Letter Sequence Meeting |
---|
|
|
MONTHYEARDCL-19-091, Letter to Inform the NRC of the Submittal Date for the Post-Shutdown Decommissioning Activities Report, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan2019-10-31031 October 2019 Letter to Inform the NRC of the Submittal Date for the Post-Shutdown Decommissioning Activities Report, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan Project stage: Request DCL-19-077, Post-Shutdown Decommissioning Activities Report2019-12-0404 December 2019 Post-Shutdown Decommissioning Activities Report Project stage: Request ML20041E6012020-02-10010 February 2020 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Request for Additional Information for Post -Shutdown Decommissioning Activities Report (PSDAR) Project stage: RAI ML20034E1482020-02-13013 February 2020 Letter, Notice of Receipt, Public Meeting and Request for Comment on Post-Shutdown Decommissioning Activities Report Project stage: Meeting ML20055E0632020-02-18018 February 2020 Pacific Gas and Electric Company - Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Federal Register Notice Project stage: Other ML20072L8482020-03-12012 March 2020 FRN Notification of the Availability of the Post-Shutdown Decommissioning Activities Report in the Federal Register (EPID L-2019-LRL-0004)-Cancellation of Public Meeting Project stage: Meeting ML20072M0362020-03-12012 March 2020 Letter Notification of the Availability of the Post-Shutdown Decommissioning Activities Report in the Federal Register Project stage: Other DCL-21-073, Notification of Changes to Post-Shutdown Decommissioning Activities Report, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan for Diablo Canyon Power Plant, Units 1 and 22021-10-19019 October 2021 Notification of Changes to Post-Shutdown Decommissioning Activities Report, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Request DCL-22-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22022-03-30030 March 2022 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Request ML22053A2612022-06-17017 June 2022 FRN - Post-Shutdown Decommissioning Activities Report (PSDAR) Public Meeting (EPIDs L-2019-LRL-0004, L-2019-LRL-0005, and L-2019-LRL-0006) Project stage: Meeting ML22053A2412022-06-17017 June 2022 Letter - Post-Shutdown Decommissioning Activities Report (PSDAR) Public Meeting (EPIDs L-2019-LRL-0004, L-2019-LRL-0005, and L-2019-LRL-0006) Project stage: Meeting PMNS20220679, Post-Shutdown Decommissioning Activities Report Public Meeting2022-06-27027 June 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Project stage: Meeting ML22200A0722022-07-21021 July 2022 PG&E Slides for Post-Shutdown Decommissioning Activities Report Public Meeting, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan - July 21, 2022 Project stage: Request ML22200A0712022-07-21021 July 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - July 21, 2022 Project stage: Request ML22238A3462022-07-21021 July 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Transcript, Pages 1-132, July 21, 2022 Project stage: Meeting DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 Project stage: Request DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 Project stage: Request DCL-22-039, Irradiated Fuel Management Plan, Revision 12022-10-12012 October 2022 Irradiated Fuel Management Plan, Revision 1 Project stage: Request DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Request ML23122A2362023-06-20020 June 2023 Review of the Post-Shutdown Decommissioning Activities Report Project stage: Approval 2021-10-19
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24003A8892024-01-19019 January 2024 FRN - Diablo Canyon, Units 1 and 2, Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML23341A0032023-12-14014 December 2023 LRA Acceptance and Opportunity for Hearing FRN ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR ML23320A1462023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - FRN ML23293A1062023-11-16016 November 2023 LRA - Receipt and Availability - FRN ML23291A1982023-11-0808 November 2023 Withdrawal of Amendment Request Regarding Alternative Security Measures for Early Warning System (EPID: L-2022-LLA-0029) (Federal Register Notice) ML23192A0212023-07-0303 July 2023 7-3-23 Petitioners Excerpts of Record Volume 1 (9th Cir.)(Case No. 23-852) ML23192A0232023-07-0303 July 2023 7-3-23 Petitioners Excerpts of Record Volume 2 (9th Cir.)(Case No. 23-852) ML23192A0252023-07-0303 July 2023 7-3-23 Petitioners Excerpts of Record Volume 3 (9th Cir.)