Pacific Gas and Electric Company"'

James M. Welsch Diablo Canyon Power Plant Senior Vice President P.O. Box 56 Generation and Avila Beach, CA 93424 Chief Nuclear Officer 805,545.3242 E*Mail: James.Welsch@pge.com July 1, 2019 PG&E Letter DCL-19-055 U.S. Nuclear Regulatory Commission 10 CFR 50.75(f)

ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Revised Enclosure for the Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2

Reference:

1. PG&E Letter DCL-19-020, "Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2," dated March 26, 20 19 (ML19094B780)

Dear Commissioners and Staff:

In Reference 1, Pacific Gas and Electric Company (PG&E) submitted the Decommissioning Funding Report for Diablo Canyon Power Plant (DCPP), Units 1 and 2. Subsequent to the submittal, PG&E identified information included in , Decommissioning Cost Estimate by Phase and Cost Category that needed to be updated. The 2018 forecasted expenditures included in Enclosure 3 of Reference 1, were not updated with 2018 actuals. This resulted in an escalated cost difference of approximately $50,266 when escalated to 2019 dollars. In addition, the ISFSI Restoration Phase in Enclosure 3 of Reference 1, reflected an end date of 2072, which has been revised to 2076. These items have been entered into the DCPP corrective action program for evaluation . The attached enclosure is being submitted to correct the items discussed above.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions regarding this submittal, please contact Mr. Philippe Soenen at (805) 459-3701.

Sincerely,

_J\ _-. J/t u) c.A.~

J~ Welsch A m e mb e r of th e STARS Alli an ce Cal laway

  • Di abl o Can yon
  • Pal o Ve rd e
  • Wol f Cr e ek

Document Control Desk PG&E Letter DCL-19-055 July 1, 2019 Page2 Enclosure cc: Diablo Distribution cc/enc: Scott A Morris, NRG Region IV Administrator Christopher W . Newport, NRG Senior Resident Inspector Balwant K. Singal, NRG Sen ior Project Manager A me mbe r of t he STARS Alli anc e Call awa y

  • Diablo Can yo n
  • Palo Ve rd e
  • Wol f Cr eek

Enclosure PG&E Letter DCL-19-055 Diablo Canyon Power Plant Unit 1 and 2 Revised Decommissioning Cost Estimate by Phase and Cost Category

6/4/2019 2:47 PM A B C D E F G H I J K L M 1-Pre Shutdown 2-Power Block 4-Building . . . . .

ID Scope Description Total Estimate Pl . M d'fl 1. 3-Wet Storage D *. 5-Site Restoration 6-ISFSI Operaflons 7-ISFSI Restoration License Spent Fuel Site .. Contractor anning o I ca ions emo 111I0n . . Uflhty Hours Nominal/ 2019$ Termlnaflon Management Restoration Hours 12/2010. 10/2024 11/2024

  • 4/2027 5/2027 - 6/2032 7/2032
  • 4/2035 5/2035
  • 12/2038 1/2039 - 8/2067 9/2067 - 1/2076 Unassigned Costs 1 Program Managemflnt, Oversight, and fees $ 1,547,114,192 ' $ - * - 162,718,045- $ -
  • 345,608,190 $- *
  • 433,485~478- * $ 214,781,809 * $- - 161,090,622- $ *
  • 198,817,'i89. $ - - - 30,612,758 T -l,T39;092,246 _$_ 292,320,496 $ 115,701,450 ----5,053,210- - 1,035,578 1.01 Staffing $ 770,001,897 $ 118,699,102 $ 132,913,623 $ 279,950,992 $ 106,398,479 $ 75,712,533 $ 48,053,101 $ 8,274,068 $ 610,906,798 s 87,463,854 $ 71,631,245 5,033,370 46,617 1.02 Severance $ 165,856,154 $ $ 121,204,863 $ $ 22,549,430 $ 13,864,580 $ 6,648,159 $ 1,589,121 $ 157,618,873 $ 8,237,281 $

