Integrated Inspection Report 05000390/2023002 and 05000391/2023002
ML23220A158
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 08/09/2023
From: Louis Mckown
Division Reactor Projects II
To: Jim Barstow
Tennessee Valley Authority
References
IR 2023002
Download: ML23220A158 (1)


See also: IR 05000390/2023002

Text

James Barstow

Vice President Nuclear Regulatory

Affairs & Support Services

Tennessee Valley Authority

1101 Market Street, LP 4A-C

Chattanooga, TN 37402-2801

SUBJECT: WATTS BAR NUCLEAR PLANT - INTEGRATED INSPECTION REPORT

05000390/2023002 AND 05000391/2023002

Dear James Barstow:

On June 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at

Watts Bar Nuclear Plant. On August 3, 2023, the NRC inspectors discussed the results of this

inspection with Mr. Anthony Williams, Site VP and other members of your staff. The results of

this inspection are documented in the enclosed report.

Two findings of very low safety significance (Green) are documented in this report. Two of these

findings involved violations of NRC requirements. We are treating these violations as non-cited

violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this

inspection report, you should provide a response within 30 days of the date of this inspection

report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional

Administrator, Region II; the Director, Office of Enforcement; and the NRC Resident Inspector at

Watts Bar Nuclear Plant.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; and the NRC

Resident Inspector at Watts Bar Nuclear Plant.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.August 9, 2023

J. Barstow 2

Sincerely,

Louis J. McKown, II, Chief

Reactor Projects Branch #5

Division of Reactor Projects

Docket Nos. 05000390 and 05000391

License Nos. NPF-90 and NPF-96

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV

Signed by McKown, Louis

on 08/09/23

ML23220A158

X SUNSI Review X Non-Sensitive X Publicly Available

Sensitive Non-Publicly Available

OFFICE RII/DRP RII/DRP RII/DRP

NAME W. Deschaine N. Smalley L. McKown

DATE 08/9/2023 08/9 /2023 08/9 /2023

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers: 05000390 and 05000391

License Numbers: NPF-90 and NPF-96

Report Numbers: 05000390/2023002 and 05000391/2023002

Enterprise Identifier: I-2023-002-0023

Licensee: Tennessee Valley Authority

Facility: Watts Bar Nuclear Plant

Location: Spring City, TN 37381

Inspection Dates: April 1, 2023, to June 30, 2023

Inspectors: J. Bell, Senior Health Physicist

W. Deschaine, Senior Resident Inspector

K. Henry, Resident Inspector

M. Keefe-Forsyth, Safety Culture Program Manager

M. Magyar, Reactor Inspector

A. Nielsen, Senior Health Physicist

J. Rivera, Health Physicist

D. Simpkins, Sr. Tech Training Program Specialist

J. Weaver, Allegations & Enforcement Specialist

R. Wehrmann, Resident Inspector

D. Willis, Team Leader

Approved By: Louis J. McKown, II, Chief

Reactor Projects Branch #5

Division of Reactor Projects

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at Watts Bar Nuclear Plant, in accordance

with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for

overseeing the safe operation of commercial nuclear power reactors. Refer to

https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to demonstrate effective control of performance of a maintenance rule (a)(2) system

Cornerstone Significance Cross-Cutting Report

Aspect Section

Mitigating Green [H.3] - Change 71111.12

Systems NCV 05000390,05000391/2023002-01 Management

Open/Closed

The inspectors identified a Green finding and associated non-cited violation (NCV) of 10 CFR

50.65(a)(2) for failure to demonstrate the effective control of performance of a maintenance

rule scoped system through appropriate preventive maintenance. Specifically, the licensee

failed to adequately monitor performance of the shutdown board room (SDBR) heating

ventilation and air conditioning system (HVAC), a maintenance rule scoped system, in

accordance with their preventive maintenance program and did not implement (a)(1) goals

and corrective actions.

Failure to adequately implement ERCW Surveillance Test Procedure

Cornerstone Significance Cross-Cutting Report

Aspect Section

Mitigating Green [H.14] - 71111.24

Systems NCV 05000390,05000391/2023002-02 Conservative

Open/Closed Bias

The inspectors identified a Green finding and associated NCV of Technical Specification (TS)

5.7.1.1 a. The applicable procedures recommended in Regulatory Guide 1.33, Revision 2,

Appendix A, February 1978. Specifically, failure to implement Section 6.4 of 0-SI-67-917-A

Revision 021, Essential Raw Cooling Water Pumps A-A and B-A Comprehensive Pump Test,

and 0-SI-67-918-A, Revision 022, Essential Raw Cooling Water Pumps C-A and D-A

Comprehensive Pump Test, and Appendix F of these procedures were not performed.

Specifically, failure to perform these sections did not ensure that the system was restored to

its normal alignment.

Additional Tracking Items

None

2

PLANT STATUS

Unit 1 began the inspection period at rated thermal power (RTP). On April 14, 2023, the unit

was shutdown for a planned refueling outage (U1R18). The unit was returned to 100 percent

RTP on May 15, 2023. On May 16, 2023, the unit was down powered to 39% due to a Low-

Pressure Feedwater Heater string isolation and dropped rod (M4). The unit was returned to 100

percent RTP on May 20, and remained there for the remainder of the inspection period.

