Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23307A162 | 3 November 2023 | OIG-24-A-01 Inspector Generals Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 | Probabilistic Risk Assessment License Renewal Subsequent License Renewal Nuclear Energy Innovation and Modernization Act Environmental Justice Machine learning |
L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation | 9 March 2022 | Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation | Coatings Nondestructive Examination VT-2 Functionality Assessment Incorporated by reference Decommissioning Funding Plan Authorized possession limits Aging Management License Renewal Earthquake Control of Heavy Loads Fuel cladding Environmental Justice |
ML21076A614 | 17 March 2021 | NRC Examination Report 05000275/2021301 and 05000323/2021301 | |
ML20239A956 | 26 August 2020 | Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 | Enforcement Discretion Earthquake Through-Wall Leak |
DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 | 1 July 2019 | Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 | Weld Overlay |
DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 | 11 September 2018 | Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 | Weld Overlay |
DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 | 8 August 2018 | Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 | Hydrostatic Earthquake |
DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight | 24 April 2018 | Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights | Safe Shutdown High winds Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Large early release frequency Earthquake |
ML17341A065 | 30 November 2017 | Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review | Hydrostatic Tornado Generated Missile Earthquake |
ML17334A105 | 29 November 2017 | Reactor Coolant System Pressure and Temperature Limits Report | Stroke time Hydrostatic Pressure and Temperature Limits Report |
ML17229B617 | 17 August 2017 | Flaw Evaluation of Residual Heat Removal Suction Weld Joint | Finite Element Analysis |
DCL-17-064, Plant Focused Evaluation Report for External Flooding | 19 July 2017 | Plant Focused Evaluation Report for External Flooding | Safe Shutdown Internal Flooding Hydrostatic FLEX Fukushima Dai-Ichi |
DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint | 18 May 2017 | Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint | |
DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 | 9 November 2016 | Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 | Boric Acid Time Critical Operator Action Deep Dose Equivalent Fuel cladding Recently irradiated fuel GOTHIC Operability Assessment |
ML16314C691 | 9 November 2016 | Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture | |
ML16314B082 | 9 November 2016 | Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping | Safe Shutdown Design basis earthquake Earthquake |
ML16287A755 | 6 October 2016 | Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 | Boric Acid Time Critical Operator Action Deep Dose Equivalent Fuel cladding Recently irradiated fuel GOTHIC Operability Assessment |
ML16169A265 | 18 May 2016 | Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 | Boric Acid Time Critical Operator Action Deep Dose Equivalent Fuel cladding Recently irradiated fuel GOTHIC Operability Assessment |
ML16146A095 | 21 April 2016 | 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. | Hot Short Safe Shutdown Mission time Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation Thermoset Large early release frequency Earthquake Fire Protection Program |
DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). | 31 March 2016 | 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). | |
ML16238A104 | 31 March 2016 | 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi | 15 January 2016 | Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi | |
ML16061A464 | 15 January 2016 | Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi | |
ML16061A468 | 15 January 2016 | 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV | 15 January 2016 | Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV | |
ML16061A459 | 14 January 2016 | Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report | 14 January 2016 | Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report | |
ML16004A354 | 11 December 2015 | Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Terms Summary of Dose Analysis & Results, Revision 1 | Boric Acid Time Critical Operator Action Deep Dose Equivalent Fuel cladding Recently irradiated fuel GOTHIC Operability Assessment |
DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report | 5 November 2015 | ISFSI - Submits 2014 Annual Commitment Change Summary Report | |
ML15176A528 | 15 May 2015 | License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 | |
DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 | 15 May 2015 | Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 | |
ML16061A475 | 12 December 2014 | Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report | |
ML16061A471 | 12 December 2014 | Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report | 12 December 2014 | Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report | 12 December 2014 | Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report | |
DCL-16-020, Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report | 12 December 2014 | Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report | |
ML16061A460 | 9 December 2014 | Revision 9 to 993754-1-915-NP, Safety Analysis | Safe Shutdown |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis | 9 December 2014 | Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis | Safe Shutdown |
ML16061A469 | 1 December 2014 | Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report | 1 December 2014 | Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report | 1 December 2014 | Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report | 1 December 2014 | Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report | |
ML16061A466 | 1 December 2014 | Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report | |
ML16061A473 | 1 December 2014 | Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-854-0-NP, Protection Set Iii, Hardware Validation Test Report | 12 September 2014 | Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-854-0-NP, Protection Set Iii, Hardware Validation Test Report | |
ML16061A470 | 12 September 2014 | Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report | |
ML16061A474 | 12 September 2014 | Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report | |
ML16061A476 | 12 September 2014 | Revision 0 to 993754-13-854-0-NP, Protection Set Iii, Hardware Validation Test Report | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report | 12 September 2014 | Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report | 12 September 2014 | Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report |