1.03 Energy $ 71,553,979 $ $ 7,371,738 $ 35,478,027 $ 8,504,942 $ 9,462,221 $ 10,737,052 $ $ 60,591,699 $ 10,762,761 $ 199,520 1.04 Insurance $ 29,160,198 $ $ 14,574,950 $ 2,076,827 $ 812,911 $ 1,055,133 $ 8,234,515 $ 2,405,862 $ 18,347,570 $ 10,660,039 $ 152,590 1.05 Property Tax $ 41,979,145 $ $ 1,397,940 $ 4,305,565 $ 2,358,026 $ 3,060,520 $ 23,880,092 $ 6,977,001 $ 10,622,521 $ 30,914,114 $ 442,510 1.06 NRC Fees/ Reviews $ 71,695,919 $ 14,344,321 $ 6,222,298 $ 12,137,240 $ 3,081,384 $ 3,798,325 $ 27,605,294 $ 4,507,057 $ 32,666,204 $ 38,868,132 $ 161,583 118,114 1.07 Association/Industry Fees $ 8,409,342 $ $ 1,433,479 $ 3,413,786 $ 1,707,551 $ 1,854,526 $ $ $ 8,409,342 $ $

1.08 Facility Maintenance $ 22,917,186 $ $ 6,279,847 $ 7,699,586 $ 3,464,971 $ 2,418,751 $ 2,918,846 $ 135,185 $ 19,269,680 $ 3,483,103 $ 164,404 174,477 1.09 Water Management $ 76,017,579 $ $ 8,133,055 $ 18,144,201 $ 27,999,117 $ 11,825,333 $ 9,132,636 $ 783,237 $ 66,101,705 $ 9,915,874 $ 111,580 1.10 Permits $ 60,890,989 $ 20,410,114 $ 1,752,153 $ 15,650,716 $ 8,239,283 $ 1,256,766 $ 10,492,088 $ 3,089,868 $ 21,289,065 $ 12,200,979 $ 27,400,945 172,735 1.11 Future Land Use $ 13,149,133 $ 7,690,119 $ 4,921,078 $ 537,936 $ $ $ $ $ $ $ 13,149,133 101,837 1.12 Spent Fuel Management Plan $ 63,295,026 $ 60,648 $ 1,694,265 $ 6,135,452 $ 5,798,740 $ 10,445,952 $ 38,911,987 $ 247,982 $ , 893,223 $ 62,401,802 $ 182,663 1.13 License Termination Plan $ 15,094,058 $ $ $ 2,043,280 $ 4,380,388 $ 4,493,041 $ 2,031,709 $ 2,145,639 $ 10,916,709 $ 4,177,349 $ 65,437 1.14 Site Characterization $ 15,811,310 $ $ 15,794,861 $ 16,449 s $ $ $ $ 15,811,310 s $ 57,805 1.15 Emergency Planning - Senate Bill 1090 $ 46,422,562 $ $ 756,419 $ 21,636,359 $ 11,519,145 $ 12,510,638 $ $ $ 46,422,562 $ $

1.16 Emergency Planning $ 28,791,704 $ $ 15,922,189 $ 9,157,270 $ i,214,100 $ 2,498,145 $ $ $ 27,612,161 $ $ 1,179,543 19,840 1.17 Consumables $ 39,667,855 $ $ 4,339,638 $ 13,239,174 $ 5,733,243 $ 5,726,253 $ 10,171,810 s 457,736 $ 25,212,669 $ 13,235,210 $ 1,219,976 4,313 1.18 Public Outreach & Stakeholder Engagement $ 6,400,156 $ 1,513,741 s 895,793 $ 1,862,619 $ 1,020,100 $ 1,107,903 s $ $ 6,400,156 $ $