Unit 2 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed activities described in IMC 2515,

Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of

IPs. The inspectors reviewed selected procedures and records, observed activities, and

interviewed personnel to assess licensee performance and compliance with Commission rules

and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1) Unit 1 Residual Heat Removal system (both trains) on April 20th, 2023.

(2) Units 1 & 2 Spent Fuel Pool Cooling system on April 26th, 2023.

(3) Unit 1 Auxiliary Feedwater System on June 28, 2023.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a

walkdown and performing a review to verify program compliance, equipment functionality,

material condition, and operational readiness of the following fire areas:

(1) Intake Pumping Station (Elevations 711', 722' and 741') on May 24, 2023.

(2) Cable Spreading Room (Control Building Elevation 729' and 741') on June 5, 2023.

(3) Unit 1 Control Rod Drive Equipment Room, Pressurizer Heater Transformer Room,

and Miscellaneous Equipment Room (Auxiliary Building Elevations 782' and 786') on

June 26, 2023.

(4) Auxiliary Building Corridor (Elevation 676') on June 27, 2023.

3

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an

announced fire drill on May 31, 2023.

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated internal flooding mitigation protections in the Unit 1 and 2

turbine driven auxiliary feedwater pump rooms on June 29, 2023.

71111.08P - Inservice Inspection Activities (PWR)

The inspectors verified that the reactor coolant system boundary, reactor vessel internals, risk-

significant piping system boundaries, and containment boundary are appropriately monitored for

degradation and that repairs and replacements were appropriately fabricated, examined and

accepted by reviewing the following activities from April 24, 2023, to April 27, 2023:

PWR Inservice Inspection Activities Sample - Nondestructive Examination and Welding

Activities (IP Section 03.01) (1 Sample)

The inspectors verified that the following nondestructive examination and welding activities

were performed appropriately:

(1) Ultrasonic Examination (UT)

MRP-146-CL-1, Pipe to Nozzle, Augmented (reviewed)

MRP-146-CL-2, Pipe to Nozzle, Augmented (reviewed)

Visual Examination (VT)

Bare metal visual of the Reactor Vessel Closure Head, N-729-6 (reviewed)

PWR Inservice Inspection Activities Sample - Vessel Upper Head Penetration Inspection

Activities (IP Section 03.02) (1 Sample)

The inspectors verified that the license conducted the following vessel upper head

penetration inspections and addressed any identified defects appropriately:

(1) Bare metal visual of the Reactor Vessel Closure Head, N-729-6 (reviewed)

PWR Inservice Inspection Activities Sample - Boric Acid Corrosion Control Inspection Activities

(IP Section 03.03) (1 Sample)

The inspectors verified the licensee is managing the boric acid corrosion control program

through a review of the following evaluations:

(1) Boric Acid Walkdown - April 17, 2023

CR 1739795

CR 1850475

4

CR 1850485

CR 1850488

CR 1850494

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(2 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the control

room for the following activities:

Unit 1 Startup on May 11, 2023

Dropped Rod recovery on May 18, 2023

(2) The inspectors observed and evaluated licensed operator performance in the control

room during the following activities:

Unit 1 shutdown activities on April 14, 2023

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated the following licensed operator requalification

(LOR) simulator scenarios (LOR training cycle 2302), which included a reactor

coolant system (RCS) loop 2 T cold failing high, a small break loss-of coolant

accident (LOCA), and a large break LOCA.

Crew 5A on June 1, 2023

Crew 5B on June 1, 2023

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following

structures, systems, and components (SSCs) remain capable of performing their intended

function:

(1) System 31 - Shutdown Board Room HVAC and timeliness of placing the system in

(a)1 status, CR 1848149 documented this condition on April 4, 2023, and inspectors

reviewed the CR and Maintenance Rule (a)1 evaluation during May 2023.

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to

ensure the following SSC remains capable of performing its intended function:

(1) Electrical cable termination on safety related cables in the RCS on April 25, 2023.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (7 Samples)

5

The inspectors evaluated the accuracy and completeness of risk assessments for the

following planned and emergent work activities to ensure configuration changes and

appropriate work controls were addressed:

(1) Unit 1 shutdown activities for refueling outage April 14 - 15, 2023.

(2) Unit 1 Blackout testing & Mode 5 & 6 activities during the week of April 16, 2023.

(3) Risk assessment for (week of) April 23, 2023, with testing on the A train shutdown

board and the Unit 1 core having been off-loaded.

(4) RWST level switch troubleshooting and repair on May 17, 2023, under

WO 123741821 and CR 1856924.

(5) Dropped rod troubleshooting and recovery under CR 1856992 and WO 123741325

on May 17, 2023.

(6) Unit 1 elevated risk due to A train essential raw cooling water (ERCW) pump

troubleshooting and comprehensive testing on May 23, 2023, under WO 123109038.

(7) Unit 1 elevated risk due to Delta T/TAVG channel tuning being extended to a second

workday under WO 122773491 on May 24, 2023, and May 25, 2023.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (1 Sample)

The inspectors evaluated the licensee's justifications and actions associated with the

following operability determinations and functionality assessments:

(1) Operability evaluation of A train ERCW pumps documented in CR 1858712 and

Immediate Determination of Operability documented in EWR 123753097 on May 25,

2023.