(Case No. 23-852) ML22265A1022023-01-0505 January 2023 FRN - Diablo Canyon ISFSI Renewal Notice of Docketing and Opp for Hearing ML22053A2612022-06-17017 June 2022 FRN - Post-Shutdown Decommissioning Activities Report (PSDAR) Public Meeting (EPIDs L-2019-LRL-0004, L-2019-LRL-0005, and L-2019-LRL-0006) ML21091A0662021-04-23023 April 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding Various Parts of 10 CFR Issued in March 2021 ML21068A3372021-04-0202 April 2021 Federal Register Notice, One-Time Exemption from Select Requirements of 10 CFR Part 55, Operators' Licenses ML20328A3022020-11-0303 November 2020 85 Fr 69620 - Federal Register Notice Dated 11/3/20 by Department of Energy Californians for Green Nuclear Power, Inc., Et Al (Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Cgnp Public Comments on Pre-submittal Meeting of 11/24/2020) ML20271A0002020-10-13013 October 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for September 2020 ML20245E3952020-09-0303 September 2020 Transmittal Letter with Notice of Issuance, License Amendment; Issuance, Opportunity to Request a Hearing, and Petition for Leave to Intervene ML20245E3122020-09-0303 September 2020 Notice of Issuance, License Amendment; Issuance, Opportunity to Request a Hearing, and Petition for Leave to Intervene ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 ML20072L8482020-03-12012 March 2020 FRN Notification of the Availability of the Post-Shutdown Decommissioning Activities Report in the Federal Register (EPID L-2019-LRL-0004)-Cancellation of Public Meeting ML20055E0632020-02-18018 February 2020 Pacific Gas and Electric Company - Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Federal Register Notice ML20034E1482020-02-13013 February 2020 Letter, Notice of Receipt, Public Meeting and Request for Comment on Post-Shutdown Decommissioning Activities Report ML19163A1362019-09-12012 September 2019 FRN Exemptions from the Requirements of 10 CFR Sections 50.82(a)(8)(i)(A) and 50.82(a)(8)(ii) ML19238A3692019-09-0303 September 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 09/10/2019 ML19136A1022019-08-12012 August 2019 Letter, Environmental Assessment and Finding of No Significant Impact Request for Exemptions from 10 CFR 50.82(a)(8)(ii) and 10 CFR 50.82 (a)(8)(i)(A), ML19136A0302019-08-12012 August 2019 FRN: Environmental Assessment and Finding of No Significant Impact Request for Exemptions from 10 CFR 50.82(a)(8)(ii) and 10 CFR 50.82 (a)(8)(i)(A) ML18151A9532018-06-0101 June 2018 Federal Register Notice: Environmental Assessment and Finding of No Significant Impact; Issuance NRC-2018-0096, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 20182018-05-14014 May 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 ML18127B7232018-05-14014 May 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 ML18093A1172018-04-17017 April 2018 Request for Withdrawal FRN NRC-2016-0237, OEDO-16-00436 - FRN, Final Director'S Decision - David Lochbaum, Union of Concerned Scientists, Letter 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9 (CAC Nos. MF8123 and MF8124)2017-05-12012 May 2017 OEDO-16-00436 - FRN, Final Director'S Decision - David Lochbaum, Union of Concerned Scientists, Letter 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9 (CAC Nos. MF8123 and MF8124) ML17108A5642017-05-12012 May 2017 OEDO-16-00436 - FRN, Final Director'S Decision - David Lochbaum, Union of Concerned Scientists, Letter 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9 NRC-2016-0151, FRN Re. Withdrawal of an Amendment Request (CAC Nos. MF7731 and MF7732)2017-04-24024 April 2017 FRN Re. Withdrawal of an Amendment Request (CAC Nos. MF7731 and MF7732) ML17100A2302017-04-24024 April 2017 FRN Re. Withdrawal of an Amendment Request ML17100A2292017-04-24024 April 2017 Withdrawal of an Amendment Request NRC-2016-0080, SRM-M150521A-2 - FRN Regarding Friends of Earth 2.206 Petition Based on Commission Memorandum and Order CLI-15-14 (CAC Nos. MF6443 and MF6444)2017-04-21021 April 2017 SRM-M150521A-2 - FRN Regarding Friends of Earth 2.206 Petition Based on Commission Memorandum and Order CLI-15-14 (CAC Nos. MF6443 and MF6444) ML17090A1902017-04-21021 April 2017 SRM-M150521A-2 - FRN Regarding Friends of Earth 2.206 Petition Based on Commission Memorandum and Order CLI-15-14 ML17095A9322017-04-21021 April 2017 Final Director'S Decision Under 10 CFR Sec. 2.206 Friends of the Earth 2.206 Petition Based on Commission Memorandum and Order CLI-15-14 ML16285A2202016-11-0909 November 2016 OEDO-16-00436 - Letter, Acknowledgement to David Lochbaum, Union of Concerned Scientists, Petitioner, 2.206 Petition Related to Apparent 50.9 Violation at Diablo Canyon Nuclear Power Plant ML16285A2392016-11-0909 November 2016 OEDO-16-00436 - FRN, Acknowledgement to David Lochbaum, Union of Concerned Scientists, Petitioner, 2.206 Petition Related to Apparent 50.9 Violation at Diablo Canyon