2 Security Operations $* ~7,882,Q~~ ., ,. .. ** ...  : ,,

2.01 Security Staffing $ 578,430,000 $ $ 100,954,945 $ 225,168,401 $ 20,296,023 $ 26,322,018 $ 205,511,955 $ 4,311,026 s 574,118,974 $ 5,035,669 2.02 Other Security Related Costs $ 19,452,038 $ $ 1,382,168 $ 4,433,865 $ 2,808,342 $ 3,601,824 $ 6,829,014 $ 11,056,219 s 7,283,399 $ 1,112,420 3.01 Waste & Transportation Management $ 133,020,124 $ $ 3,597,570 $ 16,391,211 $ 40,710,400 $ 59,639,768 $ 1,486,243 11,194,932 63,920,988 $ 12,126,299 56,972,837 1,042,349 3.02 Transportation $ 113,028,877 $ $ 759,808 $ 17,931,460 $ 66,309,446 $ 24,138,899 $ 3,889,264 71,136,077 $ 3,856,224 38,036,576 3.03 Disposal $ 666,559,834 $ $ 571,011 $ 13,475,855 $ 543,347,582 $ 103,010,904 s 6,154,482 654,340,858 $ 6,154,482 6,064,493 3.04 Material Management $ 54,651,207 $ 948,775 $ 23,381,295 $ 13,862,313 $ 9,288,092 $ 2,730,735 $ 978,267 3,461,730 20,364,990 $ 4,439,997 29,846,219 313,472 3.05 Asset Recovery $ (_56,005,525) $ $ (7,835,192) $ (12,857,054) $ (27,289,933) $ (8,023,346) $ {9,343,435) $ {46,662,090) 3.06 GTCC Disposal $ 42,689,888 $ $ $ $ $ $ 42,689,888 $ 42,689,888 Discrete Costs 4 Power Block Modifications $ 85,116,147 , $ 20,759,023 $ 63,851,727 $ 385,006 $ 120,391 $ - $ - $

  • 1 $ 85,116,147 $ * $ * - 482,193 4.01 U1 Spent Fuel Pool Island s 7,061,148 $ 1,988,226 $ 4,867,149 $ 156,923 $ 48,850 s s $ $ 7,061,148 $ $ 41,714 4.02 U2 Spent Fuel Pool Island $ 6,426,203 $ 1,097,322 $ 5,029,257 $ 228,083 $ 71,540 $ $ $ $ 6,426,203 $ $ 37,633 4.03 Install 230kV Baywood Feed $ 18,298,564 $ 4,849,152 $ 13,449,412 $ $ $ s $ $ 18,298,564 s $ 106,701 4.04 Ul Cold and Dark $ 19,669,415 $ 3,414,865 $ 16,254,550 $ $ s s $ $ 19,669,415 $ $ 101,561 4.05 U2 Cold and Dark $ 19,669,415 $ 3,414,865 $ 16,254,550 $ $ $ $ $ $ 19,669,415 $ $ 101,561 4.06 Security Modifications $ 13,991,403 $ 5,994,594 $ 7,996,809 $ $ $ $ $ $ 13,991,403 $ $ 93,024 5 Site Infrastructure $ 148,417,133 I $ 7,440,954 $ 46,961,293 $ 84,766,313 $ 5,625,329 $ 2,349,154 $ 1,170,666 $ 103,425 $ 147,143,043 $ 1,274,090 $ -