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

(2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) WBN-2021-031-002, Temporary chiller to support replacement of B train shutdown

board room chiller on June 30, 2023.

(2) WO TM - 122006136, Installation of an electrical jumper (which supports auto-start

logic for SDBR A chiller package) while the SDBR B chiller package is out-of-service

for maintenance on June 30, 2023.

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated refueling outage 1R18 activities from April 14, 2023, to

May 12, 2023.

71111.24 - Testing and Maintenance of Equipment Important to Risk

6

The inspectors evaluated the following testing and maintenance activities to verify system

operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (6 Samples)

(1) Surveillance Instruction 1-SI-32-901-A, Valve Full Stroke Exercising during Cold

Shutdown Control Air (Train A), following maintenance of 1-FCV-32-80 and 1-FCV-

32-110, on April 27, 2023 (WO 122771552).

(2) Surveillance Instruction 1-SI-74-905-A, Residual Heat Removal Pump 1A-A

Comprehensive Test during refueling outages, following pump rebuild, on April 28,

2023 (WO 122772523).

(3) Surveillance Instruction 1-SI-72-906-A, Containment Spray Valve Position Indication

Verification / Full Stroke Exercising (Train A), following maintenance of 1-FCV-72-2,

on April 30, 2023 (WO 122772211).

(4) Surveillance Instruction 1-SI-72-908-A, Containment Spray Pump 1A-A

Comprehensive Pump Test, following a motor replacement, on April 30, 2023 (WO 123456131).

(5) Surveillance Instruction 1-SI-3-920, Valve Position Indication Verification AFW

System Turbine Driven AFW Train, following Level Control Valve maintenance on the

Unit 1 TDAFW, on May 3, 2023 (WO 122772376).

(6) Surveillance Instruction 1-SI-3-901-A, Motor Driven Auxiliary Feedwater Pump 1A-A

Quarterly Performance Test, following maintenance of 1-CKV-3-815, on May 3, 2023

(WO 123590770).

Surveillance Testing (IP Section 03.01) (3 Samples)

(1) Surveillance Instruction 0-SI-82-3, Loss of Offsite Power with Safety Injection - DG

1A-A, on April 16-17, 2023 (WO 122771788).

(2) Surveillance Instruction 0-SI-82-19-A, 184 Day Fast Start and Load Test DG 2A-A, on

May 16, 2023 (WO 123108830).

(3) Surveillance Instructions 0-SI-67-917-A and 0-SI-67-918-A, A train Essential Raw

Cooling Water (ERCW) Comprehensive Tests, on May 30, 2023 (WOs 123765351

and 123765355).

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) Surveillance Instruction 1-SI-63-907, Residual Heat Removal Hot Leg and Cold Leg

Injection Check Valve Testing During Refueling Outages, on April 18, 2023 (WO 122771649).

Containment Isolation Valve (CIV) Testing (IP Section 03.01) (1 Sample)

(1) Surveillance Instruction 1-SI-43-701-A, Containment Isolation Valve Local Leak Rate

Test Post Accident Sampling (X-86A), on April 24, 2023 (WO 122772805).

Ice Condenser Testing (IP Section 03.01) (1 Sample)

(1) Surveillance Instruction 1-SI-61-2, Unit 1 Ice Weighing, from April 30, 2023, to

May 7, 2023, (WO 122771773).

71114.06 - Drill Evaluation

7

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)

(1 Sample)

(1) The inspectors observed the sites response to an emergency preparedness drill on

April 5, 2023. This drill involved a reactor coolant system leak that started small and

progressed into a larger break. As the refueling water storage tank drained due to

injection into the core, a transfer to cold leg recirculation was required but both

containment sump recirculation valves failed to open so the emergency core cooling

system pumps and containment spray pumps had to be turned off which led to

inadequate core cooling and a general emergency declaration.

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated how the licensee identifies the magnitude and extent of

radiation levels and the concentrations and quantities of radioactive materials and

how the licensee assesses radiological hazards.

Instructions to Workers (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated how the licensee instructs workers on plant-related

radiological hazards and the radiation protection requirements intended to protect

workers from those hazards.

Contamination and Radioactive Material Control (IP Section 03.03) (2 Samples)

The inspectors observed/evaluated the following licensee processes for monitoring and

controlling contamination and radioactive material:

(1) Material stored in spent fuel pool

(2) Licensee surveys of potentially contaminated material leaving the Radiologically

Controlled Area.

Radiological Hazards Control and Work Coverage (IP Section 03.04) (3 Samples)

The inspectors evaluated the licensee's control of radiological hazards for the following

radiological work:

(1) Unit 1 reactor vessel head lift

(2) Refuel floor activities

(3) Unit 1 reactor vessel defueling

High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (5 Samples)

The inspectors evaluated licensee controls of the following High Radiation Areas and Very

High Radiation Areas:

8

(1) Unit 1 entry to under-vessel area

(2) Tritiated drain collector tank

(3) Waste packaging area

(4) Unit 2 pipe chase

(5) Unit 1 regenerative heat exchanger

Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section

03.06) (1 Sample)

(1) The inspectors evaluated radiation worker and radiation protection technician

performance as it pertains to radiation protection requirements.

