ML24297A046

From kanterella
Revision as of 00:35, 29 October 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
American Centrifuge Plant (ACP) Integrated Inspection Report 07007004/2024003
ML24297A046
Person / Time
Site: 07007004
Issue date: 10/23/2024
From: Bradley Davis
NRC/RGN-II/DFRSS
To: Snider M
American Centrifuge Operating
References
IR 2024003
Download: ML24297A046 (1)


Text

Matt Snider General Manager American Centrifuge Operations, LLC (ACO)

P. O. Box 628 Mail Stop 7560 Piketon, OH 45661

SUBJECT:

AMERICAN CENTRIFUGE PLANT (ACP) - INTEGRATED INSPECTION REPORT 07007004/2024003

Dear Matt Snider:

This letter refers to the Nuclear Regulatory Commission (NRC) oversight activities conducted from July 1 to September 30, 2024, for the American Centrifuge Plant facility in Piketon, OH. During that time, the NRC did not conduct any inspection activities on-site that will be documented as part of the third quarter of calendar year 2024. The NRC did conduct a Material Control and Accounting inspection, the results of that inspection were documented separately as a stand-alone inspection report (ADAMS Accession # ML24226A445).

This letter and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Bradley J. Davis, Chief Fuels Oversight Branch 1 Division of Fuels, Radiological Safety, and Security Docket No. 07007004 License No. SNM-2011 cc:: Distribution via LISTSERVOctober 23, 2024 Signed by Davis, Bradley on 10/23/24

ML24297A046 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available

OFFICE RII/DFRSS RII/DFRSS

NAME L. Pitts B. Davis DATE 10/23/24 10/23/24