  • 839,339 5.01 Offsite Infrastructure $ 30,798,596 $ $ 160,138 $ 30,638,458 $ $ s $ $ 30,798,596 $ $ 133,448 5.02 Road Improvements $ 17,352,515 $ s 11,883,504 $ 2,220,502 s 947,691 $ 1,028,423 $ 1,169,313 $ 103,083 $ 16,080,119 $ 1,272,395 $ 88,996 5.03 Facility Construction $ 30,223,282 $ 190,237 $ 17,717,857 $ 12,315,189 $ $ $ $ $ 30,223,282 $ $ 166,239 5.04 Existing Building and Structure Modifications $ 21,538,952 $ $ 8,755,920 $ 12,193,104 $ 496,202 $ 92,031 $ 1,353 $ 342 $ 21,537,257 $ 1,695 $ 112,291 5.05 ISFSI Security Building Construction $ 14,875,382 $ $ 2,735,889 $ 12,139,493 $ $ $ $ $ 14,875,382 $ $ 77,090 5.06 ISFSI Pad Expansion for GTCC Storage $ 15,106,724 $ 6,698,754 $ 1,435,894 $ 6,972,076 $ $ $ $ $ 15,106,724 $ $ 102,342 5.07 Project Oversight and Support $ 18,521,682 $ 551,963 $ 4,272,091 $ 8,287,492 $ 4,181,436 $ 1,228,700 $ $ $ 18,521,682 $ $ 158,934 6 Large Component Removal $ 182,003,735 $ - $ 44,715,541 $ 137,288,195 $ - $ * $ - $ * ,$ 182,003,735 $ * $ * - 352,279 6.01 Legacy Steam Generators $ 51,270,407 $ $ 28,643,919 $ 22,626,489 $ $ $ s $ Sl,270,407 $ $ 46,260 6.02 Legacy Rx Heads $ 3,978,998 $ $ 311,667 $ 3,667,331 $ $ $ $ $ 3,978,998 $ $ 10,096 6.03 Steam Generators $ 85,475,209 $ $ 9,668,181 $ 75,807,028 $ $ $ $ $ 85,475,209 $ $ 169,010 6.04 Reactor Heads $ 5,022,409 $ $ 238,387 $ 4,784,021 $ $ $ $ $ 5,022,409 $ $ 4,921 6.05 Reactor Coolant Pumps $ 10,330,948 $ $ 658,577 $ 9,672,371 $ $ $ $ $ 10,330,948 $ $ 21,014 6.06 Pressurizers $ 4,640,148 $ $ 299,106 $ 4,341,042 $ $ $ $ $ 4,640,148 $ $ 5,181 6.07 Manipulators $ 1,067,207 $ $ 211,086 $ 856,120 $ $ $ $ $ 1,067,207 $ $ 2,318 6.08 Generators and Exciters s 625,072 $ $ $ 625,072 $ $ s $ $ 625,072 $ $ 3,654 6.09 Main Turbines $ 1,725,465 $ $ $ 1,725,465 $ $ $ $ $ 1,725,465 s $ 10,420 6.10 Diesel Generators $ 763,459 $ $ $ 763,459 $ $ $ $ $ 763,459 $ s 3,086 6.11 Other Turbine Building Components $ 5,664,948 $ $ $ 5,664,948 $ $ $ $ $ 5,664,948 $ $ 26,472 6.12 Large Access Penetrations $ 343,878 $ $ 343,878 $ $ s $ $ $ 343,878 $ $ 1,025