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01) (1 Sample)

The inspectors evaluated the configuration of the following permanently installed ventilation

systems:

(1) Main Control Room Emergency Ventilation System

Temporary Ventilation Systems (IP Section 03.02) (1 Sample)

The inspectors evaluated the configuration of the following temporary ventilation systems:

(1) High Efficiency Particulate Air unit in use for Unit 1 seal table work

Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees use of respiratory protection devices.

Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated the licensees use and maintenance of self-contained

breathing apparatuses.

71124.04 - Occupational Dose Assessment

Source Term Characterization (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to radioactive source

term characterization.

External Dosimetry (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated how the licensee processes, stores, and uses external

dosimetry.

Internal Dosimetry (IP Section 03.03) (1 Sample)

The inspectors evaluated the following internal dose assessments:

9

(1) Reviewed three positive whole body count records from 06/01/2021 to 05/17/2023

Special Dosimetric Situations (IP Section 03.04) (2 Samples)

The inspectors evaluated the following special dosimetric situations:

(1) Reviewed three declared pregnant worker records from 06/01/2021 to 05/17/2023

(2) Reviewed three multi-badging records from 06/01/2021 to 05/17/2023

71124.05 - Radiation Monitoring Instrumentation

Walkdowns and Observations (IP Section 03.01) (10 Samples)

The inspectors evaluated the following radiation detection instrumentation during plant

walkdowns:

(1) Area Radiation Monitors (ARMs) in the auxiliary building

(2) ARMs in the turbine building

(3) ARMs on the refueling floor

(4) Small Article Monitors (SAMs) at the exit to the radiologically controlled area (RCA)

(5) Portal Monitors (PMs) at the exit to the RCA

(6) Personnel Contamination Monitors (PCMs) at the exit to the RCA

(7) Portable ion chamber survey meter ready for use in the instrumentation lab

(8) Telepole radiation survey meter ready for use in the instrumentation lab

(9) REM Ball neutron survey meter ready for use in the instrumentation lab

(10) AMP-100 GM ratemeter ready for use in the instrumentation lab

Calibration and Testing Program (IP Section 03.02) (14 Samples)

The inspectors evaluated the calibration and testing of the following radiation detection

instruments:

(1) Waste Packaging Area Radiation Monitor, 0-RE-90-3

(2) Unit 2 Upper Containment High Range Radiation Monitor, 2-RE-90-271

(3) Unit 2 Lower Containment High Range Radiation Monitor, 2-RE-90-273

(4) SAM-12s, TVA no. 848507

(5) GEM-5s (PM), TVA no. 848514

(6) ARGOS-5ABs (PCM), TVA no. 848606

(7) Ludlum 9-3 ion chamber survey meter, TVA no. 952051

(8) Telepole II survey meter, TVA no. 952194

(9) RadEye-G survey meter, TVA no. 951239

(10) Ludlum 12-4 / REM Ball neutron survey meter, TVA no. 951093

(11) AMS-4 continuous air monitor, TVA no. 860405

(12) Steadfast II whole body counter

(13) Ludlum Model-177 benchtop counter, TVA no. 07212

(14) DMC 3000 self-reading dosimeter, serial no. A1DCE9

Effluent Monitoring Calibration and Testing Program Sample (IP Section 03.03) (2 Samples)

10

The inspectors evaluated the calibration and maintenance of the following radioactive

effluent monitoring and measurement instrumentation:

(1) Unit 2 Shield Building Vent Radiation Monitor, 2-RE-90-400

(2) Waste Disposal System Liquid Effluent Monitor, 0-RE-90-122

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) April 4, 2022, through May 17, 2023

71152A - Annual Follow-up Problem Identification and Resolution

Annual Follow-up of Selected Issues (Section 03.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program

related to the following issues:

(1) Qualified Safety Culture Assessors performed a follow-up corrective action inspection

the week of May 1, 2023. The scope of this inspection included review of corrective

actions taken following identification of safety conscious work environment (SCWE)

concerns in the Watts Bar Chemistry Department as observed in NRC Inspection

Report 05000390, 391/2022003 and ML 23128A275. The May 2023, team

conducted interviews and focus groups of impacted licensee staff and leadership.

71152S - Semiannual Trend Problem Identification and Resolution

Semiannual Trend Review (Section 03.02) (1 Sample)

(1) The inspectors reviewed the licensees corrective action program for potential

adverse trends in the area of procedure use and adherence in the operations

department that might be indicative of a more significant safety issue.

71153 - Follow Up of Events and Notices of Enforcement Discretion

Personnel Performance (IP section 03.03) (2 Samples)

(1) The inspectors evaluated the B train low pressure feedwater heater isolation and

subsequent dropped control bank rod and licensees performance on May 16, 2023.

(2) The inspectors evaluated operator performance during an unanticipated Unit 2 trip

from an intermittent failure of the Current Transformer (CT) 252 on June 29, 2023.

Reporting (IP section 03.05) (1 Sample)

(1) Inspectors evaluated the licensee submittal of Event Notification 55441 eight-hour

notification under 10 CFR 50.72(b)(3)(ii)(B) for unanalyzed condition of 2A EDG.