Nuclear Power Plant ML16218A4832016-08-17017 August 2016 FRN, Diablo Canyon Power Plant LRA - Issuance of Exemption from the Requirements of 10 CFR 54.21 ML16084A7172016-04-12012 April 2016 SRM-M150521A-2 - Acknowledgement Letter to Petitioner, Friends of the Earth 2.206 Petition Based on Commission Memorandum and Order CLI-15-14 ML16084A7372016-04-12012 April 2016 SRM-M150521A-2 - Acknowledgement Federal Register Notice, Friends of the Earth 2.206 Petition Based on Commission Memorandum and Order CLI-15-14 ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 ML16004A1182016-01-0707 January 2016 FRN, Issuance of Confirmatory Orders, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended ML15174A0202016-01-0505 January 2016 ISFSI - Enclosure 5, Confirmatory Order, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended (CAC Nos. MF2809, MF2810, and L24991) ML15320A0032015-12-0808 December 2015 ISFSI - Environmental Assessment and Finding of No Significant Impact, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the AEA of 1954, as Amended (CAC MF2809-MF2810, and L24991) ML15320A0022015-12-0808 December 2015 ISFSI - Letter, Environmental Assessment and Finding of No Significant Impact, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the AEA of 1954, as Amended (CAC MF2809-MF2810, and L24991) NRC-2015-0244, ISFSI - Environmental Assessment and Finding of No Significant Impact, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the AEA of 1954, as Amended (CAC MF2809-MF2810, and L24991)2015-12-0808 December 2015 ISFSI - Environmental Assessment and Finding of No Significant Impact, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the AEA of 1954, as Amended (CAC MF2809-MF2810, and L24991) ML15177A0042015-10-21021 October 2015 ISFSI - FRN, Draft Environmental Assessment and Finding of No Significant Impact, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of AEA of 1954, as Amended (CAC MF2809, MF2810, and L24991) 2024-01-24
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-275 and 50-323; NRC-2022-0132]
Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Post-Shutdown Decommissioning Activities Report AGENCY: Nuclear Regulatory Commission.
ACTION: Public meeting and request for comment.
SUMMARY
- On December 4, 2019, Pacific Gas and Electric Company (PG&E, the licensee) submitted to the U.S. Nuclear Regulatory Commission (NRC) letters enclosing the post-shutdown decommissioning activities report (PSDAR), the site-specific decommissioning cost estimate (SSDCE), and the irradiated fuel management plan (IFMP), for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Diablo Canyon, Units 1 and 2). The PSDAR, including the SSDCE and IFMP, provide an overview of PG&Es planned activities, schedule, projected costs, and environmental impacts for the decommissioning of Diablo Canyon, Units 1 and 2. On February 21, 2020, the NRC solicited comments on these documents. Subsequently, PG&E submitted a notification of changes on October 19, 2021. The NRC planned to hold a public meeting in the vicinity of Diablo Canyon, Units 1 and 2, to discuss the PSDARs content, including the SSDCE and IFMP, and receive comments but decided to reschedule the public meeting due to concerns with the coronavirus disease 2019 (COVID-19) public health emergency. The NRC has rescheduled the public meeting to discuss the PSDAR, including the SSDCE and IFMP, and receive comments.
DATES: The public meeting will be held on Thursday, July 21, 2022, from 6:00 p.m.
until 9:00 p.m. Pacific Time (PT), at the San Luis Obispo County Government Building,
located at 1055 Monterey Street, in San Luis Obispo, California. The public meeting is also accessible through an online webinar. Submit comments by October 19, 2022.
Comments received after this date will be considered, if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date.
See section III, Request for Comment and Public Meeting, of this document for additional information.
ADDRESSES: You may submit comments by any of the following methods; however, the NRC encourages electronic comment submission through the Federal rulemaking website:
Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2022-0132. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301-415-0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the For Further Information Contact section of this document.
Mail comments to: Office of Administration, Mail Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting comments, see Obtaining Information and Submitting Comments in the SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Samson S. Lee, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone: 301-415-3168, email: Samson.Lee@nrc.gov.