6/4/2019 2:47 PM Scope Description Total Estimate 3-Wet Storage 5-Site Restoration 6-ISFSI Operations 7-ISFSI Restoration License Spent Fuel Sile Contractor Utility Hours

- u ** ** i. *** **- u*, ~- * * **

$ 11,095,587 $ - $ -

_$__ ~63,270,9~1 $ 532,765 7.01 Ul Interna ls Segmentation $ 18,226,210 $ $ $ 18,226,210 $ $ $ $ $ 18,226,210 $ $ 74,760 7.02 Ul Reactor Segmentation $ 10,690,780 $ $ $ 4,863,849 $ 5,826,931 $ $ $ $ 10,690,780 $ $ 40,810 7.03 U2 Interna ls Segmentation $ 17,998,352 $ $ $ 15,420,246 $ 2,578,106 $ $ $ $ 17,998,352 $ $ 63,490 7.04 U2 Reactor Segmentation $ 8,789,965 $ $ $ 7,893 $ 8,782,072 $ $ $ $ 8,789,965 $ $ 33,850 7.05 Waste & Transportation $ 214,824,738 $ $ $ 67,371,752 $ 147,452,986 $ $ $ $ 214,824,738 $ $ 3,430 7.06 Project Oversight and Support $ 38,458,412 $ 1,395,737 $ $ 27,738,946 $ 9,323,729 $ $ $ $ 38,458,412 $ $ 182,551 7.07 Specialty Equipment $ 54,282,465 $ $ $ 52,729,651 $ 1,552,814 $ $ $ $ 54,282,465 $ $ 133,874 8 Spent Fuel Transfer to ISFSI $ 246,588,208 $ - $ 141,156 $ 245,388,614 $ 412,330 $ 364,135 $ 281,973 $ * $ 29,217,316 $ 217,370,892 $ - 52,988 327,906 8.01 SNF and GTCC Cask Procurement $ 188,997,570 $ $ $ 188,997,570 $ $ $ $ $ 21,057,935 $ 167,939,635 $ 9,940 8.02 U1 Spent Fuel transfer to ISFSI $ 29,106,017 $ $ 117,399 $ 28,958,604 $ 30,014 $ $ $ $ 2,176,885 $ 26,929,132 $ 26,494 162,261 8.03 U2 Spent Fue l transfer to ISFSI $ 22,220,152 $ $ 23,756 $ 22,166,382 $ 30,014 $ $ $ $ $ 22,220,152 $ 26,494 123,121 8.04 Ul GTCC Transfer to ISFSI $ 3,760,418 $ .$ $ 2,762,007 $ 352,303 $ 364,135 $ 281,973 $ $ 3,478,445 $ 281,973 $ 17,535 8.05 U2 GTCC Transfer to ISFSI $ 2,504,051 $ $ $ 2,504,051 $ $ $ $ $ 2,504,051 $ $ 15,049 9 Turbine Bldg $ 72,556,880 $ - $ 3,597,570 $ 51,255,243 $ ' 17,701,386 $ 2,680 $ - $ - $ 72,556,880 $ - $ - - 406,964 9.01 Ul Decontamination $ 21,736,343 $ $ 2,690,730 $ 18,146,091 $ 899,522 $ $ $ $ 21,736,343 $ $ 131,306 9.02 U1 System & Area Closure $ 7,089,593 $ $ 154,087 $ 6,254,550 $ 680,956 $ $ $ $ 7,089,593 $ $ 35,348 9.03 Ul Demolition $ 5,914,199 $ $ $ 1,071,812 $ 4,841,117 $ 1,271 $ $ $ 5,914,199 $ $ 27,661 9.04 U2 Decontamination $ 19,746,838 $ $ 478,705 $ 14,147,089 $ 5,121,044 $ $ $ $ 19,746,838 $ $ 119,335 9.05 U2 System & Area Closure $ 11,475,335 $ $ 274,047 $ 10,423,944 $ 777,344 $ $ $ $ 11,475,335 $ $ 64,015 9.06 U2 Demolition $ 6,594,571 $ $ $ 1,211,757 $ 5,381,404 $ 1,409 $ $ $ 6,594,571 $ $ 29,300 10 Aux Building $ 97,218,709 $ - $ 9,630,828 $ 63,937,297 $ 23,645,593 $ 4,991 $ - $ - $ 97,218,709 $ - $ - - 598,758 10.01 Ul Decontamination $ 3,149,632 $ $ 1,213,272 $ 519,116 $ 1,417,245 $ $ $ $ 3,149,632 $ $ 20,566 10.02 Ul System & Area Closure $ 35,944,051 $ $ 3,743,952 $ 30,937,022 $ 1,263,077 $ $ $ $ 35,944,051 $ $ 240,451 10.03 Ul Demolition $ 11,773,222 $ $ $ 2,160,942 $ 9,609,762 $ 2,518 $ $ $ 11,773,222 $ $ 50,901 10.04 U2 Decontamination $ 2,034,673 $ $ 1,201,667 $ 519,116 $ 313,891 $ $ $ $ 2,034,673 $ $ 12,530 10.05 U2 System & Area Closure $ 32,708,239 $ $ 3,471,937 $ 27,658,324 $ 1,577,978 $ $ $ $ 32,708,239 $ $ 217,713 10.06 U2 Demolition $ 11,608,892 $ $ $ 2,142,778 $ 9,463,641 $ 2,472 $ s $ 11,608,892 $ $ 56,597 11 Containment $ 127,655,873 $ - $ 38,100,617 $ 52,420,290 $ 37,126,252 $ 8,713 $ * $ - ,$ 127,655,873 $ - $ - - 739,321 '