11

INSPECTION RESULTS

Failure to demonstrate effective control of performance of a maintenance rule (a)(2) system

Cornerstone Significance Cross-Cutting Report

Aspect Section

Mitigating Green [H.3] - Change 71111.12

Systems NCV 05000390,05000391/2023002-01 Management

Open/Closed

The inspectors identified a Green finding and associated non-cited violation (NCV) of 10 CFR

50.65(a)(2) for failure to demonstrate the effective control of performance of a maintenance

rule scoped system through appropriate preventive maintenance. Specifically, the licensee

failed to adequately monitor performance of the shutdown board room (SDBR) heating

ventilation and air conditioning system (HVAC), a maintenance rule scoped system, in

accordance with their preventive maintenance program and did not implement (a)(1) goals

and corrective actions.

Description: While reviewing reliability and availability data for the SDBR HVAC system

(system 031, function 030-K) from December 1, 2020, to, January 30, 2023, the inspectors

identified that the licensee had changed the plant configuration of the system from the

described configuration in the UFSAR.

UFSAR section 9.4.3.2.4 Shutdown Board Room Air-Conditioning System states in part that

The electrical boards for either unit can provide the service necessary for the safe shutdown

of both plant units following an accident in either unit. Environmental control (for the shutdown

boards) is provided by four fan-coil air-handling units supplied with chilled water from two

100% redundant water chillers. One of the two redundant chillers is normally operating, and

the other is in standby.

As of February 10, 2022, the licensee modified the plant configuration under TMOD WBN-0-

2021-031-002, to install a temporary non-safety related chiller for the B train SDBR chiller.

This non-safety related chiller has been in service providing environmental control for the

SDBRs since this date and the A train SDBR room chiller was placed in standby and has not

been started or run since. Without performance data required to support (a)(2) status start or

run demands the reliability of the A train of SDBR could not be assessed.

The licensees procedure NPG-SPP-03.4, Maintenance Rule, Performance Indicator

Monitoring, Trending and Reporting - 10CFR50.65, Section 3.2.6 A. directs licensee staff to

change monitoring status from (a)(2) to (a)(1) when performance data required to support

(a)(2) status is no longer collected or available.

Hence, NPG-SPP-03.4 required the licensee to change the status of this system from (a)(2)

to (a)(1) which they failed to do until the NRC brought this to the sites attention on January

30, 2023.

Corrective Actions: Following the meeting with the NRC on January 30, 2023, the site moved

the SDBR HVAC system (system 031, function 030-K) from (a)(2) to (a)(1) and created an

(a)(1) evaluation in accordance with their procedure NPG-SPP-03.4. The (a)(1) evaluation

was presented to the maintenance rule expert panel on February 16, 2023, and the (a)(1)

plan was approved by the maintenance rule expert panel on March 22, 2023. The site also

entered this condition into their corrective action plan as CR 1848149.

12

Corrective Action References: CR 1848149

Performance Assessment:

Performance Deficiency: The inspectors determined that the licensees failure to adequately

implement the requirements of NPG-SPP-03.4, Maintenance Rule, Performance Indicator

Monitoring, Trending and Reporting - 10CFR50.65, Revision 5 was a performance

deficiency reasonably within the licensees ability to foresee and prevent.

Screening: The inspectors determined the performance deficiency was more than minor

because it was associated with the Equipment Performance attribute of the Mitigating

Systems cornerstone and adversely affected the cornerstone objective to ensure the

availability, reliability, and capability of systems that respond to initiating events to prevent

undesirable consequences. Specifically, due to a lack of any performance or condition

monitoring of the A Train of the SDBR HVAC system the licensee failed to demonstrate that

the performance of the system is being effectively controlled through maintenance. This

condition is similar to the Inspection Manual Chapter 0612 Appendix E more than minor

Example 8.g.

Significance: The inspectors assessed the significance of the finding using IMC 0609

Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The

inspectors assessed the significance of the finding using Inspection Manual Chapter 0609,

attachment 04, Initial Characterization of Findings, and determined that the finding was

associated with the Mitigating Systems cornerstone. Using Inspection Manual Chapter 0609,

appendix A, The Significance Determination Process For Findings At-Power, exhibit 2,

Mitigating Systems Screening Questions, section A, the screening questions, were all

answered a NO; therefore, the inspectors determined the finding was of very low safety

significance (Green).

Cross-Cutting Aspect: H.3 - Change Management: Leaders use a systematic process for

evaluating and implementing change so that nuclear safety remains the overriding priority.

The inspectors determined that the finding has a cross-cutting aspect of Change

Management - H.3 in the Human Performance area because the licensee failed to use a

systematic process for evaluating and implementing change so that nuclear safety remains

the overriding priority. Specifically, when the plant was modified by TMOD WBN-0-2021-031-

002 no maintenance rule evaluation was conducted the SDBR HVAC system.

Enforcement:

Violation: 10 CFR 50.65(a)(1), requires, in part, each holder of an operating license for a

nuclear power plant under this part shall monitor the performance or condition of structures,

systems, or components, against licensee-established goals, in a manner sufficient to provide

reasonable assurance that these structures, systems, and components, as defined by 10 CFR 50.65(b), are capable of fulfilling their intended functions.

10 CFR 50.65(a)(2), requires, in part, that monitoring as specified in 10 CFR 50.65(a)(1) is

not required where it has been demonstrated that the performance or condition of a structure,

system, or component is being effectively controlled through the performance of appropriate

preventive maintenance, such that the structure, system, or component remains capable of

performing its intended function.

