissioning Funding Report DCL-17-022, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22017-03-31031 March 2017 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-15-107, License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits.2015-09-16016 September 2015 License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits. DCL-15-044, Decommissioning Funding Report for Diablo Canyon, Units 1 and 22015-03-31031 March 2015 Decommissioning Funding Report for Diablo Canyon, Units 1 and 2 DCL-13-033, Decommissioning Funding Report2013-04-0101 April 2013 Decommissioning Funding Report DCL-11-039, Diablo Canyon Power Plant, Units 1 & 2, Decommissioning Funding Report for 20102011-03-31031 March 2011 Diablo Canyon Power Plant, Units 1 & 2, Decommissioning Funding Report for 2010 DCL-11-039, Submittal of Decommissioning Funding Report2011-03-31031 March 2011 Submittal of Decommissioning Funding Report ML1109006722011-03-31031 March 2011 Decommissioning Funding Report for 2010 DCL-09-021, Submittal of Decommissioning Funding Report2009-03-31031 March 2009 Submittal of Decommissioning Funding Report DCL-07-028, Supplemental to Decommissioning Funding Report2007-06-13013 June 2007 Supplemental to Decommissioning Funding Report DCL-05-026, Decommissioning Funding Report2005-03-31031 March 2005 Decommissioning Funding Report DCL-03-035, Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 4 - 72003-03-27027 March 2003 Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 4 - 7 ML0309902892003-03-27027 March 2003 Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 1 - 4, Appendix C ML0509605442002-02-12012 February 2002 P01-1421-003, Rev. 0, Decommissioning Cost Study for Diablo Canyon Power Plant Units 1 and 2. 2024-08-28 Category:Report MONTHYEARML24305A1872024-10-31031 October 2024
[Table view]OEDO-24-00083 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petition Supplement 10-30-2024 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 OIG-24-A-01, Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 20242023-11-0303 November 2023 OIG-24-A-01 Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 ML23130A0052023-06-27027 June 2023 Report to Congress Regarding Diablo Canyon ML22108A2892022-05-0303 May 2022 Enclosure - Response to Representative Carbajal Regarding OIG Report on Diablo ML22108A1662022-05-0303 May 2022 Enclosure 1 - Assessment Event Inquiry Into the Nuclear Regulatory Commission Oversight of the Auxiliary Feedwater System at Diablo Canyon Nuclear ML24289A0962022-03-31031 March 2022 Definition of a Probable Maximum Tsunami at the Diablo Canyon Nuclear Power Plant Site: a Historical Perspective L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation DCL-21-071, Federally Listed Species Affects Determination Memorandum2021-10-14014 October 2021 Federally Listed Species Affects Determination Memorandum ML21188A0362021-07-0707 July 2021 Draft PG&E Letter DCL-21-046 - Diablo Canyon Unit 1: Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21076A6142021-03-17017 March 2021 NRC Examination Report 05000275/2021301 and 05000323/2021301 ML20353A3972020-12-18018 December 2020 NRC Response to Public Comment Regarding Spent Fuel Canister Drop from 2019 Regcon DCL-20-102, Nuclear Material Transaction Report for New Fuel2020-12-0909 December 2020 Nuclear Material Transaction Report for New Fuel ML20335A0132020-11-30030 November 2020 NRC Response to Public Watchdogs November 2 ML20328A3012020-11-23023 November 2020 NERC Reliability Standards for the Bulk Electric System of North America Updated July 20, 2020 (Cgnp Public Comments on Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Pre-submittal Meeting of 11/24/2020) ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 ML18254A0402019-01-22022 January 2019 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 IR 05000275/20180052018-08-31031 August 2018 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005) DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17024A2072017-12-18018 December 2017 Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint DCL-16-117, Reactor Coolant System Pressure and Temperature Limits Report, Revision 152016-11-10010 November 2016 Reactor Coolant System Pressure and Temperature Limits Report, Revision 15 ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16215A1092016-08-0202 August 2016 OEDO-16-00436 - Supplemental Information from Mr. Lochbaum 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9 at Diablo Canyon Nuclear Power Plant ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16019A2242016-02-0101 February 2016 Record of Review, Dispositions to Diablo Canyon Nuclear Plant, Units 1 and 2, Internal Events, Internal Flooding, Seismic, and Fire PRA Facts and Observations ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List ML16048A2072015-12-15015 December 2015 Once Through Cooling 2024-06-14 Category:Technical MONTHYEARML24305A1872024-10-31031 October 2024
[Table view]OEDO-24-00083 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petition Supplement 10-30-2024 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage OIG-24-A-01, Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 20242023-11-0303 November 2023 OIG-24-A-01 Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 ML24289A0962022-03-31031 March 2022 Definition of a Probable Maximum Tsunami at the Diablo Canyon Nuclear Power Plant Site: a Historical Perspective L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation ML21076A6142021-03-17017 March 2021 NRC Examination Report 05000275/2021301 and 05000323/2021301 ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16004A3542015-12-11011 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Terms Summary of Dose Analysis & Results, Revision 1 DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report2015-11-0505 November 2015 ISFSI - Submits 2014 Annual Commitment Change Summary Report DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 82015-05-15015 May 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML15176A5282015-05-15015 May 2015 License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report2014-12-12012 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report2014-12-12012 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report ML16061A4712014-12-12012 December 2014 Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report ML16061A4752014-12-12012 December 2014 Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report DCL-16-020, Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report2014-12-12012 December 2014 Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report ML16061A4602014-12-0909 December 2014 Revision 9 to 993754-1-915-NP, Safety Analysis DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis2014-12-0909 December 2014 Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report ML16061A4662014-12-0101 December 2014 Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report ML16061A4692014-12-0101 December 2014 Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report ML16061A4732014-12-0101 December 2014 Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report ML16061A4702014-09-12012 September 2014 Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report ML16061A4742014-09-12012 September 2014 Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report 2024-05-08 |