11.01 Ul Decontam ination $ 8,861,905 $ $ 5,428,965 $ 2,628,087 $ 804,852 $ $ $ $ 8,861,905 $ $ 50,887 11.02 Ul System & Area Closure $ 35,332,009 $ $ 19,211,008 $ 15,091,861 $ 1,029,140 $ $ $ $ 35,332,009 $ $ 231,803 11.03 Ul Demolition $ 20,232,216 $ $ $ 3,691,222 $ 16,536,6S6 $ 4,338 $ $ $ 20,232,216 $ $ 90,094 11.04 U2 Decontamination $ 6,909,313 $ $ 4,140,241 $ 1,808,148 $ 960,924 $ $ $ $ 6,909,313 $ $ 37,891 11.05 U2 System & Area Closure $ 35,839,637 $ s 9,320,402 $ 25,437,481 $ 1,081,754 $ $ $ $ 35,839,637 $ $ 237,014 11.06 U2 Demolition $ 20,480,794 $ $ $ 3,763,492 $ 16,712,927 $ 4,376 $ $ $ 20,480,794 $ $ 91,631 12 Fuel Handling Building $ 51,262,384 , $ - $ 963,883 $ 17,185,093 $ 33,111,018 $ 2,390 $ - $ - I $ 51,262,384 $ - $ - - 298,259 ,

12.01 Ul Decontamination $ 2,126,758 $ $ $ 229,844 $ 1,896,914 $ $ $ $ 2,126,758 $ $ 11,900 12.02 Ul System & Area Closure $ 15,730,796 $ $ 419,026 $ 11,817,220 $ 3,494,551 $ $ $ $ 15,730,796 $ $ 102,621 12,03 Ul Demolition $ 7,305,075 $ $ $ 1,349,351 s 5,954,160 $ 1,563 $ $ $ 7,305,075 $ $ 25,448 12.04 U2 Decontamination $ 2,062,991 s $ $ 229,844 $ 1,833,147 $ s $ $ 2,062,991 $ $ 11,475 12.05 U2 System & Area Closure $ 20,123,067 $ $ 544,858 $ 2,818,777 s 16,759,432 $ $ $ $ 20,123,067 s $ 130,906 12.06 U2 Demolition $ 3,913,696 $ $ $ 740,056 $ 3,172,813 $ 827 $ $ $ 3,913,696 $ $ 15,909 14 Balance of Site $ 85,020,639 $ 4,385,440 $ 21,526,529 $ 27,204,958 $ 26,955,307 $ 4,948,406 $ - $ -  :$ 26,643,629 $ - $ 58,377,010 - 502,627 '

14.01 Decontamination $ 11,705,190 $ $ 1,304,599 $ 6,279,970 $ 3,815,763 $ 304,858 $ $ $ 11,705,190 $ $ 77,563 14.02 System & Area Closure $ 14,938,440 $ $ 3,582,932 $ 5,425,182 $ 5,930,326 $ $ $ $ 14,938,440 $ $ 89,477 14.03 Demolition $ 58,377,010 $ 4,385,440 $ 16,638,998 $ 15,499,806 $ 17,209,218 $ 4,643,548 $ $ $ $ $ 58,377,010 335,587 15 Intake Structure $ 43,664,111 $ - $ 4,481,484 $ 34,822,877 $ 4,338,161 $ 21,589 $ - $ - $ 6,851,036 $ - $ 36,813,075 . 174,459 15.01 System Area Closure $ 6,851,036 $ $ 4,481,484 $ 2,058,987 $ 310,565 $ $ $ $ 6,851,036 $ $ 43,407 15.02 Coffer Dam $ 14,973,789 $ $ $ 14,973,789 $ $ $ $ $ $ $ 14,973,789 35,818 15.03 Demolition $ 21,839,285 $ $ $ 17,790,101 $ 4,027,595 $ 21,589 $ $ $ $ $ 21,839,285 95,234 16 Discharge Structure $ 15,866,840 $ - $ - $ 504,630 $ 15,361,598 $ 612 $ - $ - $ 15,866,840 $ - $ - - 69,467 16.01 Discharge Piping Decon $ 601,712 $ $ $ $ 601,712 $ $ $ $ 601,712 $ $ 3,710 16.02 Coffer Dam $ 7,588,698 $ $ $ $ 7,588,698 $ $ $ $ 7,588,698 $ $ 24,492 16.03 Demolition $ 2,828,124 $ $ $ 504,630 $ .2,322,882 $ 612 $ $ $ 2,828,124 $ $ 11,852 16.04 System Area Closure $ 4,848,306 $ $ $ $ 4,848,306 $ $ $ $ 4,848,306 $ $ 29,412