Contrary to the above, from January 15, 2022, until March 22, 2023, the licensee failed to

13

demonstrate that the performance or condition of a structure, system, or component was

being effectively controlled through the performance of appropriate preventive maintenance,

such that the structure, system, or component remained capable of performing its intended

function. Specifically, the licensee failed to demonstrate that the performance of the A SDBR

HVAC system was being effectively controlled such that the system remained capable of

performing its intended function.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with

Section 2.3.2 of the Enforcement Policy.

Failure to adequately implement ERCW Surveillance Test Procedure

Cornerstone Significance Cross-Cutting Report

Aspect Section

Mitigating Green [H.14] - 71111.24

Systems NCV 05000390,05000391/2023002-02 Conservative

Open/Closed Bias

The inspectors identified a Green finding and associated NCV of Technical Specification (TS) 5.7.1.1 a. The applicable procedures recommended in Regulatory Guide 1.33, Revision 2,

Appendix A, February 1978. Specifically, failure to implement Section 6.4 of 0-SI-67-917-A

Revision 021, Essential Raw Cooling Water Pumps A-A and B-A Comprehensive Pump Test,

and 0-SI-67-918-A, Revision 022, Essential Raw Cooling Water Pumps C-A and D-A

Comprehensive Pump Test, and Appendix F of these procedures were not performed.

Specifically, failure to perform these sections did not ensure that the system was restored to

its normal alignment.

Description: On May 30, 2023, the NRC inspectors reviewed the completed surveillance

tests packages of Essential Raw Cooling Water (ERCW) Train A Comprehensive Pump

Testing Surveillances 0-SI-67-917-A Rev 021 (Essential Raw Cooling Water Pumps A-A and

B-A Comprehensive Pump Test) and 0-SI-67-918-A Rev 022 (Essential Raw Cooling Water

Pumps C-A and D-A Comprehensive Pump Test). ERCW Comprehensive Pump tests were

performed on 30 May 2023.

During their review, the inspectors observed that the licensee had not performed Appendix F

in either procedure. Appendix F in either procedure has a Note that states, in part, that the

next steps ensure ERCW flow to the CS and SI Pump Room coolers. Specifically, from May

30, 2023, to June 1, 2023, the licensee failed to implement all portions of these Surveillance

procedures. 0-SI-67-917/918-A, Section 6.4 Return to Normal Alignment, steps 12 and 9,

respectively, state: Perform Appendix F to check ERCW flow to RHR Pump Room Cooler

1A-A. This step was marked NA due to the installed flow meter being out of service.

The NRC inspectors brought the condition to the attention of the operations department

leadership (CR 1859940). Comprehensive pump test alignment has the potential to cause

shifts in debris due to opening the cross connection between A and B Trains of ERCW, which

has resulted in blockage of some safety related coolers. Licensee staff performed WO 123771615 conditional performance of 1-TI-67.001 Rev 007 (Component Flow Blockage

Testing Essential Raw Cooling Water (Train A)) Attachment 4 (Flow Blockage Testing - SI,

CS, and RHR Pump Room Cooler 1A), which validated that there was adequate flow to the

ECCS components. The test was completed satisfactory on June 01, 2023, at 03:54.

14

Corrective Actions: Condition was documented in a condition report, additional testing under

WO 123771615 was performed to provide objective evidence that the A Train ERCW system

was restored to proper alignment post ERCW pump testing.

Corrective Action References: CR 1859940

Performance Assessment:

Performance Deficiency: The inspectors determined that the licensees failure to adequately

implement Section 6.4 Step [12] of 0-SI-67-917-A Rev 021 and Section 6.4 Step [9] of 0-SI-

67-918-A Rev 022 was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor

because it was associated with the Configuration Control attribute of the Mitigating Systems

cornerstone and adversely affected the cornerstone objective to ensure the availability,

reliability, and capability of systems that respond to initiating events to prevent undesirable

consequences. Specifically, the licensee failed to implement procedure steps to ensure

ERCW flow to safety related room coolers that are required to function after an accident to

ensure continued operation of the supported pumps.

Significance: The inspectors assessed the significance of the finding using IMC 0609

Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The

inspectors assessed the significance of the finding using IMC 0609 Appendix A, The

Significance Determination Process (SDP) for Findings At-Power. The inspectors assessed

the significance of the finding using IMC 0609 Appendix A, The Significance Determination

Process (SDP) for Findings At-Power. The inspectors performed a review of this finding

using the guidance provided in IMC 0609, Appendix A, Exhibit 2, Mitigating Systems

Screening Questions, and determined this finding is of very low safety significance (Green)

because the answer to all 6 questions was NO. For Question 6 if NO screen as Green.

Cross-Cutting Aspect: H.14 - Conservative Bias: Individuals use decision making-practices

that emphasize prudent choices over those that are simply allowable. A proposed action is

determined to be safe in order to proceed, rather than unsafe in order to stop. The inspectors

determined that the finding has a cross-cutting aspect of H.14 - Conservative Bias because

the licensee lacked the appropriate risk sensitivity to restoration of the ERCW system after

performance of the comprehensive pump testing and failed to exercise procedure adherence

during system restoration.