SUPPLEMENTARY INFORMATION:
2
I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC-2022-0132 when contacting the NRC about the availability of information for this action. You may obtain publicly available information related to this action by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2022-0132.
NRCs Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to PDR.Resource@nrc.gov. For the convenience of the reader, instructions about obtaining materials referenced in this document are provided in the Availability of Documents section.
NRCs PDR: You may examine and purchase copies of public documents, by appointment, at the NRCs PDR, Room P1 B35, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8:00 a.m. and 4:00 p.m. Eastern Time, Monday through Friday, except Federal holidays.
B. Submitting Comments The NRC encourages electronic comment submission through the Federal rulemaking website (https://www.regulations.gov). Please include Docket ID NRC-2022-0132 in your comment submission.
3
The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.
II. Discussion PG&E is the holder of Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon, Units 1 and 2, respectively. The license provides, among other things, that the facility is subject to all relevant rules, regulations, and orders of the NRC now or hereafter in effect. The facility consists of a pair of Westinghouse four loop pressurized water reactors located in San Luis Obispo County, California. By letter dated November 27, 2018, PG&E informed the NRC that it will permanently cease power operations at Diablo Canyon, Units 1 and 2, on November 2, 2024, and August 26, 2025, respectively.
Paragraph 50.82(a)(4)(i) of title 10 of the Code of Federal Regulations (10 CFR) states that a PSDAR must contain a description of the planned decommissioning activities along with a schedule for their accomplishment, a discussion that provides the reasons for concluding that the environmental impacts associated with site-specific decommissioning activities will be bounded by appropriate previously issued 4
environmental impact statements, and an SSDCE, including the projected cost of managing irradiated fuel.
Accordingly, pursuant to 10 CFR 50.82(a)(4)(ii), the NRC noticed receipt of the Diablo Canyon, Units 1 and 2 PSDAR, including the SSDCE and IFMP, and made them available for public comment on February 21, 2020 (85 FR 10200). The public comment period closed on June 22, 2020. The purpose of the Federal Register notice (85 FR 10200; February 21, 2020) was to inform the public of a meeting on March 19, 2020, to discuss and accept comments on the PSDAR, including the SSDCE and IFMP. Due to the concerns of COVID-19, the NRC canceled the March 19, 2020, public meeting (85 FR 15505; March 18, 2020). On October 19, 2021, PG&E submitted a notification of changes to the PSDAR, including the SSDCE and IFMP.
III. Request for Comment and Public Meeting The NRC is requesting public comments on the PSDAR, including the SSDCE and IFMP, for Diablo Canyon, Units 1 and 2. The NRC is planning to hold the PSDAR meeting and receive comments on Thursday, July 21, 2022, from 6:00 p.m. until 9:00 p.m. (PT), at the San Luis Obispo County Government Building, located at 1055 Monterey Street, in San Luis Obispo, California. Please contact Samson Lee no later than July 8, 2022, if accommodations or special equipment is needed to attend or to provide comments. Information regarding the public meeting, including webinar information, will be posted on the NRCs public meeting website at least 10 calendar days before the meeting. The NRCs public meeting website is located at https://www.nrc.gov/public-involve.html. The NRC requests that comments provided outside the Thursday, July 21, 2022, meeting be submitted as noted in section I, Obtaining Information and Submitting Comments, of this document in writing by October 19, 2022.
5
IV. Availability of Documents The documents identified in the following table are available to interested persons through one or more of the following methods, as indicated.
Document Description ADAMS Accession No.
Letter from PG&E to the NRC, Certification ML18331A553 of Permanent Cessation of Power Operations, dated November 27, 2018.
Letter from PG&E to the NRC, Diablo ML19338F173 Canyon Power Plant, Units 1 and 2 - Post-Shutdown Decommissioning Activities Report, dated December 4, 2019.
Letter from PG&E to the NRC, Diablo ML19338F260 Canyon Power Plant, Units 1 and 2 Irradiated Fuel Management Plan, dated December 4, 2019.
Letter from PG&E to the NRC, Diablo ML19345D344 and ML19345D345 Canyon Power Plant, Units 1 and 2 - Site-Specific Decommissioning Cost Estimate, dated December 4, 2019 (publicly available version).
Letter from PG&E to the NRC, Notification of ML21293A120 Changes to Post-Shutdown Decommissioning Activities Report, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan for Diablo Canyon Power Plant, Units 1 and 2, dated October 19, 2021.
Dated: June 17, 2022.
For the Nuclear Regulatory Commission.
/RA/
Jennifer L. Dixon-Herrity, Chief, Plant Licensing Branch IV, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
6