,. ;.. . **
t,Jt * *'. ..... *
  • a,.. , * * ,,

17.01 Demolition $ 144,209,7381 $ $ $ $ 1,091,666 $ 143,118,071 $ $ - $ $ 144,209, 7381 131,304 17.02 17.03 Transportation Disposa l Cost 134,931,130 $

20,680,076 $

134,931,130 $

20,680,076 $

$ H $

$ 134,931,130

$ 20,680,076

6/4/2019 2:47 PM A B C D E I F G H I J K L M

. -.:=.....

1-Pre Shutdown 2-Power Block 4- Building . . . .

ID Scope Description Total Estimate Pl . M d'f' 1. 3-Wet Storage D 1.1. 5-SJ!e Restoration 6-ISFSI Operallons 7-ISFSI Restoralron License Spent Fuel Site Contractor 18 Non-lSFSI Site Restoration $ 142,231,716 $ * $ 5,681,058 $ 11,185,998 $ 22,858,339 $ 83,193,972 $ 14,307,529 $ 5,004,820 $ - $ * $ 142,231,716 . 650,452 18.01 Ut ilities and St ructures Demo $ 33,059,333 $ $ 3,358,625 $ $ 1,419,209 $ 12,459,587 $ 10,817,093 $ 5,004,820 $ $ $ 33,0S9,333 85,543 18.02 Soil Remediation $ 4,367,837 $ $ $ $ 1,477,141 $ 2,757,028 $ 133,668 $ $ $ $ 4,367,837 21,781 18.03 Final Site Survey $ 42,681,623 $ $ $ 4,908,262 $ 3,976,540 $ 33,796,821 $ $ $ $ $ 42,681,623 247,056 18.04 Grading and Landscaping $ 62,122,923 $ $ 2,322,433 $ 6,277,736 $ 15,985,450 $ 34,180,536 $ 3,356,768 $ $ $ $ 62,122,923 296,072 19 Spent Fuel Transfer to DOE $ 26,382,419 $ * $ * $ 2,902 $ 428,695 $ 991,714 $ 21,262,076 $ 3,697,031 $ - $ 26,382,419 $ - . 117,160 19.01 Ul Spent Fuel Transfer to DOE $ 7,296,082 $ $ $ $ $ 526,120 $ 6,769,962 $ $ $ 7,296,082 $ 51,795 19.02 U2 Spent Fuel Tra nsfer to DOE $ 18,034,098 $ $ $ 2,902 $ 428,695 $ 465,594 $ 13,439,875 $ 3,697,031 $ $ 18,034,098 $ 57,895 19.03 GTCC Transfer to Offsite Facility $ 1,052,239 $ $ $ $ $ $ 1,052,239 $ $ $ 1,052,239 $ 7,470 20 ISFSI Demolition and Site Restoration $ 57,850,179 $ * $ * $ * $ - $ - $ 5,191,303 $ 52,658,876 $ - $ 57,850,179 $ - . 287,967 20.01 Utilities and Structu res Demo $ 24,962,338 $ $ $ $ $ $ 2,662,766 $ 22,299,572 $ $ 24,962,338 $ 133,651 20 .02 Soil Remediation $ 2,165,407 $ $ $ $ $ $ $ 2,165,407 $ $ 2,165,407 $ 12,324 20 .03 Fina l Site Survey $ 2,026,815 $ $ $ $ $ $ $ 2,026,815 $ $ 2,026,815 $ 9,040 20.04 Grading and Landscaping $ 28,695,619 $ $ $ $ $ $ 2,528,537 $ 26,167,08_2 $ $ 28,695,619 $ 132,951 GRAND TOTAL $ 5,143,867,472 $ 197,647,972 $ 708,071,479 $ 1,624,597,492 $ 1,234,544,465 $ 763,129,060 $ 498,526,203 $ 117,350,801 $ 3,159,685,482 $ 1,245,867,341 $ 738,314,649 10,141,866 8,967,383 Note : 2010-2018 in Nominal Dolla rs. 2019-2076 in 2019$