Enforcement:

Violation: Unit 1 and Unit 2 Technical Specifications 5.7.1.1 a., requires, in part, that written

procedures shall be established, implemented and maintained for the applicable procedures

recommended in Regulatory Guide 1.33 Revision 2, Appendix A February 1978. Regulatory

Guide 1.33 Revision 2 Appendix A 8.b.(1)(f) requires, in part, that; specific procedures for

surveillance tests are required for each surveillance test listed in technical specifications such

as Service Water System Functional Tests.

0-SI-67-917-A Rev 021 (Essential Raw Cooling Water Pumps A-A and B-A Comprehensive

Pump Test) and 0-SI-67-918-A Rev 022 (Essential Raw Cooling Water Pumps C-A and D-A

Comprehensive Pump Test) are Surveillance procedures that perform Inservice Testing for

the ERCW pumps. The licensee established 0-SI-67-917-A Rev 021 and 0-SI-67-918-A Rev

022 to verify the operational readiness of the ERCW pumps and provide for a partial

determination that the Train A ERCW check valves stroke open or closed. Specifically,

15

Section 6.4 Return to Normal Alignment Step [12] in 0-SI-67-917-A and Step [9] in 0-SI-918-A

directed the licensee to PERFORM Appendix F to check ERCW Flow to RHR Pump Room

Cooler 1A-A.

Contrary to the above, on May 30, 2023, the licensee failed to implement Section 6.4 Step

[12] of 0-SI-67-917-A and Section 6.4 Step [9] of 0-SI-67-918-A. Specifically, failure to

perform Appendix F of 0-SI-67-917-A and 0-SI-67-918-A resulted in failure to ensure that

adequate flow was established to the safety related coolers on the A Train ERCW.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with

Section 2.3.2 of the Enforcement Policy.

Assessment 71152A

Qualified Safety Culture Assessors performed a follow-up corrective action inspection the

week of May 1, 2023. The scope of this inspection included review of corrective actions taken

following identification of SCWE concerns in the Watts Bar Chemistry Department as

observed in Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 (ML23128A275). The May 2023 team conducted

interviews and focus groups of impacted licensee staff and leadership.

The team found that the corrective actions put into place to correct previously identified work

environment issues in this department appear to have been effective. TVA staff engaged by

the inspection team reported willingness to raise safety concerns through multiple avenues

out of fear of retaliation including willingness to use employee concerns and corrective action

programs. The agency will continue to monitor SCWE concerns at Watts Bar via the Resident

Inspectors and baseline inspection under reactor oversight program.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On August 3, 2023, the inspectors presented the integrated inspection results to Mr.

Anthony Williams, Site VP, and other members of the licensee staff.

On April 27, 2023, the inspectors presented the ISI inspection results to Mr. Anthony

Williams, Site VP, and other members of the licensee staff.

On May 18, 2023, the inspectors presented the Radiation Protection inspection results to

Mr. Anthony Williams, Site VP, and other members of the licensee staff.

On July 27, 2023, the inspectors presented the initial integrated inspection results to

Mrs. Beth Jenkins, Watts Bar Plant Manager, and other members of the licensee staff.

THIRD PARTY REVIEWS

Inspectors reviewed World Association of Nuclear Operators (WANO) report that was issued

during October 2022. No safety significance issues were identified.

16

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.04 Drawings 0-47W855-1-ISI Mechanical - Flow Diagram Fuel Pool Cooling And Cleaning Revision 0

System

1-47W810-1-ISI Unit 1 Flow Diagram Residual Heat Removal System Revision 0

WBN-47W803-1 Flow Diagram Feedwater Revision 39

WBN-47W803- Stress Analysis Problem Boundary Drawing Feedwater Revision 2

101

Procedures 0-SOI-78.01 Spent Fuel Pool Cooling and Cleaning System Revision

0042

0-SOI-78.01 ATT Spent Fuel Pool Cooling and Cleaning System Valve Revision 10

1V Checklist

1-SOI-3.02 System Operating Instruction, Auxiliary Feedwater System Revision 30

1-SOI-74.01 Residual Heat Removal System Revision

0022

71111.05 Calculations EPMDOM- Combustible Loading Data 0148

012990

Fire Plans CON-0-729-01 Control Building Elevations 729 & 741 002

CON-0-729-01 Control Building Elevations 729 & 741 003

MAP

WBN-PFP-AUX- Pre-Fire Plan for the Auxiliary Building Corridor Elevation 676Revision 3

0-676-01

WBN-PFP-AUX- Pre-Fire Plan for the Auxiliary Building Elevation 772 Revision 5

0-772-05, Rev. 5

WBN-PFP-AUX- Pre-Fire Plan for the Auxiliary Building Elevation 786 Revision 2

0-786-01

Miscellaneous TVA 41419 Fire Drill Evaluation Report May 31,

2023

Procedures WBN-NPG-SPP- Transient Combustibles Revision 18

18.4.7

71111.06 Procedures MDN-000-999- WBN Probabilistic Risk Assessment - Internal Flooding Revision 4

2008-0146 Analysis Notebook

WB-DC-40-31.51 Evaluating the Effects of Flooding due to Moderate Energy Revision 5

Pipe Failures Inside and Outside Containment

17

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.12 Miscellaneous Inspection Report QC Inspection Report Number 4/25/2023

Number: 868414

W47 230412 500 QC certifications for Darrick L. Handy 9/19/2022

71111.18 Procedures 0-SOI-30.07 Shutdown Board Rooms HVAC EL 757 & 772 0026

0-TI-31.004 Installation and Operation of Temporary Chiller for B SDBR 000

Chiller

NPG-SPP-09.4 10 CFR 50.59 Evaluations of Changes, Tests, and 0018

Experiments

71111.20 Corrective Action CR 1855245 NRC Identified Containment Debris following Mode 4 05/9/2023

Documents containment closeout

Resulting from

Inspection

71111.24 Corrective Action CR 1856847 (NRC Identified) Update DG test procedures to include 05/16/2023

Documents alternate method of cylinder measurement.

Resulting from

Inspection

Procedures 0-MI-61.06 Servicing Ice Condenser Revision 13

0-SI-67-917-A Essential Raw Cooling Water (ERCW) Pump A-A and Pump Revision 21

B-A Comprehensive Tests

0-SI-67-918-A Essential Raw Cooling Water (ERCW) Pump C-A and Pump Revision 22

D-A Comprehensive Tests

0-SI-82-19-A 184 Day Fast Start and Load Test DG 2A-A Revision 37

0-SI-82-3 Loss of Offsite Power With Safety Injection - DG 1A-A Revision 80

1-SI-3-901-A Motor Driven Auxiliary Feedwater Pump 1A-A Quarterly Revision 40

Performance Test

1-SI-32-901-A Valve Full Stroke Exercising during Cold Shutdown Control Revision 22

Air (Train A)

1-SI-43-701-A Containment Isolation Valve Local Leak Rate Test Post Revision 13

Accident Sampling

1-SI-61-2 Unit 1 Ice Weighing Revision 25

1-SI-63-907 Residual Heat Removal Hot Leg and Cold Leg Injection Revision 36

Check Valve Testing During Refueling Outages

1-SI-72-906-A Containment Spray Valve Position Indication Verification / Revision 18

Full Stroke Exercising (Train A)

18

Inspection Type Designation Description or Title Revision or

Procedure Date

1-SI-72-908-A Containment Spray Pump 1A-A Comprehensive Pump Test Revision 6

1-SI-74-905-A Residual Heat Removal Pump 1A-A Comprehensive Test Revision 8

during refueling outages

1-TI-61.003 Containment Debris Log Revision 2

1-TI-61.005 Manipulation and Use of ICEMAN Data Revision 0

TI-100.001 Inservice Testing of Pumps Revision 19

TI-100.002 Inservice Testing of Valves Revision 17

71114.06 Miscellaneous 2023 WBN April Training Drill (Team B) Package 4/5/2023

71124.01 Corrective Action CR 1850900

Documents CR 1857250

Resulting from CR 1857499

Inspection CR 1857503

Miscellaneous NuclearIQ Database, tritium concentrations in the spent fuel 03/18/23 -

pool 04/19/23

Procedures NISP-RP-002 Radiation and Contamination Surveys Rev. 1

NISP-RP-004 Radiological Posting and Labeling Rev 1

NISP-RP-007 Control of Radioactive Material Rev 1

RCI-137 Radiation Protection Tritium Control Program Rev 9

Radiation 140423105 1R18 Upper Containment Upper Containment Air Sample 04/14/2023

Surveys WBN-M- U1 A CCP Room 04/15/23

20230415-1

WBN-M- 772' Plenum Room Posting Update 05/16/23

20230516-7

Radiation Work 23160012 U1R18 Outage - Upper Containment High Radiation Area Rev 0

Permits (RWPs)

71124.03 Procedures RCI-107 Respiratory Protection Equipment Inspection, Maintenance, Rev 33

Issuance and Accountability

71124.04 Corrective Action CR 1851507

Documents

Resulting from

Inspection

Miscellaneous TVA RP Prospective Determination for Occupational Rev. 2

Exposure (2011-2018)

19

Inspection Type Designation Description or Title Revision or

Procedure Date

71124.05 Miscellaneous SSD-0-LPR-90-3 Scaling and Setpoint Document for Waste Package Area Rev. 11

Monitor

SSD-2-LPR-90- Scaling and Setpoint Document for Unit 2 Shield Building Rev. 22

400 Radiation Monitor

Procedures 2-SI-90-1 18 Month Channel Calibration Containment Upper Rev. 0005

Compartment High Range Post Accident Area Radiation

Monitor Loop 2-LPR-90-271-A

2-SI-90-3 18 Month Channel Calibration Containment Lower Rev. 0005

Compartment High Range Post Accident Area Radiation

Monitor Loop 2-LPR-90-273-A

71152A Corrective Action CR 1805670

Documents CR 1805670

71152S Corrective Action 1856930 Several Operations SIs do not have the correct Start and

Documents Stop times in Maximo

1856935 The surveillance task sheets (STS) for 13 vaulted

surveillances were not fully completed

1856945 Incomplete QA records in ECM

1858681 QA identified a deficiency associated with T-Mods not being

correctly closed

71153 Procedures WBN-2-GO-5 Unit Shutdown From 30% Reactor Power to Hot Standby Revision 9

WBN-ES-0.1 Reactor Trip Response Revision 26

20